Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

PROJECT

24
SPONSORS 

Total PARTICIPATING
ROADMAP Commitments



STATES PLUS
 
BACKGROUND Received:  FHWA*
 
The desired outcome of the work under $2,100,000.00* 

 Potential
the TPF-5(372) Project is to establish    
a standard for bridge semantic and
*As of March 2021
 AASHTO

geometric information that is common Publications
in the United States, which is a https://www.pooledfund.org/ 
continuation of a previous effort known Details/Study/624 • BIM for

as the IFC Bridge project to create https://www.bimforbridgesus.com Bridges IDM
international standards. The resulting   • BIM for Bridges

products from the TPF-5(372) may be
used by States as a baseline for future  MVD
projects to further refine standards • BIM Guide for MVD
at the local level. The work under this
 certification
project will be conducted in a series
of activities in a five-year timeline to
accomplish four major goals: TPF-5(372) ADVANCES U.S. NATIONAL STANDARDS
   ­ ƒ  ­‡ˆ‹

    
š
• ­‡ˆ‹ ‚ ƒ‚ 


    ­€

‚ 
     ‘ ‰–‘—‘€
‡’–‹˜—
 

  ‡™ ƒ  
•ˆ ˆ­‡ ‚   
   
  € ‚„    †‰ ‡„„ š
­
‚ ƒ  ƒ‚ 
  
 ‚ ‘‘€
     ‘ ‰­€


€€ †
 ­ ƒ  
  ­‡ˆŒ  

    
 


ƒ
  
        Œˆƒ
 Ž…   †

  ƒ„ 
  ƒ„
 „ Š
ƒ  ˆ„ ­ „ „„ ‘€


…  
 ­‡ 
  ­ ‚  ‚   …ƒ…  ‚
 ‰Š
 ‹ˆ€ … ƒ€Ž…  ƒ
 € ƒ… †  ­ ƒ   ‚ 
€€ †
˜“Š

„‚

„
‹˜˜„ Œ‹   
­‡ˆ
 ‚ 
ˆ… ‚‚„  „

 ‰Š
 ­ ƒ     ’ˆ­… ‚ ƒ   ‚‚ ƒ‚

  ­‡ˆŒ
   “ƒ
ˆ”„ƒ†‚  


   
   

3.   


Add event 2021:  
 
4.
   

 
ƒInvolvement
Add event 2023: Stakeholder



   
(it was removed in this last 
     


  „

 
   
 
 

  


iteration when


  
we added the list of



 

 ­   
 ­… tasks to be  


added to the scope). I know 
  ­  

  €
  €

 „ … this will make it even busier, so not sure 
‚ 
 
 
 
 what we can do. 

ƒ




  ƒ ‚
 
    

You might also like