Machine
• Machine Change.
• Engineering change in Machine.
• Preventive Maintenance planned.
• Break down maintenance done on machine.
• Fixture change in machine.
• Removing or adding external process on machine
Material
• New Supplier or change current supplier
• New Material for approval source of trial.
• Same Supplier but mixing combination change.
Method
• Any Deviation form Process control (Process Parameter Change)
• Process Sequence Change.
• Additional process implemented.
• New technology implemented
Type of 4M change
1. Planned (Permanent)
2. Un Planned (Temporary)
Planned (Permanent) Type Change
Retroactive
• To trace back from where problem arise in
production.
Criteria : 4 M Change
MAN MATERIAL METHOD MACHINE
Extended shift working ( Source of supply Any deviation from Process control Machine Change - planned
over 2 shifts ) - change for controlled standard - planned
unplanned item- planned
Manpower change Different spec / Process sequence change -Unplanned Breakdown Maint. Which
( regular) Grade of incoming affects process / quality of
controlled material product - unplanned
from approved
source for trials -
planned
Person left shift job due Material New technology introduction - planned Fixture change - such as enamel
to sickness Composition change- applicator - planned
Planned
New joinee - planned Material Additional process adopted - planned Preventive maintanence. -
Combination Change- planned
Planned