STANDARD PRELIMINARIES
A GENERAL
3 CONDITIONS OF CONTRACT
6 SINGAPORE CURRENCY
13 METRIC COMPONENTS
B CONTRACT REQUIREMENTS
C/F
PP/1
PROPOSED DEVELOPMENT OF A NURSING HOME AT HOUGANG AVENUE 3, SINGAPORE
B/F
21 PROVISIONAL QUANTITIES
23 OVERPAYMENT
24 IRREGULARITY COMMITTED
25 ATTENDANCE
28 CONSTRUCTION PROGRAMME
C/F
PP/2
PROPOSED DEVELOPMENT OF A NURSING HOME AT HOUGANG AVENUE 3, SINGAPORE
B/F
30 PROGRESS REPORTS
31 SUBSTITUTION OF MATERIALS
38 RESPONSIBILITIES OF CONTRACTOR
C/F
PP/3
PROPOSED DEVELOPMENT OF A NURSING HOME AT HOUGANG AVENUE 3, SINGAPORE
B/F
50 PROVISION OF TRANSPORT
55 BURNING ON SITE
56 PRESERVATION OF TREES
57 CLEARING OF SITE
59 WASH BAYS
C/F
PP/4
PROPOSED DEVELOPMENT OF A NURSING HOME AT HOUGANG AVENUE 3, SINGAPORE
B/F
63 SITE SECURTIY
64 PROJECT SIGNBOARD
68 MATERIALS
C/F
PP/5
PROPOSED DEVELOPMENT OF A NURSING HOME AT HOUGANG AVENUE 3, SINGAPORE
B/F
79 DRAINING OF SITE
80 HOUSEKEEPING
C/F
PP/6
PROPOSED DEVELOPMENT OF A NURSING HOME AT HOUGANG AVENUE 3, SINGAPORE
B/F
88 HOARDING
D WORKS REQUIREMENTS
91 PHOTOGRAPHS
C/F
PP/7
PROPOSED DEVELOPMENT OF A NURSING HOME AT HOUGANG AVENUE 3, SINGAPORE
B/F
96 CLEANING UP PERIODICALLY
98 VENTILATION
99 TREASURE TROVE
100.1 General
C/F
PP/8
PROPOSED DEVELOPMENT OF A NURSING HOME AT HOUGANG AVENUE 3, SINGAPORE
B/F
C/F
PP/9
PROPOSED DEVELOPMENT OF A NURSING HOME AT HOUGANG AVENUE 3, SINGAPORE
B/F
115 SAMPLES
PP/10
PROPOSED DEVELOPMENT OF A NURSING HOME AT HOUGANG AVENUE 3, SINGAPORE
NOTES
All quantities shown are provisional and subject
to final measurement upon completion based on
the rates entered herein.
The pay length for piles shall be measured from
the toe level to the cut-off level of the piles
B BLIND BORING
1 Blind boring from existing ground levels to cut-
off levels of the cast in-situ bored piles including
backfilling with earth after completion in blind
bore piles to existing ground level.
Carried Forward
E PILE TEST
Carried Forward
Brought Forward
$..........................
F PILE INSTRUMENTATION
A SITE CLEARANCE
B EXCAVATION WORKS
C CONCRETOR
1 Sub-structure $..............................
(a) Pilecaps
(i) Lean concrete Sum $..........................
(d) Waterproofing
(i) Waterproofing system to underside of Sum $..........................
ground slab
Carried Forward
2 Frame $..............................
(a) Columns / Precast Columns
(i) Concrete Sum $..........................
3 Staircase $..............................
(a) Stair structure
(i) Concrete Sum $..........................
Carried Forward
Wastage
Allowance for wastage at _______% of
Profit
Allowance for overheads & profit at
_______% of supply and delivery rate;
Carried Forward
(b) Cement sand screed backing to receive floor tiles Sum $.........................
Wastage
Allowance for wastage at _______% of
supply and delivery rate;
Profit
Allowance for overheads & profit at
_______% of supply and delivery rate;
Carried Forward
Wastage
Allowance for wastage at _______% of
supply and delivery rate;
Profit
Allowance for overheads & profit at
_______% of supply and delivery rate;
Carried Forward
Wastage
Allowance for wastage at _______% of
supply and delivery rate;
Profit
Allowance for overheads & profit at
_______% of supply and delivery rate;
(a) Fibre plaster ceiling with low VOC washable Sum $.........................
emulsion paint finish (water absorption not
exceeding 5%) to come w/ necessary access
panels
(b) Acoustic fibre plaster ceiling with low VOC Sum $.........................
washable emulsion paint finish (water absorption
not exceeding 5%) to come w/ necessary access
panels
(c) Fibre plaster ceiling with low VOC washable
emulsion paint finish with insulation to avoid
condensation (water absorption not exceeding 5%) Sum $.........................
to come w/ necessary access panels
(d) Fire rated fibre plaster ceiling with low VOC
washable emulsion paint finish with insulation to
avoid condensation (water absorption not
exceeding 5%) to come w/ necessary access Sum $.........................
panels
(e) Moisture resistant calcium silicate ceiling board
with low VOC washable emulsion paint finish to
come w/ necessary access panels Sum $.........................
Carried Forward
(l) Deck Mounted Basin Tap with Long Lever Handle Sum $.........................
Carried Forward
(aa) Sluice Room Lockable Bib Tap with Hose Sum $.........................
Coupling
(ac) Recessed Moulded Solid Surface Sink with Under- Sum $.........................
counter Leg Space
13 Sundries $..............................
(a) Bumper railing / Wall protection guards Sum $.........................
Carried Forward
Carried Forward
Super-structure
1 Frame $..........................
(a) Columns / Precast Columns Sum $..........................
(g) RC plinths
Carried Forward
Super-structure (Cont'd)
3 Staircase $..........................
(a) Stair structure
(i) Concrete Sum $..........................
Carried Forward
Wastage
Allowance for wastage at _______% of
Profit
Allowance for overheads & profit at
_______% of supply and delivery rate;
(b) Cement sand screed backing to receive floor tiles Sum $.........................
Carried Forward
Wastage
Allowance for wastage at _______% of
supply and delivery rate;
Profit
Allowance for profit at _______% of supply
and delivery rate;
Carried Forward
Wastage
Allowance for wastage at _______% of
supply and delivery rate;
Profit
Allowance for profit at _______% of supply
and delivery rate;
Carried Forward
Wastage
Allowance for wastage at _______% of
supply and delivery rate;
Profit
Allowance for overheads & profit at
_______% of supply and delivery rate;
(a) Fibre plaster ceiling with low VOC washable Sum $.........................
emulsion paint finish (water absorption not
exceeding 5%) to come w/ necessary access
panels
(b) Acoustic fibre plaster ceiling with low VOC Sum $.........................
washable emulsion paint finish (water absorption
not exceeding 5%) to come w/ necessary access
panels
Carried Forward
(l) Deck Mounted Basin Tap with Long Lever Handle Sum $.........................
Carried Forward
(aa) Sluice Room Lockable Bib Tap with Hose Coupling Sum $.........................
(ac) Recessed Moulded Solid Surface Sink with Under- Sum $.........................
counter Leg Space
13 Sundries $..........................
(a) Railing Sum $.........................
Carried Forward
Carried Forward
Carried Forward
Super-structure
1 Frame $..........................
(a) Columns / Precast Columns Sum $..........................
Carried Forward
Super-structure (Cont'd)
3 Staircase $..........................
(a) Stair structure
(i) Concrete Sum $..........................
Carried Forward
Wastage
Allowance for wastage at _______% of
Profit
Allowance for overheads & profit at
_______% of supply and delivery rate;
Carried Forward
(b) Cement sand screed backing to receive floor tiles Sum $.........................
Wastage
Allowance for wastage at _______% of
supply and delivery rate;
Profit
Allowance for overheads & profit at
_______% of supply and delivery rate;
Carried Forward
Wastage
Allowance for wastage at _______% of
Profit
Allowance for overheads & profit at
_______% of supply and delivery rate;
Wastage
Allowance for wastage at _______% of
supply and delivery rate;
Profit
Allowance for profit at _______% of supply
and delivery rate;
Carried Forward
(b) Acoustic fibre plaster ceiling with low VOC Sum $.........................
washable emulsion paint finish (water absorption
not exceeding 5%) to come w/ necessary access
panels
(c) Fibre plaster ceiling with low VOC washable Sum $.........................
emulsion paint finish with insulation to avoid
condensation (water absorption not exceeding
5%) to come w/ necessary access panels
(d) Fire rated fibre plaster ceiling with low VOC Sum $.........................
washable emulsion paint finish with insulation to
avoid condensation (water absorption not
exceeding 5%) to come w/ necessary access
panels
(g) 600 x 600 Grid ceiling with fibre plaster ceiling Sum $.........................
panels with concealed suspension system to
come w/ necessary access panels
(h) 600 x 600 Grid ceiling with heavy duty, washable, Sum $.........................
moisture-resistant, anti-mould aluminum ceiling
panels with concealed suspension system to
come w/ necessary access panels
(h) Skim coat on soffit with low washable emulsion Sum $.........................
paint finish
Carried Forward
(l) Deck Mounted Basin Tap with Long Lever Handle Sum $.........................
Carried Forward
(aa) Sluice Room Lockable Bib Tap with Hose Coupling Sum $.........................
13 Sundries $..........................
(a) Railing Sum $.........................
Carried Forward
Carried Forward
Super-structure
1 Frame $..........................
(a) Precast Columns / Columns Sum $..........................
Carried Forward
Super-structure (Cont'd)
3 Staircase
(a) Stair structure $..........................
(i) Concrete Sum $..........................
Carried Forward
Wastage
Allowance for wastage at _______% of
Profit
Allowance for overheads & profit at
(b) Cement sand screed backing to receive floor tiles Sum $.........................
Carried Forward
Wastage
Allowance for wastage at _______% of
supply and delivery rate;
Profit
Allowance for overheads & profit at
_______% of supply and delivery rate;
Wastage
Allowance for wastage at _______% of
supply and delivery rate;
Profit
Allowance for overheads & profit at
_______% of supply and delivery rate;
Carried Forward
Wastage
Allowance for wastage at _______% of
supply and delivery rate;
Profit
(b) Acoustic fibre plaster ceiling with low VOC Sum $.........................
washable emulsion paint finish (water absorption
not exceeding 5%) to come w/ necessary access
panels
Carried Forward
(d) Fire rated fibre plaster ceiling with low VOC Sum $.........................
washable emulsion paint finish with insulation to
avoid condensation (water absorption not
exceeding 5%) to come w/ necessary access
panels
(e) Moisture resistant calcium silicate ceiling board Sum $.........................
with low VOC washable emulsion paint finish to
come w/ necessary access panels
(g) 600 x 600 Grid ceiling with fibre plaster ceiling Sum $.........................
panels with concealed suspension system to
come w/ necessary access panels
(h) 600 x 600 Grid ceiling with heavy duty, washable, Sum $.........................
moisture-resistant, anti-mould aluminum ceiling
panels with concealed suspension system to
come w/ necessary access panels
(h) Skim coat on soffit with low washable emulsion Sum $.........................
paint finish
Carried Forward
(l) Deck Mounted Basin Tap with Long Lever Handle Sum $.........................
Carried Forward
(aa) Sluice Room Lockable Bib Tap with Hose Coupling Sum $.........................
(ac) Recessed Moulded Solid Surface Sink with Under- Sum $.........................
13 Sundries $..........................
(a) Railing Sum $.........................
Carried Forward
Carried Forward
RC FLAT ROOF
1 Frame $..........................
(a) Precast Columns Sum $..........................
3 Roof $..........................
(a) Roof Slab
(i) Concrete Sum $..........................
4 Staircase
(a) Stair structure $..........................
(i) Concrete Sum $..........................
Carried Forward
Super-structure (Cont'd)
Carried Forward
9 Sundries $..........................
(a) Concrete plinth Sum $.........................
EXTERNAL WORKS
Carried Forward
10 Drainage $..........................
(a) Drain construction Sum $..........................
Carried Forward $
14 Bollards $..........................
18 Trellis
A ELECTRICAL WORKS
A1 ELECTRICAL INSTALLATION
Carried Forward
Carried Forward
$..........................
Carried Forward
Carried Forward
1 Supply, install, test and commission one set of 250 kVA @ 0.8
PF weatherproof outdoor emergency diesel generator system
(Prime rated) complete with attenuators and silencer, automatic
main failure panel, batteries, battery charger and other
accessories for the complete installation as specified.
$..........................
Carried Forward
A3 EARTHING SYSTEM
Carried Forward
2 Supply, install, test and commission of all fans for all common
areas, except ward areas and staff accomdation, complete with
all accessories as specified.
$..........................
(i) 1st Storey Sum $..........................
Carried Forward
Carried Forward
Carried Forward
Carried Forward
Carried Forward
A7 TELECOMMUNICATION SYSTEM
Carried Forward
Carried Forward
2 Supply, install, terminate, test and commission all the data points
including the patch panels, Cat 6A UTP cablings, Fibre Optic
Cablings, RJ 45 outlets, wireless AP points, junction boxes and
other accessories for the complete installation as specified and
shown in the drawings.
$..........................
(i) 1st Storey Sum $..........................
Carried Forward
Carried Forward
A9 DIGITAL TV SYSTEM
Carried Forward
Carried Forward
2 Supply and install the cable support system including cable trays,
conduits, hangers and other accessories for the complete
installation as specified and shown in the drawings.
$..........................
Carried Forward
Carried Forward
1 Supply, install, test and commission all the main card access and
security alarm system including data server, workstations,
system monitoring software, card reader, controller, , door
contacts units, EM lock, exit push button units, break glass units,
cablings and all other needed accessories for the complete
installation as specified and shown in the drawings.
$..........................
Carried Forward
Carried Forward
Carried Forward
Carried Forward
Carried Forward
A17 PRELIMINARIES
Carried Forward
MECHANICAL WORKS
Carried Forward
Carried Forward
Sum $..........................
Carried Forward
Carried Forward
Carried Forward
$..........................
a 1st Storey Public Thoroughfare (Fresh air system)
Sum $..........................
c 1st Storey SCC Nurse Room (Exhaust air system) Sum $..........................
f 1st Storey Bio Hazard Room (Fresh air and exhaust air
systems)
Sum $..........................
g 1st Storey Bin Centre (Fresh air and exhaust air systems)
Sum $..........................
Carried Forward
m 2nd Storey MDF Room (Fresh air and exhaust air systems)
Sum $..........................
w 3rd to 6th Storey Haze Shelter (Fresh air and exhaust air
systems) Sum $..........................
Carried Forward
ac Purging system for Senior Care Center (1st Storey) Sum $..........................
ak Purging system for Kitchen Dry Store (7th Storey) Sum $..........................
b 1st Storey to Roof Fire Lift Lobby 1 with duty and standby
fresh air fan system Sum $..........................
c 1st Storey to Roof Fire Lift Lobby 2 with duty and standby
fresh air fan system Sum $..........................
Carried Forward
$..........................
$..........................
a 2nd Storey Multi Purpose Hall, PTOT Sum $..........................
$..........................
a 3rd to 7th Storey Gridline 5-E Isolation Rooms Sum $..........................
Carried Forward
$..........................
a 1st Storey Holding Room Sum $..........................
$..........................
24 Preliminaries $..........................
MECHANICAL WORKS
$..........................
Carried Forward
Brought Forward
Carried Forward
Carried Forward
$..........................
a 1st Storey Sum $..........................
Carried Forward
$..........................
$..........................
a 1st Storey Sum $..........................
Carried Forward
Carried Forward
FIRE EXTINGUISHERS
16 Complete supply, delivery, installation, testing and
commissioning of one (1) lot of portable fire extinguishers as
indicated in the architectural tender drawings. The works shall
also include brackets and all necessary accessories to effect a
complete installation.
$..........................
a 1st Storey Sum $..........................
Carried Forward
Carried Forward
$..........................
28 Preliminaries $..........................
Carried Forward
MECHANICAL WORKS
Carried Forward
Carried Forward
Carried Forward
Carried Forward
$..........................
a Lift Pits for Fire Lift Lobby 1 Sum $..........................
Carried Forward
19 Preliminaries $..........................
Carried Forward
$..........................
$..........................
Carried Forward
Carried Forward
Carried Forward
Carried Forward
$..........................
Carried Forward
$..........................
Carried Forward
Carried Forward
$..........................
24 Preliminaries $..........................
Carried Forward
$..........................
$..........................
7 Preliminaries $..........................
E LIFT INSTALLATION
3 Power and lighting in lift shafts and lift pits complete with all
necessary cabbling, cable containment, accessories, etc
$..........................
5 Lift control panels and lift supervisory panels complete with all
necessary cabling, cable containment , accessories, etc
$..........................
10 Preliminaries $..........................