Load Classification Connected Load Demand Factor Estimated Demand Panel Totals
HVAC 15900 VA 90.00% 14310 VA
Receptacle 4680 VA 70.00% 3276 VA Total Conn. Load: 35336 VA
Lighting 1243 VA 90.00% 1118 VA Total Est. Demand: 29486 VA
Water Heater 4625 VA 50.00% 2313 VA Total Est. Demand + 20% Spare: 35383 VA
Refrigeration 1000 VA 50.00% 500 VA Total Current: 51 A
Light Current Equipment 4180 VA 100.00% 4180 VA
Industrial Plug 3000 VA 100.00% 3000 VA
Media Converter 1500 VA 100.00% 1500 VA
Notes:
* Circuit protected with RCBO 30mA ** Circuit protected with RCBO 100mA
REFERENCE DRAWINGS
DRAWING TITLE DRAWING NO.
TED
ED
ED
ED
D
7 20 FACP** 4 mm² 4 mm² 20 A 1 500 VA 500 VA 1 20 A 4 mm² 4 mm² WORK STATION (1)* 20 8
WN
IEW
CKE
ROV
REV.NO. DATE ISSUED FOR
IGN
MIT
DRA
REV
CHE
9 20 WORK STATION (2)* 4 mm² 4 mm² 20 A 1 500 VA 0 VA 1 20 A -- -- Spare -- 10
DES
SUB
APP
11 20 WORK STATION (2)* 4 mm² 4 mm² 20 A 1 500 VA 0 VA 1 32 A -- -- Spare -- 12
TOTAL VA PER PH R/Y/B: 1680 VA 2000 VA 2000 VA DRAWING
STATUS ISSUED FOR TENDER PACKAGE
TOTAL AMP PER PH R/Y/B: 7A 9A 9A
Load Classification Connected Load Demand Factor Estimated Demand Panel Totals CLIENT
Light Current Equipment 4180 VA 100.00% 4180 VA
Media Converter 1500 VA 100.00% 1500 VA Total Conn. Load: 5680 VA
Total Est. Demand: 5680 VA
Total Est. Demand + 20% Spare: 6816 VA
Total Current: 10 A
Notes:
* Circuit protected with RCBO 30mA ** Circuit protected with RCBO 100mA