Bill of Quantity - URAIAN

PROYEK / PROJECT WTP Morowali


Date issued : 04 juli 2022
LINGKUP / SCOPE of WORK INSTRUMENT & KONTROL OTOMASI Revision : 1

ITEM PEKERJAAN / ITEM of WORKS HARGA


No ( pengadaan & pemasangan / supply & install ) KODE Gbr JUMLAH SATUAN TOTAL ( Rp )
(Rp)
Catatan : Semua keterangan di bawah masing-masing item pekerjaan di BoQ ini adalah penjelasan umum/singkat saja. Keterangan yg lebih lengkap tentang ukuran, material/bahan,
finishing, jumlah, dll., adalah mengacu atau harus dilihat kembali kepada Dokumen Gambar Detail & Dokumen Spesifikasi Teknis & merupakan kesatuan yg tidak terpisahkan
dengan BoQ ini.

I PEKERJAAN INSTRUMENTASI DAN KONTROL

A Pekerjaan Instrument

1 Electromagnetic Flowmeter 3",Brand Supmea 2,00 pc 28.640.000 57.280.000


Elektromagnetik Type, DN 100 / 3 inch, Analog Output : 4-20mA, Supply : 220VAC,
- Akurasi : ±0.5%, Liner : PTFE, Communication: RS485, Connection : FLANGE JIS
150K, Material : Carbon Steel, Elektrode : SS316 L.
- Supply, Delivery, and Installation
-
2 Pressure Switch 1,00 2.250.000 2.250.000
- 0-10 Bar, Gauge pressure, 4...20mA; 1...5V; 0...10V; 0...5V; RS485 PID WTP
- Supply, Delivery, and Installation Morowali
and PLC -
3 PH sensor & Transmitter, Brand SUPMEA WTP 1,00 7.725.600 7.725.600
Smart Pressure Transmiter, 0-16 Bar, Connection GI/2", Body SS, Alumunium Morowali
- 10 & 20
Housing, Power 24 VDC, LCD Display, 4-20ma, RS 485
Supply, Delivery, and Installation M3/H
-
3 Float level for open tank non chemical tank 3,00 3.300.000 9.900.000
- Material PVC, double float contact, rating 1A, 40 va,Output 2 x spst contact
- Supply, Delivery, and Installation
-
4 Float level for open tank non chemical tank 3,00 300.000 900.000
- Water Tank Control Float Switch YXF-A 5m, merk FORT Bersertifikat SNI
- Supply, Delivery, and Installation

Sub TOTAL I.A 78.055.600

B Pekerjaan PLC (Hardware dan Pemrograman)

1 PLC Mitsubishi FX 3G Series 1,00 Ls 140.926.500 140.926.500


PLC CONTROLLER Melsec FX
- PLC FX3G-60MR/DS
Series

- Expansion Board FX2N-48ER-DS PID WTP


Morowali and
- Extension Unit FX3G-CNV-ADP PLC WTP
- Analog FX3U-4AD-ADP Morowali 10
Cable Communication to personal USB CS1W-CN226 CABLE FOR OMRON CS CJ CQM1H & 20 M3/H
-
computer CPM2C Series High Speed
- PLC Software development CX-ONE Industrial Software
- PLC Developer Application
- Panel PLC & Accessories
Sub TOTAL I - B 140.926.500

C Pekerjaan Wiring and Termination

Cable power NYY 3Cx1,5mm2, supply power from Instruments panel to field
1 180,00 m 19.700 3.546.000
instruments
- Instrument installed total 6 unit
6 cables
180 m
- Asump. cable length for instruments at WTP area is @30m
- Supply, Delivery, and Installation

2 Analog signal instrument cables, Belden twisted cables 8760, 18 AWG, 1 pair 180,00 m 20.000 3.600.000
- Transmiting analog signal from field instrument to PLC Input/Output
Number of AI= 6 and AO=0, PID WTP
6 cables
Morowali
180 m
- Asump. cable length for instruments at WTP area is @30m and PLC
- Supply, Delivery, and Installation WTP
Morowali
10 & 20
3 Digital signal instrument cables, 1 PAIR 18AWG BELDEN 1032A 640,00 m 22.500 14.400.000
M3/H
- Transmiting digital signal from field transmitter to PLC Input/Output
Number of DI=32 and DO=46
640 m
asump. cable length from field transmitter to PLC at WTP area is @30m and panel
-
PLC to panel Motor Control is @5m
- Supply, Delivery, and Installation

Cable Tray, Cable Tray 100x50 for instrument from unit to PLC or Instrument panel
4 60 m 141.667 8.500.000
(without cover)
I.Ints & Automation Page 1
Bill of Quantity - URAIAN
PROYEK / PROJECT WTP Morowali
Date issued : 04 juli 2022
LINGKUP / SCOPE of WORK INSTRUMENT & KONTROL OTOMASI Revision : 1

ITEM PEKERJAAN / ITEM of WORKS HARGA


No ( pengadaan & pemasangan / supply & install ) KODE Gbr JUMLAH SATUAN TOTAL ( Rp )
(Rp)
Catatan : Semua keterangan di bawah masing-masing item pekerjaan di BoQ ini adalah penjelasan umum/singkat saja. Keterangan yg lebih lengkap tentang ukuran, material/bahan,
finishing, jumlah, dll., adalah mengacu atau harus dilihat kembali kepada Dokumen Gambar Detail & Dokumen Spesifikasi Teknis & merupakan kesatuan yg tidak terpisahkan
dengan BoQ ini.

I PEKERJAAN INSTRUMENTASI DAN KONTROL


- asump. 60 m (include branch of cable tray)
- Supply, Delivery, and Installation

Sub TOTAL I - C 30.046.000


TOTAL I 249.028.100