Office of the AGM (Generation)
Generation Headquarters
Ceylon Electricity Board
New Kelani Bridge Road
Kolonnawa 10600.
Date: 2023-07-10
My Ref: GHQ/AGM/TECH/DPC/09
All DGMM in Generation Division
PPM (LVPP)
AFM (Gen.)
Instructions for DPC (Generation) Submissions
Please instruct relevant executives in your branches to adopt the following procedures when making
submissions to DPC (Generation),
1. Submissions to DPC (Generation) ~ Should contain the completed Check List as Annexure I
(copy of the Check List is attached),
2. (i) Submission below LKR 200 Million - Submit Original document with 03 copies
(ii) Submission above LKR 200 Million- Submit Original document with 04 copies.
3. Convener of the TEC or his nominated representative should be available on Standby during
the DPC meeting [scheduled date and time of the DPC meeting will be informed by the
Secretary (DPC)], in order to facilitate the approval process.
Eng. D.N. Navaratne
Additional General Manager (Generation)
p,-Navartne
‘Agia (Geaereion
ce, Secretary, DPC (Generation)
Tel (#04 11) 2434197, 2147201 Fax. (+04 11) 2045286, e-Mail: agmgen@ceb ik Page |CHECK LIST FOR DPC (GENERATION) SUBMISSIONS
Annex. NIA (ifnot
applicable
reasons)
01) Copy of the Principle Approval Letter L
02) Copy of the TEC Appointment Letter
(i) Estimated Cost with VAT
(ii) Procurement Methodology (ICB/NCB/LICB/LNCB/OEM)
Fund availability and Cost Code (Duly filled Fixed Assets
Form should be attached)
03) Copy of the Letter of Invitation for Bids (or Paper Advertisement)
04) Approval Letter of AGM for FAT/ Trai
NUL
J
05) Bid & Bid Bond Validit
06)
id Opening Data Sheet
07) Procurement related cost (Foreign)
(i) Procurement Cost
(i) FOB
ii) Freight
(iv) Insurance if applicable
(v) Clearing by Indents/ Supplier
(vi) Total Cost under consideration {
|
[
08) Procurement related cost (Local)
(Procurement Cost
i) VAT
ii) Other GOSL Taxes
(iv) Total Cost
09) Conformity with the Financial Limits of the Procurement
Committee
10) Schedule of Ranking without VAT [
11) Total Cost including VAT [
12) Type of Procurement (Local/ Foreign) [ [
13) Payment Methodology — LC(80-85% & 15 - 20% TT/ DP
(Guarantee requirement
(ii) Freight Mode (Sea/Air/Courier)
14) TEC Submission & all Schedules signed by all Members
15) Any arithmetical errors detected in which case how corrected, If
any discounts given
16) Original Quotation & other supporting documents ]
Signed by: Chairman, TEC... - 1. Member 1
2. Member 2