The first calculate PI from the follwing equation :Qo @ Pwf 1250=1655
PI=𝑸_𝒐/(𝑷𝒆 −𝑷𝒘𝒇 )
drew the IPR curve by default the Pwf then calculate Qo using following equations.
Qo=PI*(Pe-Pwf) if Pwf ≥ Pb
IPR Curve
2500
IPR Curve
2500
2000
Presure, psi
1500
1000
500
0
0 500 1000 1500 2000 2500 3000 3500 4000 4500
( Qo ), bbl/day
equations.
〗 ^𝟐 ]
Horizontal and Multiphase flow calculations
4 inch flowline
q Pth TIP(1.995) TIP(2.375) TIP(2.441) TIP (2.992) TIP(3.476) q
600 146 1055 981 973 944 942 600
1200 217 1405 1230 1211 1124 1113 1201
1800 290 1740 1475 1445 1317 1276 1801
2400 363 2043 1706 1667 1489 1441 2402
3000 436 2212 1928 1878 1652 1587 3002
2500
2000
1500 IPR
Presure, psi
4 inch flowline
4 Flow line TIP 1.995
4 Flow line TIP 2.375
4 Flow line TIP 2.441
1000
4 Flow line TIP 2.992
4 Flow line TIP 3.476
500
0
0 500 1000 1500 2000 2500 3000 3500 4000 4500
( Qo ), bbl/day
6 inch flowline
Pth TIP(1.995) TIP(2.375) TIP(2.441) TIP (2.992) TIP(3.476)
104 972 877 867 823 825
123 1280 1060 1033 914 881
146 1582 1271 1231 1034 968
169 1867 1477 1425 1157 1048
194 2054 1663 1631 1281 1141
2500
2000
IPR 1500
Presure, psi
4 inch flowline
4 Flow line TIP 1.995
4 Flow line TIP 2.375
4 Flow line TIP 2.441
1000
4 Flow line TIP 2.992
4 Flow line TIP 3.476
500
0
4500 0 500 1000 1500 2000 2500 3000 3500 4000 4500
( Qo ), bbl/day
IPR
6 inch flowline
6 Flow line TIP 1.995
6 Flow line TIP 2.375
6 Flow line TIP 2.441
6 Flow line TIP 2.992
6 Flow line TIP 3.476
Kc = 15 md
𝛽= (2.33∗
〖 10 〗 ^10)/𝑘^1.201
𝛽= 901301967.1
rc = ("rp" + (1/2)/12)
rc = 0.062916667
𝑎= 0.05251245
𝑏= (µ∗𝑩𝒐∗ ln(𝑟𝑐/𝑟𝑝))/(7.08∗
〖 10 〗 ^(−3)∗𝑙𝑝∗𝑘𝑝)
b= 29.5286124
𝒒= Q/(N*hp) ∆𝑃per = a q2 + b q ∆𝑃per = Pwfs-Pwf
1 shot / ft 2 shot / ft 4
Total shot
N * hp= 38 ft N * hp 76 ft N * hp
Q pwfs q ∆p pwf q ∆p pwf q
0 2062 0.00 0.00 2062.0 0.0 0.00 2062.0 0
600 1767 15.79 479.33 1287.7 7.9 236.39 1530.6 3.94737
1200 1473 31.58 984.85 488.2 15.8 479.33 993.7 7.89474
1800 1178 47.37 1516.55 -338.5 23.7 728.82 449.2 11.8421
2400 884 63.16 2074.43 -1190.4 31.6 984.85 -100.8 15.7895
2500
2000
1500
Presure, psi
1000
500
0
0 500 1000 1500 2000 2500 3000 3500 4000
( Qo ), bbl/day
shot / ft 6 shot / ft 8 shot / ft 12 shot
152 ft N * hp 228 ft N * hp 304 ft N * hp 456
∆p pwf q ∆p pwf q ∆p pwf q ∆p
0 2062 0.00 0 2062 0.00 0 2062 0.00 0
117.379 1649.62 2.63 78.0705 1688.93 1.97 58.4847 1708.52 1.32 38.9444
236.394 1236.61 5.26 156.868 1316.13 3.95 117.379 1355.62 2.63 78.0705
357.045 820.955 7.89 236.394 941.606 5.92 176.681 1001.32 3.95 117.379
479.333 404.667 10.53 316.646 567.354 7.89 236.394 647.606 5.26 156.868
2500
IPR
4 inch flowline
4 Flow line TIP 1.995
2000
4 Flow line TIP 2.375
4 Flow line TIP 2.441
4 Flow line TIP 2.992
4 Flow line TIP 3.476
Pwf 1 shot /ft 1500
Presure, psi
DP 1 shot /ft
Pwf 2 shot /ft
DP 2 shot /ft
Pwf 4 shot /ft
DP 4 shot /ft 1000
Pwf 6 shot /ft
DP 6 shot /ft
Pwf 8 shot /ft
DP 8 shot /ft
500
Pwf 12 shot /ft
DP 12 shot /ft
Pwf 16 shot /ft
DP
0
00 3500 4000 4500 0 500 1000 1500 2000 2500
( Qo ), bbl/day
/ ft 16 shot / ft
ft N * hp 608 ft
pwf q ∆p pwf
2062 0.00 0 2062
1728.06 0.99 29.1912 1737.81
1394.93 1.97 58.4847 1414.52
1060.62 2.96 87.8805 1090.12
727.132 3.95 117.379 766.621
IPR
6 inch flowline
6 Flow line TIP 1.995
6 Flow line TIP 2.375
6 Flow line TIP 2.441
6 Flow line TIP 2.992
6 Flow line TIP 3.476
Pwf 1 shot /ft
DP 1 shot /ft
Pwf 2 shot /ft
DP 2 shot /ft
Pwf 4 shot /ft
DP 4 shot /ft
Pwf 6 shot /ft
DP 6 shot /ft
Pwf 8 shot /ft
DP 8 shot /ft
Pwf 12 shot /ft
DP 12 shot /ft
Pwf 16 shot /ft
DP
( Qo ), bbl/day
Completion efficiency for cased hole based on flowline size of 4 inch
CE= q cased hole/qopen hole
Tubing inside diameter =1.995 in
Perforation Qo PWF PWS ∆P system CE
open hole 1225 1476 1476 0 1.00
1 710 1110 1736 626 0.58
2 900 1294 1641 347 0.73
4 1050 1350 1575 225 0.86
6 1100 1360 1570 210 0.90
8 1150 1400 1500 100 0.94
12 1200 1410 1480 70 0.98
16 1200 1420 1450 30 0.98
2500
IPR
4 inch flowline
4 Flow line TIP 1.9
2000 4 Flow line TIP 2.3
4 Flow line TIP 2.4
4 Flow line TIP 2.9
4 Flow line TIP 3.4
1500 Pwf 1 shot /ft
Presure, psi
DP 1 shot /ft
Pwf 2 shot /ft
DP 2 shot /ft
Pwf 4 shot /ft
1000
DP 4 shot /ft
Pwf 6 shot /ft
DP 6 shot /ft
Pwf 8 shot /ft
500 DP 8 shot /ft
Pwf 12 shot /ft
DP 12 shot /ft
Pwf 16 shot /ft
0 DP
0 500 1000 1500 2000 2500 3000 3500 4000 4500
( Qo ), bbl/day
1.20
IPR
4 inch flowline 1.00
4 Flow line TIP 1.995
completion effecincy
ize 2.441
Completion efficiency for cased hole based on flowline size of 6 inch
CE= q cased hole/qopen hole
Tubing inside diameter =1.995 in
Perforation Qo PWF PWS ∆P system CE
open hole 1400 1390 1390 0 1.00
1 780 1050 1700 650 0.56
2 1000 1190 1590 400 0.71
4 1150 1250 1500 250 0.82
6 1210 1300 1480 180 0.86
8 1250 1310 1450 140 0.89
12 1300 1320 1410 90 0.93
16 1320 1350 1400 50 0.94
2500
IPR
6 inch flowline
6 Flow line TIP 1.9
2000 6 Flow line TIP 2.3
6 Flow line TIP 2.4
6 Flow line TIP 2.9
6 Flow line TIP 3.4
1500 Pwf 1 shot /ft
Presure, psi
DP 1 shot /ft
Pwf 2 shot /ft
DP 2 shot /ft
Pwf 4 shot /ft
1000
DP 4 shot /ft
Pwf 6 shot /ft
DP 6 shot /ft
Pwf 8 shot /ft
500 DP 8 shot /ft
Pwf 12 shot /ft
DP 12 shot /ft
Pwf 16 shot /ft
0 DP
0 500 1000 1500 2000 2500 3000 3500 4000 4500
( Qo ), bbl/day
IPR
6 inch flowline 1.00
6 Flow line TIP 1.995 0.90
6 Flow line TIP 2.375
6 Flow line TIP 2.441 0.80
completion effecincy
ize 2.441