PIPE REQUIREMENT DETAILS OF ALL THREE CLUSTERS CLUSTER

ZONE - 1 ZONE - 2 ZONE - 3 EXCESS PIPE EXCESS PIPE


FINAL REQUIRED REQUIRE TOTAL
BALAN WILL SHIFT WILL SHIFT REQUIRE
BALANC TOTAL BALANCE PIPE PIPE AFTER D IN REQUIRED IN
DI CE BALANCE STOCK EXCESS FROM FROM D IN
DIA E DIA LENGTH NEEDED SHIFTING IN NANOW ALL THREE
A LENGT LENGTH PABRA NANOWAL PABRA
LENGTH MANDOLI AL CLUSTERS
H (M) (M)
100 1186 100 2539 100 1201.8 4720.8 834 4266.8 3887.3 4500 8387.3
150 2485 150 314 150 630.7 3706.7 219.5 3330.2 100 0 3487.2 260 3747.2
200 254.6 200 112 200 53 341.8 561 0 219.0 0.0 0.0
250 0 250 65 250 271.8 336.8 151 248.8 85.5 27.5 185.8 185.8
300 0 300 180 300 15 235.8 88.0 112.5 81 31.5 147.8 147.8
350 730 350 45 400 55 738 296 480 85 94.6 442.5 442.5
400 152.5 400 111.5 247 150.0 175.5 0 0 97.0 97.0
450 192 450 175 357 560 0 203 0.0 0.0
500 0 500 180 132 28 180 180 104.5 104.5
600 110 110 0 110 0 110.0 0 0 110.0
TOTA
5110.1 3721.5 2227.3 11041.9 2886 8903.8 422.0 8218.1 4500 260 13222.1
L

EXCESS PIPE LEFT IN ALL


THREE CLUSTER AFTER
SHIFTING
MAN PABRA NANO
DIA
DOLI WAL
100
150
200 219 34.5
250
300 29
350
400
450 203 4 32
500 2.5 122
600 0 0 0
422 41 183
PIPE REQUIREMENT
PABRA DETAILS OF ALL THREE
TOTAL PIPE
S.NO IN METERS
NEEDED
FINAL
1 100mm 4500
REQUIRED

4720.8 833.5 3887.3 3887.3


3706.7 219.5 3487.2 3487.2
341.8 561 219 0 0
151 -151 -151
235.8 88 147.8 147.8
738 295.5 442.5 442.5
150 -150 -150
357 560 203 0 0
132 27.5 104.5 104.5
0 0 0 0
2886 0 422 0 0 7768.3

EXCESS PIPE LEFT IN ALL


THREE CLUSTER AFTER
SHIFTING
MANDO PABRA NANO
LI WAL

219 34.5

29

203 4 32
2.5 122
0 0 0
422 41 183
PIPE REQUIREMENT
DETAILS OF ALL THREE
NANOW TOTAL PIPE
S.NO IN METERS
NEEDED
FINAL
AL 1 150mm 260
REQUIRED

4720.8 833.5 3887.3 3887.3


3706.7 219.5 3487.2 3487.2
341.8 561 219 0 0
151 -151 -151
235.8 88 147.8 147.8
738 295.5 442.5 442.5
150 -150 -150
357 560 203 0 0
132 27.5 104.5 104.5
0 0 0 0
2886 0 422 0 0 7768.3

EXCESS PIPE LEFT IN ALL


THREE CLUSTER AFTER
SHIFTING
MANDO PABRA NANO
LI WAL

219 34.5

29

203 4 32
2.5 122
0 0 0
422 41 183
PIPE REQUIREMENT
DETAILS OF ALL THREE
DIA MANDOLI PABRA NANOWAL

FINAL
100 0 0 0
REQUIRED

150 0 0 0

200 273.4 34.5 0 4720.8 833.5 3887.3 3887.3


250 0 0 0 3706.7 219.5 3487.2 3487.2
300 0 0 29 341.8 561 219 0 0
350 0 0 0 151 -151 -151
400 188 4 0 235.8 88 147.8 147.8
450 0 2.5 32 738 295.5 442.5 442.5
500 0 0 122 150 -150 -150
357 560 203 0 0
132 27.5 104.5 104.5
0 0 0 0
2886 0 422 0 0 7768.3

EXCESS PIPE LEFT IN ALL


THREE CLUSTER AFTER
SHIFTING
MANDO PABRA NANO
150
LI WAL
200
250
300 219 34.5
350
400 29
450
500
203 4 32
2.5 122
0 0 0
422 41 183