Professional Documents
Culture Documents
Pantera1100 o 3
Pantera1100 o 3
Pantera1100 o 3
training CONTROLS
Engine service
tool connector Roof
panel
Drilling
joystick
Flushing
pedal
Angle
Thread indicator
Rod handling greasing (TIM)
control pedal
Tramming Boom control
control
Right hand
panel
S46
S23
H42 Suction off
Percussion--feed Suction on
follow--up on
Forced flushing
Dust collector on
if S18 is ON
T/T/Pan1100/O/3 OPERATION INSTRUCTIONS
Blow--down automatics,
S18
S31 if dust collector (S46) is
Close on, max. flushing
centralizer Blow--down
automatics off
and flushing off
Open Blow--down automatics,
centralizer if dust collector (S46) is
on, adjustable flushing
S17
S24 H17 Flushing control
Antijamming
automatics on
automatics on
(rotation pressure)
Flushing control
Antijamming
automatics off
automatics off
fast feed
fast feed
T/T/Pan1100/O/3 OPERATION INSTRUCTIONS
Pito Pito
open close
Upper
Upper
jaw
jaw
open
close
Rollers Rollers
open close
Threading close
Cassette
rotation Roller rotation
Rod out of Rollers down
the jaws
Rod to
Rod to drilling
cassette centre
Cassette
Roller rotation rotation
Rollers up Rod to
the jaws
Threading open
T/T/Pan1100/O/3 OPERATION INSTRUCTIONS
Control current on
Stop Start
Ignition key S2
S2
Emergency stop
S3
S3
S5
S103 S7
H103
S5 S103
S7
Signal horn Control Fast tramming
Starting aid
(optional) Override
Tramming with
remote control
(indicator light)
T/T/Pan1100/O/3 OPERATION INSTRUCTIONS
H27
S26
Oscillation forwards,
cabin tilts forwards
Oscillation backwards,
cabin tilts backwards
S35 S15
S104
H23
Front ground Rear jack Close noise
jack up up; killer
light off
Boom down
Boom to Boom to
the left the right
Boom up
Lower end of feed forwards
Zoom in
T/T/Pan1100/O/3 OPERATION INSTRUCTIONS
Control display
H5 H4 H3 H2 H1
Hydraulic oil Compressor Compressor Engine error Emergency stop
return filter oil separator temperature warning light indicator light
indicator light indicator light indicator light
T/T/Pan1100/O/3 OPERATION INSTRUCTIONS
Engine inlet
air temperature Charging
Engine cooling Fuel Temperature
water temperature temperature (extra)
Fuel
pressure
Control display
Windscreen wiper scrolling
intermittent Scroll backwards Scroll forwards
PS8 S94
Spotlight for
pressure
Windscreen gauges
washer Stabilizer
pressure filter
indicator light
Indicator
light
testing
S92
The engine idle revolution speed is 1200 rpm.
It can be adjusted between 1200 ---- 2120 rpm
with the hand lever (when percussion or flushing
is NOT on).
If percussion or flushing is used the revolution
speed will be automatically adjusted to 2120.
Control display
scrolling
Error codes:
02 Error in storing information
12 Cooling water level sensor is faulty
13 No connection to fuel temperature sensor
21 Incorrect sensor supply voltage
24 No connection to oil pressure sensor
25 No connection to boost temperature sensor
26 No connection to air pressure sensor
27 No connection to cooling water temperature sensor
32 Incorrect hand throttle signal
33 Check hand throttle calibration
34 Missing revolution speed signal
35 Too high revolution speed
38 No connection to intake air temperature sensor
42 Check timing sensor calibration
46 Low oil pressure
51 Low / breaking ECM operating voltage
53 Faulty ECM
61 High cooling water temperature
62 Low cooling water level
64 High intake air temperature
65 High fuel temperature
72 Cylinder 1 and/or 2 faulty
73 Cylinder 3 and/or 4 faulty
74 Cylinder 5 and/or 6 faulty
T/T/Pan1100/O/3 OPERATION INSTRUCTIONS
Both unlocked
Left Right
locked locked
Winch control
Oscillation locking
S620
S613
S605
S604
S611 S601/H601
Emergency stop
Oscillation control Power on/off
Tramming control
T/T/Pan1100/O/3 OPERATION INSTRUCTIONS
Oscillation forwards
Depress
button
Forward
Right Left
forward forward
Right forward Left forward
Left reverse Right reverse
Left Right
Depress reverse reverse
button
Reverse
T/T/Pan1100/O/3 OPERATION INSTRUCTIONS
Fan switch
Heater operating
switch
Air supply
selector switch
Air filters
(2 pcs)
Main fuses
Main switch
Fuses
T/T/Pan1100/O/3 OPERATION INSTRUCTIONS
Main switch
J2/P2 J1/P1
4
1
1
Check transfer gear oil. Dipstick
(1).
1 2
T/T/Pan1100/O/3 OPERATION INSTRUCTIONS
B A C
15...35 mm
Check track tension. The track is
correctly adjusted when the upper
stretch slack is 15--35 mm.
xx
xx
xx
xx
xx
xx
xx
xx
T/T/Pan1100/O/3 OPERATION INSTRUCTIONS
S13 S14
Tramming position
Max. 20˚
Max. 20˚
3m
Danger area
Drive shaft
Cover
Screw
Sun wheel
splines
Cover
Screws
Screws
Cover
Cover Screws
T/T/Pan1100/O/3 OPERATION INSTRUCTIONS
PERCUSSION
FEED
ROTATION
FLUSHING
T/T/Pan1100/O/3 OPERATION INSTRUCTIONS
Air
Rock
drill
Oil Collecting
piece
Water
Air separator
Pressure valve
switch
Air
H93 Oil
Shank lubrication
working indicator light
Tank Pressure
Shank lubrication
disturbance
indicator light
Hydraulic oil Pump
H94 tank line operating
pressure
T/T/Pan1100/O/3 OPERATION INSTRUCTIONS
Percussion--feed S46
S23 follow--up off =
H42 max. percussion, Suction off
indicator light goes on
Percussion--feed Suction on
follow--up on
Forced flushing
Dust collector on
if S18 is ON
Blow--down automatics,
S18
if dust collector (S46) is
on, max. flushing
Blow--down
automatics off
and flushing off
Blow--down automatics,
if dust collector (S46) is
on, adjustable flushing
Rotation Feed
Percussion
Flushing
1. When the extension sleeve comes 4. If the thread is not yet open, hammer
close to the Pito jaws, open them suffi- the rod against the hole bottom by mov-
ciently to make room for the sleeve. ing the drilling joystick to the right while
2. Decrease feed when the lower edge of pressing button 2 (S22) until the thread
the sleeve is at the upper edge of Pito. opens.
3. When the sleeve is between the jaws,
stop drilling.
5. Close the Pito jaws. 6. Thread the shank out of the sleeve.
7. Run the rock drill to the rear position 8. Pump grease to the greasing brush
with fast feed; pull the joystick backwards (when the rod is moved to the drilling
and press the button 1 (S21). centre, the brush applies grease to the
threads).
1
T/T/Pan1100/O/3 OPERATION INSTRUCTIONS
9. Move the rod to the drilling centre. 10. Open the upper jaw slightly.
12. Thread the rod down with rollers. 13. Thread the shank into the rod.
14. Open the upper jaw. 16. Turn the upper jaw and the roller to
15. Open the rollers. the cassette.
17. Run the roller up. 18. Move a new rod to the jaws.
T/T/Pan1100/O/3 OPERATION INSTRUCTIONS
The upper jaw and the roller must be closed during fast feed and drilling.
If the jaws are not closed, the rock drill will collide with the jaws.
21. Open the Pito jaws. 23. Close the Pito jaws when the rod ex-
22. Continue drilling. tension sleeve has passed the jaws.
T/T/Pan1100/O/3 OPERATION INSTRUCTIONS
5. Retract the rod string until the sleeve of 7. Turn the upper jaw and the roller into
the first joint is at the Pito jaws. the drilling centre.
6. Close the Pito jaws.
5. Retract the rod string until the sleeve of 7. Turn the upper jaw and the roller into
the first joint is at the Pito jaws. the drilling centre.
6. Close the Pito jaws.
11. Open the upper jaw slightly. 12. Thread the rod open.
13. Move the rod into the cassette. 14. Open the roller.
The upper jaw and the roller must be closed during fast feed and drilling.
If the jaws are not closed, the rock drill will collide with the jaws.
T/T/Pan1100/O/3 OPERATION INSTRUCTIONS
18. Run the rock drill downwards with fast 19. Thread the shank into the sleeve.
feed by pushing the drilling joystick for-
wards and pressing the button 1 (S21).
20. Open the Pito jaws. 21. Dismantle the whole rod string as
described above.
22. To make sure that the lower threads
do not open when the rod string is pulled
up, you can push the drilling joystick to
the right (rotating position). At the same
time, turn percussion off by pressing the
button 3 (S19).
23. Avoid pulling the drill bit through the 24. Lift the feed cautiously to avoid cav-
suction head as this might damage the ing--in of the hole.
rubber sealings.
T/T/Pan1100/O/3 OPERATION INSTRUCTIONS
Pin
Pin
T/T/Pan1100/O/3 OPERATION INSTRUCTIONS
Max. 20˚
_C F
30 86
20 68
10 50
0 32
max 90%
T/T/Pan1100/O/3 OPERATION INSTRUCTIONS
INCORRECT CORRECT
T/T/Pan1100/O/3 OPERATION INSTRUCTIONS
Rotation Rotation
Flushing Feed
Flushing Feed
Sticky layer
in rock
Rotation Rotation
Flushing Feed
Flushing Feed