DPR-1 July
DPR-1 July
(Construction Work )
WO Reference
Owner M/s Oil India Ltd
Consultant M/S JPEC
Contractor M/s BRC Pvt Ltd
ACTIVITY ACTIVITY END UNIT of TOTAL SCOPE OF WORK( As
SL NO DESCRIPTION START DATE DATE qty per topographical survey ) PREV. WORKDONE TODAY WORKDONE NEXTDAY PLAN CUMM. WORKDONE BALANCE WORK
Earth filling, levelling and compaction by JCB, Poclain, Dumper, Road cubic
roller etc. 15/04/2021 on process 61100.00 100% 22239.00 36.40% 109.00 0.18% 0.00 0.00% 0.00 0.00% 109.00 0.18% 22239.00 36.40% 38861.00 63.60%
metre
REMARKS
Month week
W2
W3
W4
MAY '21
W1
W2
W3
W4
JUNE '21
W1
W2
W3
W4
JULY '21
W1
W2
W3
W4
AUG '21
W1
W2
W3
W4
SEP '21
W1
W2
W3
W4
OCT '21
W1
W2
W3
W4
NOV '21
W1
W2
W3
W4
B Activity- CONCRETE
3 DIVERSION OF NULLAH
DULED) CONSTRUCTION AND COMMISIONING (ACTUAL)
days
3055
764
per day 109
764
per day 109
764
per day 109
764
per day 109
3055
764
per day 109
764
per day 109
764
per day 109
764
per day 109
3055
764
per day 109
764
per day 109
764
per day 109
764
per day 109
6110
1527
per day 218
1527
per day 218
1527
per day 218
1527
per day 218
10692
2673
per day 382
2673
per day 382
2673
per day 382
2673
per day 382
12220
3055
per day 436
3055
per day 436
3055
per day 436
3055
per day 436
7638
1909
per day 273
1909
per day 273
1909
per day 273
1909
per day 273
MMISIONING (ACTUAL)
Cumm. Balance
Completed
22239.00 38861.00
Project Name: Land Redevelopment Works at Baghjan, Assam of M/s Oil India Ltd.
ESurveying
antity Report
Filling Volume
Average Volume Area Previous Average Volume
Sq. Meters Cubic Meters Sq. Meters Area Sq. Meters Cubic Meters
0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.544 0.000 0.272 0.137
0.000 0.000 28.477 0.544 14.511 145.107
0.000 0.000 98.341 28.477 63.409 634.089
0.000 0.000 135.149 98.341 116.745 1167.447
0.000 0.000 137.889 135.149 136.519 1365.187
0.000 0.000 148.676 137.889 143.282 1432.824
0.000 0.000 153.621 148.676 151.149 1511.487
0.000 0.000 162.476 153.621 158.049 1580.489
0.000 0.000 147.227 162.476 154.852 1548.515
0.000 0.000 141.333 147.227 144.280 1442.798
0.000 0.000 143.264 141.333 142.299 1422.986
0.000 0.000 99.647 143.264 121.456 1214.556
0.000 0.000 80.421 99.647 90.034 900.338
0.000 0.000 79.721 80.421 80.071 800.709
0.000 0.000 78.250 79.721 78.985 789.854
0.000 0.000 79.197 78.250 78.724 787.236
0.000 0.000 93.456 79.197 86.327 863.269
0.000 0.000 102.611 93.456 98.034 980.337
0.000 0.000 124.537 102.611 113.574 1135.741
0.000 0.000 153.270 124.537 138.904 1389.037
0.000 0.000 203.064 153.270 178.167 1781.672
0.000 0.000 231.528 203.064 217.296 2172.961
0.000 0.000 224.959 231.528 228.244 2282.437
0.000 0.000 233.107 224.959 229.033 2290.332
0.000 0.000 251.539 233.107 242.323 2423.230
0.000 0.000 229.478 251.539 240.508 2405.084
0.000 0.000 201.359 229.478 215.418 2154.183
0.000 0.000 214.644 201.359 208.001 2080.015
0.000 0.000 207.907 214.644 211.275 2112.754
0.000 0.000 202.565 207.907 205.236 2052.359
0.000 0.000 213.384 202.565 207.975 2079.746
0.000 0.000 215.141 213.384 214.262 2142.623
0.239 2.385 248.523 215.141 231.832 2318.319
0.272 2.720 200.393 248.523 224.458 2244.580
1.020 10.200 166.635 200.393 183.514 1835.138
3.795 37.952 127.486 166.635 147.060 1470.604
5.491 54.906 103.268 127.486 115.377 1153.768
3.244 32.437 125.320 103.268 114.294 1142.940
0.562 5.618 119.568 125.320 122.444 1224.442
0.000 0.000 78.946 119.568 99.257 992.573
0.000 0.000 74.854 78.946 76.900 769.000
0.000 0.000 37.152 74.854 56.003 560.027
0.000 0.000 11.368 37.152 24.260 242.600
0.000 0.000 0.239 11.368 5.804 58.038
146.218 61101.568
DAILY PROGRESS REPORT
(Manpower & Machinery Deployed)
Project Name:
WO Reference
Owner M/s OIL india Ltd.
Consultant Ms/ JPEC
Contractor M/s BRC Pvt Ltd.
Quantity
Received Received Till Cummulative
Sl No Material description UOM Remarks
Consumed today Prev.day Received ( E )
Scope (A) Available (B =E-C)
(C)
WO Reference
Owner M/s OIL india Ltd.
Consultant M/s JPEC
Contractor M/s BRC Pvt Ltd.
1 16.05.21 to 19.05.21
2 20.05.21
21.05.21 to
3 22.05.21
5 27.05.21
5 29.05.21
6 31.05.21
7 01.06.21 to 07.06.21
8 08.06.21 to 11.06.21
9 15.06.21
10 16.06.21
11 18.06.21
12 25.06.21 to 28.06.2021
CHRONOLOGICAL ACHIEVEMENTS
(Dismantling & Construction Works)
HAL Offshore Limited Richard Design Services India PVT. LTD Oil India Limited
LSTK Contractor OIL Engineering & Project Management Consultant Owner
Date 1-Jul-21
Weather conditions Rainy
Project Name: Engineering, Procurement, Construction, Testing and Commissioning of Central Bowser Station(CBUS),Duliajan, Assam Oil India Limited .
WO Reference 6208819
Owner M/s OIL INDIA LTD
Consultant Richard Design Services India PVT. LTD
Contractor HAL Offshore Limited
3 Dismantling of dead pipe (Out side CBUS) 08/05/2019 MTR 650 650.000 0.000 08/09/2019
4 Dismantling of Existing Pipes (Inside New CBUS) 08/09/2019 Mtrs 3049.0 3049.0 0.000 17/08/2019
7 Dismantling of MS Tank -2 No Inside new CBUS 22/08/2019 MTR 83.40 83.400 0.000 27/08/2019
(PIPE )
8 Dismantling of dead Pipes (Inside OCS-3) 08/06/2019 MTR 2932 2932 0.000 03/09/2019
10 Dismantling of Existing structural Inside OCS-3 17/08/2019 Mtrs 637 637.000 0.000 18/08/2019
11 Dismantling of separating wall and walk way 13/08/2019 CUM 30.00 30.000 0.000 22/08/2019
inside CBUS
12 Dismantling of existing Boundary Wall 08/07/2019 CUM 4.00 4.000 0.000 08/08/2019
14 Dismantling of walk way inside NEW CBUS 13/08/2019 CUM 9 9.000 0.000 22/08/2019
15 Dismaltling Existing VESSEL Shed in OCS-3 14/08/2019 Mtrs 162 162.000 0.000 27/08/2019
16 Temporary Area Barrication inside OCS-3 05.09.19 RMTR 137.0 137.000 0.0 17/10/2019