G/00/160 (254_GA) [Document No : 1MC03-SCJ_SEL-DS-REP-SS01-000006]

1. Boom-mid column connection


Dimensions that are noted on survey sketch14 contradict with the
dimensions of boom and mast that are noted in other drawings in the
survey, raising the need to request clarification about sketch14. Most
notable contradictions are the dimensions of the PFC columns that make
up mast B and the width of the boom truss.
Mast B consists of a twin PFC305x102 column according to sketch12 but
has a width of 432mm according to sketch 14. Please confirm the correct
dimensions.
The boom truss has a width of 600mm according to sketch2 while detail
4.1-sheet2 shows a width of 900mm. Please confirm the correct
dimensions.
The geometry of the boom-mid column connection on sketch14 does not
resemble the photos provided. The angle of the diagonals seems off.
Please confirm the correct dimensions of the details on sketch 14. See also
snaps from survey below:
2.Mast B foundation
It is unclear if mast B consists of a bolted steel base plate connection to the
foundation. On the photo, the foundation is covered with debris that hides a
possible base plate. Please confirm structural layout of the foundation after
removal of the debris on site.