Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

I ------

_.,�� I �ARCADISi���<=,
WORK INSPECTION REQUEST
4 _.FiBR.EX Constn.icl.X';,n. O�•;> .oln� 1 9?2"

Project: North Vas - Vas Living (NOYA) Date: 4-Jul-23


Client: Aldar Properties PJSC IR Ref. No.: NY2.NV-BW-FIB-ZZ-ZZ-XX-WI-A R-05056
Contractor: Fibrex LLC Rev.: 0
Consultant: ARCADIS
"
._-. . •. ,. '"''; . '· ., · , '•·• ·· ;_.•.SECTION A - DETAILS OF IN�PECTION ·•
>· ,..· . . •, .
·
'., ,.

Work Package .•· . Discipline


Building B Civil / Structural LJ Mechanical OTHERS (Specify) �
Infrastructure □ Architectural B Electrical �
Public Realm □ Interior Design Natural Gas □ 0
Early Works □
Land Scaping / Hardscape Oelecommunication / IT 0
Description of work to be inspected: (Attached high-lighted copy of relevant drawing)
Inspection of installation Aluminum frame & glass (Sliding Doors,Windows,Fixed Windows & Top Hung Windows In 4BR villa no.
96,97,98,99,100,101,102 & 103 Ground floor and first floor zone 04. As per attached & highlight layout drawings.
Location: as per the attached drawing I
Relevant Drawing/ Specs: NY2.NV-BW-FI B-VP-V4B-ZZ-PL-FC-1600-R0
MSRA Ref: NY2.NV-ll.-FIB-ll.-ll.-ll.-MS-AR-00008-R0
Inspection Date: 5-Jul-23 Inspection Time: 10.00 AM
Submitted by: Fibrex LLC Date: Time:
Received by: Artadis Date: Time:
Associated Discipline Inspection & Approval (Contractor)
Inspection Comment ' .. Sigpiature Date /Time
Civil & Survev A� 4-Jul-23
Mechnical �
Electrical
. 9�hers (6�umin_u_m)_
,.., '.
SECTION 8 ° CONFORMATION OF CONTRACTOR'S QA/QC INSPECTION
. ,.
�[ ,,.. ..

Confirmation of coordination & compliance with Specifications, approved drawings, Method Statement & Quality Control plan
Yes Q No □
Note: If 'NO', any departure from the specification, approved drawings, Method statement and Quality
Control plan to be recorded below
Non Conformity and/or reference to atta onformity Report (NCR)# Date:
�/
Signed by Contrator QA/QC Engineer:
o:.· - -� .
-.-
. SECTION Cc ENGINEER'S.INSPECTIOl'4 / COMMENTS: .•' ,., · :'
-
4-Jul-23
.

Position Commnets Signature Date /Time

Inspector

Surveyor

Material Engineer

Resident Engineer

Accepted □ Accepted as noted □ Not Acceptable □ Photo Attached □


Consultant Signature: Date Time:

Received By Contractor: Date Time:


Copy with Section A completed by Contractor to be submitted to Consultant by 16.00 hrs the day before planned timem of inspection
Original With Section B completed to be handed to Consultant prior to inspection
Engineer to comp lete Section C & return to Contractor

Checking & Approval by the Engineer shall not relieve the Contractor from his obligationto perform the work in accordance with the Copntract Documents, Requirement of
Safety & local Authority regualtiok