Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

Guangzhou Bacclean Tech Co.

,Ltd
No.3, Shilonggang Road, Dalong Street, Panyu
district,Guangzhou City, Guangdong Province, China
Tel: +86-20-84553900 Mobile: 86-13825165636
URL:www.bacintl.com Email:sales02@bacintl.com

1. Product description:
Panel with PVC cover is based on galvanized/aluminum-zinc plate, and a layer of new
materials with high corrosion resistance, strong acid and alkali resistance, VHP oxidation
resistance and other properties are coated on its surface. It is widely used in
pharmaceutical production workshops, electrolytic aluminum plants, chemical production
workshops, chemical etching, anodizing, integrated circuit board production workshops
and other places that have special requirements for the working environment. This
product can resist the corrosion of various disinfectants and chemicals in harsh
environments, thereby greatly improving the service life of the panel. It is a new type of
energy-saving and environmentally friendly wall composite material.

2. Description of technical parameters:


No. Test items Testing method Parameters
1 Thickness Above 180um
2 Specular gloss 10% ± 5
3 Pencil hardness 3H or more
4 Bending 0T
5 Reverse shock 9J No paint stripping, cracking
6 Cross cut test GB/T 13448 0 grade
7 Cupping test Stroke 8mm without cracking
8 Resistance to neutral salt spray 2000 hours
9 Acid and alkali resistance test 500 hours
10 Solvent Wipe Resistant MEK100 times
11 Resistance to 30% hydrogen peroxide test 240+ hours
12 Foaming Affinity Test Enterprise standard More than 90% adhesion

3. Precautions for use:


3.1 If the product is used in a high temperature environment for a long time, it is prone to
problems such as surface cracking and falling off.
3.2 If the product is exposed to sunlight or ultraviolet light for a long time, it is prone to
surface yellowing and other problems, resulting in performance degradation.
3.3 When this product is used together with other anti-corrosion coatings, it may cause
unpredictable results, and relevant tests must be carried out in advance.

1
INSPECTION CERTIFICATE

You might also like