ANALYSIS
ANALYSIS
Proposed Dimension
Pot. A
23.6 m
66 m
0.3 m
1m
23.6 m
-Pot. A-
All Equipment
PAYLOAD EQUIPMENT = 1300 KN/m2
Foundation depth = 1m SF = 3
Permissible Settlement = 0.05 m
Rebar X
(Top) =
2122.466 mm2/m
Used = 16 - 150
A= 1406.72 mm2/m (need 2 Layer or above)
2 layer = 2813.44 mm2/m (ok)
Rebar X
(Bot) =
3380.059 mm2/m
Used = 19 - 150
A= 1983.695 mm2/m (need 2 Layer or above)
2 layer = 3967.39 mm2/m (ok)
Used = 19 - 150
A= 1983.695 mm2/m (need 2 Layer or above)
2 layer = 3967.39 mm2/m (ok)
Used = 19 - 150
A= 1983.695 mm2/m (need 2 Layer or above)
2 layer = 3967.39 mm2/m (ok)