Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

6/5/23, 4:39 PM TANGEDCO Online Payment

TAMILNADU GENERATION AND DISTRIBUTION CORPORATION

NAME & ADDRESS OF THE CONSUMER TARIFF S/C No. BILL DATE TOTAL AMOUNT DUE LAST DATE FOR PAYMENT
JAYASEELAN.S
Jayaseelans/O,Susai,Dno,2/2akottapalayam LA1A 062600011778 11/04/2023 ₹90 02/05/2023
HL: Families:

BILLING PERIOD
BOOK NO ACCOUNT NUMBER BILL NUMBER PREVIOUS MONTH AMOUNT DUE PAID ON
BI-MONTHLY/MONTHLY FROM TO

2 12/02/2023 11/04/2023 ₹270 13/02/2023

SECTION ID SECTION NAME CONSUMER INDEX NO CONTRACTED LOAD (KW) POWER FACTOR BILL TYPE

260 AE/O&M/Kottapalayam 2 0 NORMAL

PREVIOUS PRESENT METERED


METER MAX. EXCEEDED ASSESSED ADJ. TOTAL BILLABLE
METER TYPE READING READING MF UNIT
NO DEMAND DEMAND  UNIT UNIT UNIT
KWH / KVAH KWH / KVAH KWH / KVAH
High Quality
920964 9090/0 9230/0 0   -   140   140
Meter

FIXED CHARGES FOR CONTR.LOAD


I. Security Deposit Details
BILL PARTICULARS AMOUNT (₹)
SD AVAILABLE (₹) SD REQUIRED (₹) +DUE / -REFUND (₹) DUE DATE
ENERGY CHARGES 630

FIXED CHARGES FOR CONTR.LOAD 0


II. Advance CC Details
EXCESS DEMAND PENALITY 0
DATE AMOUNT PAID (₹) AMOUNT ADJ (₹) BALANCE (₹)
LPF COMPENSATION (+)

WELDING SURCHARGE 0
III. CC Arrear Details
MONTH & YEAR DUE (₹) BPSC (₹) TOTAL DUE (₹) E TAX 0

        E TAX ON GENSET UNIT


CAUTION: Every bill payment must be done with in due date otherwise according to
the Indian electricity Act 2003 Section 56 (1), without further notice the electricity CURRENT BILL AMOUNT 630
supply will be disconnected on or after the disconnection date shown in this bill.
PROVISIONAL AMOUNT ADJUSTMENT (-) 0

GOVERNMENT SUBSIDY AMOUNT (-) 540

HL FAMILIES SUBSIDY (-)

ROUND OFF 90

NET CURRENT BILL 90

ADVANCE CC(Sec III) 0

BALANCE CC TO BE PAID(Sec IV) 0

ACCD PAYABLE (Sec I)+ACCD REFUND(-)

OTHER CHARGES  

TOTAL AMOUNT PAYABLE 90

https://www.tnebnet.org/awp/billhistory?execution=e2s3 1/1

You might also like