TotalView

Reports 2

Standard Reports

Crew By Hour

The Crew Production Per Hour report provides a view of the amount of loads and tons
per hour, per shift, and per day. The bar graph displayed below the table provides a
graphical representation of this data.

To load the Crew By Hour report, please use the directions listed below.

Directions Images
Step 1: Click the Select Start Date
calendar button to open it, and then
choose the desired start date by clicking
it.

Step 2: Click the View Report button.

1
TotalView
Reports 2

Crew Lineup

The Crew Lineup report is used to display equipment assignments and locations for the
current or oncoming crew.

To load the Crew Lineup report, please use the directions listed below.

Directions Images
Step 1: Click the Select Shift drop-down
menu to open it, choose the desired option
from the list, and then click it.
Step 2: Click the View Report button.

2
TotalView
Reports 2

Crew Production

The Crew Production report displays the load and tonnage per crew as well as per day.
The detailed table shows the production load count and tonnage by origin and material.

3
TotalView
Reports 2

To load the Crew Production report, please use the directions listed below.

Directions Images
Step 1: Click the Select Start Date
calendar button to open it, and then choose
the desired start date by clicking it.

Step 2: Click the Select End Date calendar


button to open it, and then choose the
desired end date by clicking it.

Step 3: Click the Select Shift drop-down


menu to open it, and then click the box
located to the left of the desired shift to
place a check mark in it.
Step 4: Click the Crew drop-down menu to
open it, and then click the box located to
the left of the desired crew to place a check
mark in it.
Step 5: Click the View Report button.

4
TotalView
Reports 2

Crusher By Hour

The Crew Loads Per Hour To Crusher report displays the load and tonnage dumped at the
crusher per hour, per shift, as well as per day.

To load the Crew Loads Per Hour To Crusher report, please use the directions listed
below.

Directions Images
Step 1: Click the Select Start Date
calendar button to open it, and then choose
the desired start date by clicking it.

Step 2: Click the View Report button.

5
TotalView
Reports 2

Dumps By Location

The Dumps By Dump Location report displays the number of dumps and tonnage amount
per dump location per shift per day. The bar graph displays each dump location with the
loads and tonnage per shift per day.

6
TotalView
Reports 2

To load the Dumps By Dump Location report, please use the directions listed below.

Directions Images
Step 1: Click the Select Start Date
calendar button to open it, and then choose
the desired start date by clicking it.

Step 2: Click the Select End Date calendar


button to open it, and then choose the
desired end date by clicking it.

Step 3: Click the Select Shift drop-down


menu to open it, and then click the box
located to the left of the desired shift to
place a check mark in it.

Step 4: Click the View Report button.

7
TotalView
Reports 2

Equipment Down

The Equipment Down Detail report displays a list of trucks in the down status, the
duration of time spent in the down status including the time it went down and the time it
went back up, and the reason code for the down status.

To load the Equipment Down Detail report, please use the directions listed below.

Directions Images
Step 1: Click the Select Start Date
calendar button to open it, and then
choose the desired start date by clicking it.

8
TotalView
Reports 2

Step 2: Click the Select End Date


calendar button to open it, and then
choose the desired end date by clicking it.

Step 3: Click the Select Start Shift drop-


down menu to open it, choose the desired
start shift from the list, and then click it.
Step 4: Click the Select End Shift drop-
down menu to open it, choose the desired
end shift from the list, and then click it.
Step 5: Click the Select EQP Type drop-
down menu to open it, and then click the
box located to the left of the desired
equipment type to place a check mark in
it.
Step 6: Click the Select Fleet drop-down
menu to open it, and then click the box
located to the left of the desired fleet to
place a check mark in it.

Step 7: Click the Select EQP drop-down


menu to open it, and then click the box
located to the left of the desired
equipment to place a check mark in it.

Step 8: Click the View Report button.

9
TotalView
Reports 2

Equipment Down Current

The Current Down Equipment report provides a graphical display of the current down
equipment, and whether or not it was a scheduled or unscheduled down. It provides a
listing of the equipment type, fleet, and number of trucks per fleet. The detailed view
provides a graphical display of the down reason codes per truck and unscheduled and
scheduled downs.

10
TotalView
Reports 2

To load the Current Down Equipment report, please use the directions listed below.

Directions Images
Step 1: Click the Select EQPType drop-
down menu to open it, and then click the
box located to the left of the desired
equipment type to place a check mark in it.
Step 2: Click the Select Down
TimeCategory drop-down menu to open
it, and then click the box located to the left
of the desired down time category to place
a check mark in it.
Step 3: Click the Select Fleet drop-down
menu to open it, and then click the box
located to the left of the desired fleet to
place a check mark in it.

Step 4: Click the View Report button.

11
TotalView
Reports 2

Equipment Status

The Equipment Status Detail report provides the fleet, shift, status reason, and duration of
status including the exact time the status occurs per day. In the total summary section of
the report it includes the number of equipment per fleet.

12
TotalView
Reports 2

To load the Equipment Status Detail report, please use the directions listed below.

Directions Images
Step 1: Click the Select Start Date
calendar button to open it, and then
choose the desired start date by clicking it.

Step 2: Click the Select End Date


calendar button to open it, and then
choose the desired end date by clicking it.

Step 3: Click the Select Start Shift drop-


down menu to open it, choose the desired
start shift from the list, and then click it.

Step 4: Click the Select End Shift drop-


down menu to open it, choose the desired
end shift from the list, and then click it.
Step 5: Click the Select EQP Type drop-
down menu to open it, and then click the
box located to the left of the desired
equipment type to place a check mark in
it.
Step 6: Click the Select Fleet drop-down
menu to open it, and then click the box
located to the left of the desired fleet to
place a check mark in it.

13
TotalView
Reports 2

Step 7: Click the Select EQP drop-down


menu to open it, and then click the box
located to the left of the desired
equipment to place a check mark in it.

Step 8: Click the Select Status drop-down


menu to open it, and then click the box
located to the left of the desired status to
place a check mark in it.

Step 9: Click the View Report button.

Equipment Top Ten States

The Summary section of the Top Ten States report provides the top ten equipment states
for the date range. It includes the description of the state, time, events, and the average
duration for each state. The pie chart displays a graphical representation of this data. The
detail section of the Top Ten States report provides the top ten equipment states per day
within the date range.

14
TotalView
Reports 2

To load the Top Ten States report, please use the directions listed below.

Directions Images
Step 1: Click the Select End Date calendar
button to open it, and then choose the
desired start date by clicking it.

Step 2: Click the Select Start Date drop-


down menu to open it, choose the desired
date from the list, and then click it.

15
TotalView
Reports 2

Step 3: Click the Select EQP Type drop-


down menu to open it, and then click the
box located to the left of the desired
equipment type to place a check mark in it.

Step 4: Click the Select Equipment drop-


down menu to open it, and then click the
box located to the left of the desired
equipment to place a check mark in it.

Step 5: Click the Select Fleet drop-down


menu to open it, and then click the box
located to the left of the desired fleet to
place a check mark in it.

Step 6: Click the View Report button.

16
TotalView
Reports 2

Fuel Detail

The Fuel Detail report provides a per hour view of when each piece of equipment
receives fuel, the amount they get, the exact time of fueling, the duration of time spent
fueling, and the fuel type. The bar graph is a graphical display of the volume of fuel
obtained per shift per fleet.

17
TotalView
Reports 2

To load the Fuel Detail report, please use the directions listed below.

Directions Images
Step 1: Click the Select Date calendar
button to open it, and then choose the
desired start date by clicking it.

Step 2: Click the Select Shift drop-down


menu to open it, and then click the box
located to the left of the desired shift to
place a check mark in it.
Step 3: Click the Select EQPType drop-
down menu to open it, and then click the
box located to the left of the desired
equipment type to place a check mark in it.

Step 4: Click the Select Equipment drop-


down menu to open it, and then click the
box located to the left of the desired
equipment to place a check mark in it.

Step 5: Click the Duration Time Format


drop-down menu to open it, choose the
desired duration time format from the list,
and then click it.
Step 6: Click the View Report button.

18
TotalView
Reports 2

Material Movement

The Material Movement report provides a view of all blast dump source and destination
pairs used during the shift, as well as the total tonnage and load count per pair.

To load the Material Movement report, please use the directions listed below.
19
TotalView
Reports 2

Directions Images
Step 1: Click the Select Start Date
calendar button to open it, and then choose
the desired start date by clicking it.

Step 2: Click the Select End Date calendar


button to open it, and then choose the
desired end date by clicking it.

Step 3: Click the Select Shift drop-down


menu to open it, and then click the box
located to the left of the desired shift to
place a check mark in it.

Step 4: Click the Select Blast drop-down


menu to open it, and then click the box
located to the left of the desired blast to
place a check mark in it.

Step 5: Click the Select Dump drop-down


menu to open it, and then click the box
located to the left of the desired dump to
place a check mark in it.

Step 6: Click the Select Material drop-


down menu to open it, and then click the
box located to the left of the desired
material to place a check mark in it.

Step 7: Click the View Report button.

20
TotalView
Reports 2

Shovel By Hour

The Shovel Loads Per Hour report provides a display of the total tonnage and total trucks
loaded per hour per shift. The bar graph is a graphical representation of this data.

21
TotalView
Reports 2

To load the Shovel Loads Per Hour report, please use the directions listed below.

Directions Images
Step 1: Click the Select Start Date
calendar button to open it, and then choose
the desired start date by clicking it.

Step 2: Click the Select Shift drop-down


menu to open it, and then click the box
located to the left of the desired shift to
place a check mark in it.

Step 3: Click the Fleet drop-down menu to


open it, and then click the box located to
the left of the desired fleet to place a check
mark in it.

Step 4: Click the View Report button.

22
TotalView
Reports 2

Shovel Shift

The Shovel Shift Summary report provides a per day per shovel view including duration
of time the shovel is in ready status, the tons per operating hour, the trucks loaded and
tonnage received, and the average tonnage per load.

To load the Shovel Shift Summary report, please use the directions listed below.

Directions Images
Step 1: Click the Select Start Date
calendar button to open it, and then choose
the desired start date by clicking it.

Step 2: Click the Select Shift drop-down


menu to open it, choose the desired shift
from the list, and then click it.

23
TotalView
Reports 2

Step 3: Click the Fleet drop-down menu to


open it, and then click the box located to
the left of the desired fleet to place a check
mark in it.

Step 4: Click the Select Time Format


drop-down menu to open it, choose the
desired time format from the list, and then
click it.
Step 5: Click the View Report button.

24
TotalView
Reports 2

Truck Cycles

The Trucks Cycles report provides a view of the total and average time spent in each
status of the haul cycle.

25
TotalView
Reports 2

To load the Truck Cycles report, please use the directions listed below.

Directions Images
Step 1: Click the Select Start Date
calendar button to open it, and then choose
the desired start date by clicking it.

Step 2: Click the Select End Date calendar


button to open it, and then choose the
desired start date by clicking it.

Step 3: Click the Select Shift drop-down


menu to open it, and then click the box
located to the left of the desired shift to
place a check mark in it.

Step 4: Click the Select Fleet drop-down


menu to open it, and then click the box
located to the left of the desired fleet to
place a check mark in it.

Step 5: Click the Select Truck drop-down


menu to open it, and then click the box
located to the left of the desired truck to
place a check mark in it.

Step 6: Click the Select Time Format


drop-down menu to open it, choose the
desired time format from the list, and then
click it.
Step 7: Click the View Report button.

26
TotalView
Reports 2

Truck Haulage

The Truck Haulage report provides a per day view of the fleet and truck haulage.
Including the number of shifts the truck was used, the total loads, the loads per shift, the
total tonnage, and tonnage per shift. The bar graph displays the loads and tonnage for
each truck for each fleet.

27
TotalView
Reports 2

To load the Truck Haulage report, please use the directions listed below.

Directions Images
Step 1: Click the Select Start Date
calendar button to open it, and then choose
the desired start date by clicking it.

Step 2: Click the Select End Date calendar


button to open it, and then choose the
desired start date by clicking it.

Step 3: Click the Select Shift drop-down


menu to open it, and then click the box
located to the left of the desired shift to
place a check mark in it.

Step 4: Click the Fleet drop-down menu to


open it, and then click the box located to
the left of the desired fleet to place a check
mark in it.

Step 5: Click the View Report button.

28
TotalView
Reports 2

Trucks At Shovel

The Trucks Waiting At Shovel report provides a graphical display of the trucks waiting at
a particular shovel during a shift.

29
TotalView
Reports 2

To load the Trucks Waiting At Shovel report, please use the directions listed below.

Directions Images
Step 1: Click the Select Start Date
calendar button to open it, and then choose
the desired start date by clicking it.

Step 2: Click the Select Shift drop-down


menu to open it, choose the desired shift
from the list, and then click it.
Step 3: Click the Select Fleet drop-down
menu to open it, choose the desired fleet
from the list, and then click it.

Step 4: Click the View Report button.

30

You might also like