No Material
VOLUME SATUAN HARGA SATUAN JUMLAH
A Material Instalasi
1 MCB Satu pole 10 A + BOX SNI 1 buah 49,500 49,500
2 Kabel NYM 3 x 4 mm2 SNI 1 meter 24,475 24,475
3 Kabel NYM 3 x 2,5 mm2 SNI 10 meter 17,820 178,200
4 Kabel NYM 3 x 1,5 mm2 SNI 10 meter 12,375 123,750
5 Kotak Kontak 16 A Outbow SNI 1 buah 44,000 44,000
6 Saklar Tunggal Outbow SNI 1 buah 27,500 27,500
7 Saklar Ganda Outbow SNI 1 buah 38,500 38,500
8 Fitting Plafon SNI 3 buah 22,000 66,000
9 Earthing Rod/Grounding 25 mm2 SNI 1 set 165,000 165,000
10 Lampu LED 10W SNI 3 buah 27,500 82,500
11 Material Bantu (tDos, roset, klem, paku dan isolasi) SNI 1 lot 16,500 16,500
12 Pipa SNI 1 set 16,500 16,500
13 Stiker SNI 1 buah 3,000 3,000
SUB JUMLAH A 835,425
B Jasa Pasang Instalasi 1 ls 250,000 250,000
SUB JUMLAH B 250,000
C Biaya SLO (TIDAK DIKOMPETISIKAN) 1 buah 60,000 60,000
SUB JUMLAH C 60,000
JUMLAH SEBELUM PAJAK (A+B+C) 1,145,425
PEMBULATAN 1,145,000
PPN 11% 125,997
JUMLAH SETELAH PAJAK 1,271,422
PERHITUNGAN TINGKAT KOMPONEN DALAM NEGERI (TKDN)
PERUSAHAAN : PT. BINTANG LOMBOK UTAMA
KEGIATAN :
PEKERJAAN :
LOKASI :
THN. ANGGARAN : 2023
12 Pipa 1/2 inch Indonesia 100% 1.00 set 16,500.00 16,500.00 0.00% 16,500.00 100%
13 Stiker Indonesia 100% 1.00 buah 3,000.00 3,000.00 0.00% 3,000.00 100%
A. SUB TOTAL BARAN ( A ) 835,425.00 0.00% 835,425.00
J A S A.
Jasa Pasang Instalasi 100% 250,000.00 250,000.00 0.00% 250,000.00
Biaya SLO (TIDAK DIKOMPETISIKAN) 100% 60,000.00 60,000.00 0.00% 60,000.00
B. SUB TOTAL JASA ( B ). 310,000.00 0.00% 310,000.00
% TKDN (Gabungan Barang dan Jasa) Nilai Barang Total - Nilai Barang Luar Negeri
= ------------------------------------------------------------------------------------------------------- +
Nilai Gabungan Barang dan Jasa
310,000.00 - 0.00
----------------------------------------------------------------------------------------
1,145,425.00
= 100%