WEEKLY REPORT

INSPECTION RECORD OF ELETRICAL INSTALLATION

Name of Installation : SENTROVUE B Date :DATE:

MAIN SUBSTATION
Incoming 1 Incoming 1
Incoming 2 Incoming 2
LOCATION / LEVEL : GROUND FLOOR
MSB: B - OW
DESCRIPTION REMARKS

MSB POWER FACTOR


KVA
LV Output (V)
LV Output (A)
CT RATIO
CALIBRATION EXP DATE
VENTALITION FAN
CHANGE OVER SYSTEM
INDUCTION PILOT LAMP
SWITCH BOARD CONDITION
LOCATION / LEVEL : GROUND FLOOR
MSB: B - T1
DESCRIPTION REMARKS

MSB PF
KVA
LV Output (V)
LV Output (A)
CT RATIO
CALIBRATION EXP
VENTALITION FAN
CHANGE OVER SYSTEM
INDUCTION PILOT LAMP
SWITCH BOARD CONDITION
WEEKLY REPORT

INSPECTION RECORD OF ELETRICAL INSTALLATION

Name of Installation : SENTROVUE B Date :

Suruhanjaya Tenaga (Electricity Regulatio 1994),Minimum items to compliance √/X


1.Valid Substation / Generator registration with Suruhanjaya Tenaga / EC is Displayed
2. Competent person registered with EC for the installation
3. Schematic Diagram ( endorsed by PE ) is available
4. MSB / Switch rooms are locked and are only accessed by Competent Personnal
5. Rubber Mat of suitable size and Thickness in front of Switchboard
6. MSB / Switchboard adequatly Lighted , Free of obstruction & not used for Storage
7. DILARANG MASUK , BAHAYA notice is placed outside the switchrooms
8. CPR Board is Available
9. Fire Extuingisher are Available and within expiry dates Date Due:
10. Protection Relay are Callibrated ( every 2 years ) Date Due:
11. Substation/Generator Registration with Suruhanjaya Tenaga Date Due:

REMARK :

Checked by, Acknowledged by:

Chargeman Client Representative

* All originals reports are to be handed to P.I.C of F.M office .Photocopy is to be brought back to HQ for data logging
* All reports are to initialed with official chop/stamp.Reports without chop/Stamp will not be accepted.
MONTHLY TEST RUN LV DIESEL GENERATOR SET

SITE : SENTROVUE B TYPE: DATE:


LOCATION /LEVEL : GROUND KVA:

Generator Condition E.OIL RAD. WTR LEAKS/SPILLS:


HZ RY/VY YB/VB BR/VR RPM AVR BELT.ALT. SYST STAT FUEL(%) HOURS
Generator Test Run
CHECK LIST

FLOAT BOOST BATTERY SPEC BAT.WTR BAT. TERMINALS


VOLT(V) AMPS(A) VOLT(V) AMPS(A) OK TOP UP OK
Generator Battery

OK
Local Power & Lighting
FAULTY:

REMARKS

OIL PRESSURE:

ENGINE TEMP:

BATTERY VOLT:

CHARGEMAN INCHARGE:………………………………………… ASSIST BY:…………………………………………….. VERIFIED BY:………………………………………………….


TT: Termination Tighten RE: Rectified/Repair CI:Cleaned AG:Apply Grease LB:Labeling ER:Earth Resistance
CWT: Control Wire & termination T: Tighten R: Replace B: Boost F: Float