6 5 4 3 2 1

1 2 3 4 5 6 7 8 9 10 11 12
D 3195 3940 3077 3077 3077 3184 3474 3405 2904 4596 2500 D

150 150 150 150 150 150 150 150 150 150 150
A
C1 C2 C3 C4 C5 C6 C7 C8 C9 C10 C11
150

150

150

150

150

150

150

150

150

150

150
6510

150

150 150 150 150 150 150 150 150 150 150
C12 C13 C14 C15 C16 C17 C18 C19 C20 C21
B
150 150

150 150

150 150

150 150

150 150

150 150

150 150

150

150
2500

150

150

150

150
C C22 C23 C24 C25 C26 C27 C28 C29 C30 C31 C32
150 150 150 150 150 150 150 150 150 150 150

C C
COLUMN CENTER LINE LAYOUT

NOTES :- 21.CAMBER OF 25 MM SHALL BE PROVIDED IN FORMWORK FOR 10m


10. COVER TO REINFORCEMENT IN R.C.C SHALL BE AS PER
1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE SPAN
B IS:456-2000 ( PAGE NO. 46) - MODERATE CONDITION . R0 02-04-17 FIRST SUBMISSION P BRIJESH B
SPECIFIED.
11.LONGITUDINAL STEEL OF GROUND & PLINTH BEAM SHALL PASS REV. DATE DESCRIPTION ISSUED SIGNATURE
2. FIGURED DIMENSIONS SHALL BE FOLLOWED AND DO NOT SCALE
THROUGH ALL COLUMNS. P = Preliminary A = Approval C = Construction
THE DRAWING.
12. ALL PLAIN CEMENT CONCRETE (P.C.C) SHALL BE 1:3:6 GRADE .
WESTERN RAILWAY
3. CONTRACTOR TO CHECK ALL DIMENSIONS BEFORE
13.LAP LENGTH OF THE BARS SHALL BE 50 TIMES DIA OF BAR. DIVISION : AHMEDABAD SECTION :- PNU - SIOB
COMMENCEMENT OF THE WORK.
14.DESIGN MIX.CONCRETE SHALL BE USED AS IS:10262. PALANPUR - SAMAKHIALI B.G. DOUBLING PROJECT
4. ALL STRUCTURAL DRAWINGS SHALL BE READ IN CONJUNCTION
15. ALL R.C.C WORK SHOULD BE CARRIED OUT AS PER STRUCTURAL NAME OF
PROPOSED STATION BUILDINGS AT VARIOUS
WITH ARCHITECTURAL DRAWINGS. ANY DISCREPANCY IN THE STATIONS BETWEEN MITHA - VAGHPURA SECTION OF
WORK :
DETAIL DRAWINGS. WR (PACKAGE-IV)
DRAWING(S) SHALL BE BROUGHT TO OUR NOTICE BEFORE CLIENT :
16. ALL BACKFILLING SHALL BE DONE WITH 95 % MODIFIED PROCTOR
COMMENCING THE WORK.
DENSITY AND UNIFORMLY ALL AROUND. (A Government of India Enterprise)
5. CLEAR COVER TO REINFORCEMENT SHALL BE USE 75mm IN
17.NO MORE FUTURE EXTENSION. THE DESIGN ONLY FOR GROUND NAME OF
FOOTING, 40mm IN COLUMN, 30mm IN BEAM AND 30mm IN SLAB. M/s DRA KIRAN-NSP (JV)
AGENCY :
FLOOR STOREY. AHMEDABAD - GUJARAT.
6. ALL R.C.C WORK SHALL BE WITH M:25 GRADE CONCRETE.
18. AS PER SOIL INVESTIGATION REPORT NO GROUND WATER TABLE DESIGN BY: APPROVED BY:
CONFORMING TO IS 456-2000, IS-13920, IS-1893 - 2002 CODE. DESIGN
IS FOUND AT DEPTH OF FOUNDATION DURING TIME OF SOIL CONSULTANT :
7. ALL REINFORCEMENT SHALL BE OF Fe500 D GRADE AS PER
INVESTIGATION.
!! Brij !!
DESIGNING & ENGINEERING SOLUTION
LATEST IS:1786:2008.
19.HENCE STRUCTURE IS NOT DESIGNED FOR UPLIFT PRESSURE, 715, Pratik Mall, Nr.Swaminarayan Dham, Koba Road,
A 8. THE BUILDING IS DESIGN TO WITHSTAND THE EARTHQUAKE Gandhinagar - 382-421, Mo.097140-07255, 081281-86174 A
HOWEVER IF DURING EXECUTION THE G.W.T IS OBSERVED THEN Ph. (079) 23600340, E-Mail:- design@brijconsultancy.com
EFFECT OF SEISMIC ZONE-IV. COLUMN CENTER LINE LAYOUT
WORK SHALL BE STOPPED & BROUGHT TO THE NOTICE OF TITLE :
9. AFTER EXCAVATION OF FOUNDATION S.B.C SHALL BE VERIFIED (BHABHAR)
CONSULTING ENGINEER. DRAWN BY : CLL PROJ. NO. : 1105_R
THE SOIL CONSULTANT FOR GIVEN FOUNDATION SYSTEM AND SHEET
20.GROUND WATER TABLE IS AVAILABLE CONTINUOUS DEWATERING DESIGNED BY : NRM DRG. NO. : ST-02 NO.
OKAY AFTER CONFIRMATION THEN WORK SHALL BE START.
SHALL BE DONE TO KEEP FOUNDATION TRENCH IN DRAWING CHECKED BY : BJK DATE : 25-02-17 01/01

CONDITION TILT IT ACHIEVES ITS FULL STRENGTH. SCALE : NTS SIZE : A2