SolarRiver 3000TLA-US SolarRiver 7000TLA-US

SolarRiver 3800TLA-US SolarRiver 8000TLA-US


SolarRiver 5000TLA-US SolarRiver 9000TLA-US
SolarRiver 6000TLA-US SolarRiver 10000TLA-US
Samil Design Samil Power
Sy ig Software
System Design Monitoring Portal
Solar Power Browser
www.SAMILPOWER.com
Samil Power Software
Table of Contents EN
About this Installation Guide .......... 2 AC- and DC-Connection ............... 23
Safety Symbols............................... 3 Starting the Inverter ...................... 32
Important Safety Instructions .......... 4 ,QYHUWHU&RQ¿JXUDWLRQ ................... 34
Intended Use .................................. 5 Opening the Inverter ..................... 35
Electrical Safety .............................. 6 Communcation Ports .................... 41
Inverter Function........................... 10 Display Messages ........................ 44
Labels and Markings on Arc Fault Current
the Inverter ....................................11 Interrupter (AFCI) ......................... 46
Connections on the Inverter ......... 12 Periodic Inspection ....................... 48
User Interface .............................. 13 Technical Data .............................. 50
Unpacking..................................... 16 FCC compliance information ........ 52
Mounting the Inverter.................... 18

AC

DC

SR3-10TLA-US-IG_10_EN0714
1
SolarRiver 3000TLA-US
1 x MPPT
SAVE THESE INSTRUCTIONS EN
Max. DC-Power 3500 W This manual contains important Terms:
Max. AC-Power 3300 VA instructions for Models Installer 4XDOL¿HGWHFKQLFLDQ
Manufacturer: 208 V AC, 240 V AC 3000TLA-US/ 3800TLA-US / in charge of the
Suqian High-tech Industrial 5000TLA-US / 6000TLA-US / installation
Development Zone SolarRiver 3800TLA-US 7000TLA-US / 8000TLA-US / Supplier Company the product
Jiangsu Province, 2 x MPPT 9000TLA-US / 10000TLA-US was purchased from
P.R.China. 223800 Max. DC-Power 4200 W that shall be followed during Inverter PV-inverter described
Max. AC-Power 3800 VA installation and maintenance of the in this installation guide
208 V AC, 240 V AC SolarRiver utility interactive inverter.
Target group:
SolarRiver 5000TLA-US 4XDOL¿HGWHFKQLFLDQV
2 x MPPT
Max. DC-Power 5800 W
Max. AC-Power 5500 VA
208 V AC, 240 V AC
SolarRiver 6000TLA-US
2 x MPPT
Max. DC-Power 6800 W
Max. AC-Power 6600 VA
208 V AC, 240 V AC, 277 V AC
SolarRiver 7000TLA-US
2 x MPPT
Max. DC-Power 7900 W
Max. AC-Power 7700 VA
208 V AC, 240 V AC, 277 V AC
SolarRiver 8000TLA-US
2 x MPPT
Max. DC-Power 9000 W
Max. AC-Power 8800 VA
208 V AC, 240 V AC, 277 V AC
SolarRiver 9000TLA-US
2 x MPPT
Max. DC-Power 10100 W
Max. AC-Power 9900 VA
208 V AC, 240 V AC, 277 V AC
SolarRiver 10000TLA-US
2 x MPPT
Max. DC-Power 11300 W
Max. AC-Power 11000 VA
208 V AC, 240 V AC, 277 V AC

SR3-10TLA-US-IG_10_EN0714
2
Safety Symbols EN
Life threatening voltages are Countermeasures that must
processed inside the inverter. be taken in order to avoid the
Hazardous situations that can lead to hazardous situation are indicated with
death or serious injuries are indicated an arrow:
with the “WARNING” symbol (1) on Î “This is an example how to avoid a
1 the left. hazardous situation.”
Hazardous situations that can result in
damage of the inverter are indicated
with the “CAUTION” symbol (2) on the
left.

SR3-10TLA-US-IG_10_EN0714
3
IMPORTANT SAFETY INSTRUCTIONS EN
1 ? 2
1. WARNING! Danger of electric
shock!
WARNING! Danger of
HOHFWULFVKRFNDQG¿UH
Î Read this Installation Î The installation, wiring and
Guide carefully. Follow all FRQ¿JXUDWLRQPXVWEHGRQHE\
instructions. TXDOL¿HGSHUVRQQHORQO\
2. Contact your supplier when you Î Never modify the inverter unless
have questions. explicitly instructed to do so by the
3. Wear safety shoes when lifting manufacturer.
and transporting.
4. 2 people are required for lifting Keep this installation guide near the
and transporting. inverter!

SR3-10TLA-US-IG_10_EN0714
4
Intended Use EN
The inverter (1) converts DC-power CAUTION! Risk of damaging
from the PV-generator (2) to AC- the inverter!
power. The AC-power is fed into the Î Do not connect other DC-power
DC AC grid (3). In case of a grid failure: The sources (6) such as wind power
1 3 inverter automatically disconnects systems, hydroelectric generators,
2 (4) from the grid. The inverter fuel cells or batteries.
automatically reconnects when the
grid is restored. The inverter can
only be used for DC-power from PV-
generators (5).

SR3-10TLA-US-IG_10_EN0714
5
Electrical Safety EN
1. The installation must be done 2. WARNING! Risk of electric
according to the applicable shock! The PV-panels emit a
standards, codes and laws at dangerous DC-voltage when
the installation site. Installations exposed to sunlight.
in the US must comply with Î Cover PV-panels with opaque
1 National Electrical Code® (ANSI/ material before working on DC-
ANSI NFPA 70). Installations in Canada connection.
must comply with the codes and
NEC
standards applicable in Canada.
UL This Installation Guide does not
replace any local, state or federal
codes, standards or regulations

DC

SR3-10TLA-US-IG_10_EN0714
6
Electrical Safety EN
1 1. Local regulations and standards 4. Warning! Risk of electric shock!
can require that disconnection Both DC and AC voltage is
switches are installed on the AC or terminated inside the inverter.
DC side. Î Disconnect DC and AC voltage
2. WARNING! Risk of electric before servicing.
VKRFNDQG¿UH
Î Ensure that the PV-modules
have a maximum system
voltage of 600 V or higher.
3. Observe NEC 690.9: Install series
fuse when necessary.

2 3

DC AC

SR3-10TLA-US-IG_10_EN0714
7
Electrical Safety EN
1. WARNING! Electric shock 2. The inverter is not equipped with
hazard. The DC conductors an isolation transformer. The
of the photovoltaic system installation must comply with
1 are ungrounded and may be National Electrical Code®, Article
energized. 690.35

+
-

DC AC

SR3-10TLA-US-IG_10_EN0714
8
Electrical Safety EN
WARNING! Electric shock hazzard.
1. The DC conductors of the
photovoltaic system are normally
not grounded.
2. The DC conductors become
intermittently grounded without
indication when the inverter
measures the PV-array isolation.

+
- AC
2
1

SR3-10TLA-US-IG_10_EN0714
9
Inverter Function EN
5 1. DC-side disconnection switch 8. AC-monitoring
(Standard) 9. AC-side surge voltage protection
2. AFCI 10. Connection compartment
(Arc Fault Circuit Interruptor) 11. 1” conduit opening (AC)
3. DC-side surge voltage protection 12. 2 x 1“ conduit opening (DC)
4. DC-side insulation monitoring 13. 2 x 1/2” conduit opening
5. 2 x MPPT (Communication)
(SR 3000TLA-US: 1 x MPPT) 14. Note: The neutral conductor is
6. AC-side disconnection relay not connected to PE inside the
4 6 7. GFCI inverter.
(Ground Fault Circuit-Interrupter)
3 7

2 8

1
9
WiFi 8
RS485

14

10

12 13 11

DC1+ L1 PE
DC1 - L2
N

DC2+
DC2 -

SR3-10TLA-US-IG_10_EN0714
10
Labels and Markings on the Inverter EN
Symbols on Type Label: Periodic Inspection:
1 General Symbols Check if all markings and
1. Warning: Hot Surfaces! safety symbols are clearly visible on
2. Type label the inverter. Replace if necessary.
3. Label with serial number
4. General Warnings
2

‰!
!
!
‰‰
′″″
″″
″″

SR3-10TLA-US-IG_10_EN0714
11
Connections on the Inverter EN
5. DC-Switch
ON 6. 1” Openings for DC connection
7. 1” Opening for AC connection
8. 1/2” openings for communication
(RS485 and Ethernet)
4
1 Caution! Risk of damaging the
OFF inverter due to water in the
enclosure.
Î Do not enlarge the openings of
the enclosure.

2 3

SR3-10TLA-US-IG_10_EN0714
12
User Interface EN
1. Display 7. Up / Down Keys:
2. GFCI LED Navigate Menus, increase /
3. Alarm/Fault LED decrease values
4. Normal LED 8. OK Key:
5. WiFi LED &RQ¿UPVHOHFWLRQ
6. ESC Key The display and menu structure is
Press ESC-key in order to exit described on page 34.
current screen The LEDs are described on page 14.
2

1 3

6 8 5

GFCI

Alarm/Fault

Normal

ESC OK
WIFI

SR3-10TLA-US-IG_10_EN0714
13
Description of the LEDs EN
1. GFCI 3. Normal
Flashing Red: Solid Green: Inverter is
Ground fault detected on DC side. conducting self-test / checking
Inverter is disconnected from grid. AC-grid
2. Fault / Alarm Flashing Green: Inverter is
Flashing Yellow: Alarm detected feeding to the grid.
and operation continues. 4. WiFi
2 Flashing Red: Fault detected Solid Red: No WiFi activities
and operation is stopped. LED Flashing Red: WiFi
NHHSVÀDVKLQJDVORQJDVDODUPLV communication.
3 present. Details are indicated on
the display.
4

GFCI

Alarm/Fault

Normal

ESC OK
WIFI

SR3-10TLA-US-IG_10_EN0714
14
Display: “Settings” Menu / Password EN
The “Settings” menu is protected with
a password. The default password is
“0000”

GFCI

Alarm/Fault

Normal

ESC OK
WIFI

RUNNING «…
SETTINGS

RUNNING
SETTINGS «…

Password
****

OK OK

Password
0000

OK

SR3-10TLA-US-IG_10_EN0714
15
Unpacking EN
1 2 Proceed as follows: 4. Check all items for visible
1. Check the packaging for damages.
damages. 5. Contact your supplier when
2. Contact your supplier in case items are missing or the inverter
packaging is damaged. is damaged. Do not install a
3. Unpack the inverter. Check if damaged inverter.
all items of the packing list are Keep packaging for later use.
included. The scope of delivery is 7KHSDFNLQJOLVWLVVSHFL¿HGRQWKH
listed on the following page following page.

4 5

SR3-10TLA-US-IG_10_EN0714
16
SolarRiver
Packing List EN
3000TLA-US / 3800TLA-US / 1. Inverter 6. 4XDOWL\FHUWL¿FDWH
5000TLA-US / 6000TLA-US 2. Wall mounting bracket 7. :DUUDQW\FHUWL¿FDWH
1 3. Screw bag (Screw bag 8. Magnetic brackets (Only
2 3 4 containing: SR3000TLA-US,
‡4 pc. 6x40 screw SR3800TLA-US,
‡4 pc. PEB8-38 wall plug SR5000TLA-US,
‡2 pc. 6x20 screw) SR6000TLA-US)
4. Packing list
5. Installation guide Keep packaging for later use.

5 6 7

SolarRiver
1 7000TLA-US / 8000TLA-US /
2 9000TLA-US / 10000TLA-US

3 4

5 6 7

SR3-10TLA-US-IG_10_EN0714
17
Required Tools EN
The following tools are required for
the installation of the inverter:
1. Crimping tool for PE-connection
2. Cable stripping tool
3. Drill
4. Multimeter
5. Pencil
6. Screwdriver
7. Hammer
8. Level
9. Torque screwdriver
10. Hex key

1 2 3

10

5 6 7 8 9

SR3-10TLA-US-IG_10_EN0714
18
Mounting Bracket: Dimensions EN
440 mm / 17.3 in.
Requirements for the installation
50 mm /
2.0 in. ORFDWLRQDUHVSHFL¿HGRQWKHIROORZLQJ
pages.
Mounting the inverter: Use stainless
75 mm /
steel screws. Screws are included in
2.9 in. delivery.
3000TLA-US
3800TLA-US
5000TLA-US 15 x 7 mm

502 mm / 19.7 in.


6000TLA-US 0.6 x 0.3 in.
280 mm / 11.0 in.

75 mm /
2.9 in.

440 mm / 17.3 in.


50 mm /
2.0 in.

33.5 mm /
XXX in.

7000TLA-US 40.5 mm /
8000TLA-US XXX in.
15 x 7 mm
9000TLA-US 0.6 x 0.3 in.
10000TLA-US
280 mm / 11.0 in.
588 mm / xx.x in.

100 mm /
xxx in.

SR3-10TLA-US-IG_10_EN0714
19
EN

min.
Gerald vondSvon Stein-S 20 cm / 7.9 in.

30 cm / 11.8 in.
min.

min.
30 cm /
11.8 in.

A C

D ES
min.
50 cm / 19.7 in.

SolarRiver A B C D Weight

38.0 / 58.0 / 20.3 21.8 /


3000TLA-US 15.0 23.8 8.0 8.4
26.0 kg / 57.3 lb.

3800TLA-US 38.0 /
15.0
58.0 /
23.8
20.3
8.0
21.8 /
8.4 27.5 kg / 60.6 lb.
Gerald von Stein-Salisbury
38.0 / 58.0 / 20.3 21.8 /
5000TLA-US 15.0 23.8 8.0 8.4
29.0 kg / 64.0 lb

38.0 / 58.0 / 20.3 21.8 /


6000TLA-US 15.0 23.8 8.0 8.4 30.0 kg / 66.0 lb
FR
47.0 / 70.0 / 20.3 21.8 /
7000TLA-US 18.5 27.6 8.0 8.4
42.5 kg / 93.7 lb

47.0 / 70.0 / 20.3 21.8 /


8000TLA-US 18.5 27.6 8.0 8.4 42.5 kg / 93.7 lb

47.0 / 70.0 / 20.3 21.8 /


9000TLA-US 18.5 27.6 8.0 8.4
43.5 kg / 95.9 lb

47.0 / 70.0 / 20.3 21.8 /


10000TLA-US 18.5 27.6 8.0 8.4
43.5 kg / 95.9 lb

All dimensions in cm / in.

SR3-10TLA-US-IG_10_EN0714
20
re t r
e
moc vnI de MT
.rew it-di
o rG
MP- plimas.wwVP
LT0 w
007
eka
L ralo
S

V 00V 0001
8 :x
A 5. - 083 : am,CDV
11 PP
A 31 x 2 :x M,CDV
x 2 am,CDI
:cs,C

SHoR
DI

V 00
4/
W 0032 :r
0 ,C
AV 0 07 :r,CAV
zH 0 007 : AP
6 / 0 xamS
5:
8.0+ A 01 :r,CAf
...1..
.8.0- xam,CAI
:) (
soc
I evitc
:ssa etor
lC P
no
:ecitacin
56P ss afretnuImmoC
I erg
:noi nI
tcet
orP

100
823
170
T :N
/S

< 15 °
.nim CA
5
CD

max.
2000 m
6 561 ft.

< +60 °C / 140 °F > +60 °C / 140 °F


> -25 °C / -13 °F < -25 °C / -13 °F

< 95 % > 95 %

SR3-10TLA-US-IG_10_EN0714
21
Mounting the Inverter EN
1 2 Proceed as follows for mounting 4. Check correct position.
the inverter: 5. On bottom of inverter: Screw
1. On plasterboard walls: Use center inverter to wall mounting bracket.
holes. Screw wall mounting Use 6x20 screws enclosed in
bracket to wall stud. delivery.
2. On massive walls: Use outside 6. Optional: Secure the inverter with
holes. Screw wall mounting a padlock.
bracket to wall.
3. Hang inverter on wall mounting
bracket.

3
4

5 5

T+ T- R+ R-

PV1+ PV1+ PV1- PV1- PV2+ PV2+ PV2- PV2- 3 2 1

LOCK

SR3-10TLA-US-IG_10_EN0714
22
3000TLA-US/ 3800TLA-US / 5000TLA-US / 6000TLA-US / AC-Connection - Requirements EN
7000TLA-US / 8000TLA-US / 9000TLA-US / 10000TLA-US: Overcurrent protection for the AC 10. Wire sizes and torques:
208 VAC / 240 V AC
output circuit must be provided in See page 37.
L1 the electrical installation. Refer to 11. Use 1 inch conduit for the AC
1 the National Electrical Code®, ANSI/ connection
L2
NFPA 70.
7. Use suitable circuit breaker.
N 8. :$51,1*5LVNRI¿UH
PE
Î Do not connect any consumers
6000TLA-US / 7000TLA-US / 8000TLA-US / to the AC-line
9000TLA-US / 10000TLA-US: 9. Recommendation: Keep
277 V AC cable losses below 1 %. Keep
L1 impedance below 0.2 Ohm.
1
N
PE

2
L1

L2
N
PE
3

5 5

4 4

SR3-10TLA-US-IG_10_EN0714
23
1
Opening Connection Compartment EN
L1 1. Deactivate AC-power. CAUTION! Danger of damaging the
2. Check that no voltage is present. inverter with electrostatic discharge.
3. Prevent accidental reactivation. Î Pay attention to all ESD
2 1 4. Deactivate DC-power countermeasures (7).
L2 3 5. Remove 2 screws on bottom
0V ? Note: There are no user servicable
N compartment parts under the top cover.
6. Remove lid. Î Do not remove top cover (8).
PE

1
OFF

SR3-10TLA-US-IG_10_EN0714
24
L3 AC-Connection - 208 V AC / 240 V AC EN
‡ Connect AC-cable to inverter as
shown in the illustration.
‡ Check proper connection.

120 V
8V

20
208 V - 3-Phase Delta 1RWH7KHJULGW\SHPXVWEHVSHFL¿HG

20

8V
12 in the “Settings” menu.
0V 0V
12 N
L1 208 V L2
240 V
240 V - Splitphase 120 V 120 V
L1 L2

N L2 L1

PE
T+ T- R+ R-

PV1+ PV1+ PV1- PV1- PV2+ PV2+ PV2- PV2- 3 2 1

1 inch

SR3-10TLA-US-IG_10_EN0714
25
L3 AC-Connection - 277 V AC EN
:$51,1*5LVNRI¿UH Proceed as follows for the
Î Do not connect SolarRiver connection to the 277 V AC grid:
3000TLA-US - 3800TLA-US to ‡ Connect AC-cable to inverter as

277 V
277 V AC grid. shown in the illustration.

0V
‡ Check proper connection.

48
Î The following inverters are
277 V - 3-Phase Y 1RWH7KHJULGW\SHPXVWEHVSHFL¿HG

48

0V
27 suitable for the connection to
7 V 7V a 277 V AC grid: SolarRiver in the “Settings” menu.
27 N 6000TLA-US - 10000TLA-US.

L1 480 V L2

L1 N

PE
T+ T- R+ R-

PV1+ PV1+ PV1- PV1- PV2+ PV2+ PV2- PV2- 3 2 1

1 inch

SR3-10TLA-US-IG_10_EN0714
26
DC-Connection - Requirements EN
+ 3000 - 6000TLA-US 1. CAUTION! Risk of damaging the 4. The DC-ports can be connected:
- UDC MAX < 550 VDC inverter! Install diodes in order to avoid
Î Ensure that the voltage and reverse currents.
1 FXUUHQWLVEHORZWKHVSHFL¿HG 5. Cover PV-modules when working
7000 - 10000TLA-US values. on the DC-connection.
+ UDC MAX < 600 VDC 2. Do not connect the + or - poles to 6. WARNING! Risk of electric
- ground. shock!
3. The inverter is equipped with two Î Do not work on the DC-cables
separate MPP-trackers. when the PV-modules are not
(Exception: SR 3000TLA-US) covered.
7RUTXHVDQGZLUHVL]HVDUHVSHFL¿HG
2 2 on page 37

+ DC1+
- DC1 -
MPPT
3
MPPT
+ DC2+
- DC2 -

+ DC1+
- DC1 -
4

+ DC2+
- DC2 -

5 6

SR3-10TLA-US-IG_10_EN0714
27
3800TLA-US / 5000TLA-US / 6000TLA-US /
7000TLA-US / 8000TLA-US / 9000TLA-US /
10000TLA-US

+ PV1+ 3000TLA-US + PV1+


- PV1 - - PV1 -

PV2+ + PV2+
PV2 - - PV2 -

Number of Number of
Strings Strings
SolarRiver PV1 PV2

PV2 +
PV1 +

PV2 +
PV2 +
SolarRiver PV1 PV2

PV1 +
PV1 +

PV2 +
PV1 +

PV1 -

PV2 -
PV1 -

PV2 -
PV1 -

PV2 -
PV1 -

PV2 -
3000TLA-US 2 - 3000TLA-US 2 -
3800TLA-US 2 2 3800TLA-US 2 2
5000TLA-US 2 2 5000TLA-US 2 2
6000TLA-US 2 2 6000TLA-US 2 2
7000TLA-US 2 3 7000TLA-US 2 2
8000TLA-US 2 3 8000TLA-US 2 3
9000TLA-US 2 3 9000TLA-US 2 3
10000TLA-US 2 3 10000TLA-US 2 3

T+ T- R+ R- T+ T- R+ R-

2
PV1+ 1
PV1+ PV1- PV1- PV2+ PV2+ PV2- PV2- 3 2 1 2
PV1+ PV1+ PV1- PV1- PV2+ PV2+ PV2- PV2- 3 2 1

1 inch 1 inch

SR3-10TLA-US-IG_10_EN0714
28
3800TLA-US / 5000TLA-US / 6000TLA-US /
+ 7000TLA-US / 8000TLA-US / 9000TLA-US / +
- 10000TLA-US -

+ PV1+ + PV1+ 3000TLA-US


- PV1 - - PV1 -

+ PV2+ PV2+
- PV2 - PV2 -

+
-

Number of Number of
Strings Strings

PV2 +
SolarRiver PV1 PV2

PV1 +

PV2 +
PV1 +
SolarRiver PV1 PV2

PV2 +
PV1 +

PV2 +
PV1 +

PV1 -

PV2 -
PV1 -

PV2 -
PV1 -

PV2 -
PV1 -

PV2 -
3000TLA-US 2 - 3000TLA-US 2 -
3800TLA-US 2 2 3800TLA-US 2 2
5000TLA-US 2 2 5000TLA-US 2 2
6000TLA-US 2 2 6000TLA-US 2 2
7000TLA-US 2 3 7000TLA-US 2 3
8000TLA-US 2 3 8000TLA-US 2 3
9000TLA-US 2 3 9000TLA-US 2 3
10000TLA-US 2 3 10000TLA-US 2 3

T+ T- R+ R-
T+ T- R+ R-

2
PV1+ PV1+ PV1- PV1- PV2+ PV2+ PV2- PV2- 3 2 1
2
PV1+ PV1+ PV1- PV1- PV2+ PV2+ PV2- PV2- 3 2 1

1 inch 1 inch

SR3-10TLA-US-IG_10_EN0714
29
3800TLA-US / 5000TLA-US / 6000TLA-US / DC Connection: Parallel Connected Strings EN
7000TLA-US / 8000TLA-US / 9000TLA-US /
10000TLA-US
It is possible to connect the strings in &RQ¿JXUDWLRQRIWKHLQYHUWHU
parallel as shown in the illustration. when strings are connected
in parallel: Go to “Settings” / ”MPPT
+ PV1+ :$51,1*5LVNRI¿UHReverse Input” and set value to “1” for optimum
- PV1 - currents in the PV-strings can result in operation.
currents that exceed the PV-module
capacity.
Î Install diodes in order to prevent
+ PV2+ dangerous reverse currents.
- PV2 - Î Observe NEC 690.9: Install series
fuse when necessary.

Number of
Strings
SolarRiver PV1 PV2

PV2 +
PV1 +

PV2 +
PV1 +
PV1 -

PV2 -
PV1 -

PV2 -
3000TLA-US 2 -
3800TLA-US 2 2
5000TLA-US 2 2
6000TLA-US 2 2
7000TLA-US 2 3
8000TLA-US 2 3
9000TLA-US 2 3
10000TLA-US 2 3

T+ T- R+ R-

2
PV1+ PV1+ PV1- PV1- PV2+ PV2+ PV2- PV2- 3 2 1

1 inch

SR3-10TLA-US-IG_10_EN0714
30
3800TLA-US / 5000TLA-US / 6000TLA-US / DC Connection: Using only one DC-Port
7000TLA-US / 8000TLA-US / 9000TLA-US / It is possible to only use one DC port
10000TLA-US as shown in the illustration.

+ PV1+ Connect PV2+ and PV2- as shown in


the illustration.
- PV1 -

PV2+
PV2 -

Number of
Strings

PV2 +
SolarRiver PV1 PV2

PV1 +

PV2 +
PV1 +
PV1 -

PV2 -
PV1 -

PV2 -
3000TLA-US 2 -
3800TLA-US 2 2
5000TLA-US 2 2
6000TLA-US 2 2
7000TLA-US 2 3
8000TLA-US 2 3
9000TLA-US 2 3
10000TLA-US 2 3

T+ T- R+ R-

2
PV1+ PV1+ PV1- PV1- PV2+ PV2+ PV2- PV2- 3 2 1

1 inch

SR3-10TLA-US-IG_10_EN0714
31
Starting the Inverter EN
WARNING! Risk of electric shock! Proceed as follows:
Î Make sure the inverter is properly 1. Activate AC-power.
connected. 2. Activate DC-power
Î Make sure the inverter is properly The inverter performs self-tests,
ON closed. checks AC-grid and starts operation.
See next page for details.

1
AC

ON
2

DC

SR3-10TLA-US-IG_10_EN0714
32
Commissioning EN
When the inverter is activated for the
¿UVWWLPHLWQHHGWREHFRPPLVVLRQHG
Press “OK” several times. Select
“Settings”.
1. Specify the AC grid type: 208, 240,
277 V
2. 6SHFL¿\0337,QSXWRU
GFCI

Alarm/Fault

Normal

ESC OK
WIFI

3. Specify AFCI mode. The default


setting is “enabled”. Note:
Changing the settings of the AFCI
AC ON is password protected.
DC ON

Welcome to use
SolarRiver-US
OK

Waiting ..
Waiting Sun
OK

Running
Settings ->
OK

Grid Mode: Auto 1


MPPT Input: 2 2

AFCI Disable 3

OK

PassWord
****
AFCI Enable

SR3-10TLA-US-IG_10_EN0714
33
$GGLWLRQDO,QYHUWHU&RQ¿JXUDWLRQ EN
2 Use the SamilPower SolarPower SolarPower Browser can be
%URZVHUIRUFRQ¿JXUDWLRQ used for adjusting the inverter
In general the inverters are connected parameters.
to a PC (3) with ethernet (1). A router
(2) can be used in order to connect SolarPower Browser is available for
several inverters. download at:
www.samilpower.com
$Q\PRGL¿FDWLRQPD\RQO\EH
done in compliance with the utility
1 operator!
3

SR3-10TLA-US-IG_10_EN0714
34
1 2 Opening the Inverter EN
AC Proceed as follows: 4. Disconnect DC-power.
1. WARNING! Risk of electric 5. WARNING! Danger of electric
shock! Both DC and AC voltage is shock!
terminated inside the inverter. Î Wait for 5 minutes in order to
Î Disconnect DC and AC voltage let internal voltages discharge
before servicing. 6. Remove screws on the bottom lid.
DC 2. CAUTION! risk of damaging the 7. Remove lid.
inverter with water inside the 8. CAUTION! Risk of damaging the
enclosure. Ensure that no water inverter! Protect the inverter from
will enter when the inverter is electrostatic discharge.
open.
3. Disconnect AC-power.

4
3
AC DC

5 min.

7
6

SR3-10TLA-US-IG_10_EN0714
35
208 V AC - 3-Phase Delta
Examples of Wiring Diagrams EN
240 V AC - Splitphase 1. Utility All electrical installations
2. Ground must be done in accordance with the
3. Neutral local codes and with the National
4. AC-distribution panel Electrical Code®, ANSI/NFPA 70.
PV1- PV2- 1 5. Earth ground See national National Electrical
PV1+ PV2+
6. AC-disconnect Code® section 690-64(b)(2).
7. Note: Solar River 3000TLA-US Overcurrent protection for the AC
PE PE has only PV1 DC connection. output circuit must be provided in
2 the electrical installation refer to the
4 National Electrical Code®, ANSI/
7 6 NFPA 70.
3

PE
L1
L2
N
5

277 V - 3-Phase Y

PV1- PV2- 1
PV1+ PV2+

PE PE
2
4
6
3
7
PE
L1
N

SR3-10TLA-US-IG_10_EN0714
36
Wire Sizes and Torques EN
Use the following wire sizes and torques:
AC DC PE
SolarRiver Size Torque Size [AWG] Torque Size [AWG] Torque
[AWG] [Nm/in-bs] [Nm/in-bs] [Nm/in-bs]
3000TLA-US 6-10 1.69/15 8-10 1.69/15 6-10 5.08/45
AC 3800TLA-US 6-10 1.69/15 8-10 1.69/15 6-10 5.08/45
5000TLA-US 6-8 1.69/15 8-10 1.69/15 6-8 5.08/45
6000TLA-US 6-8 1.69/15 8-10 1.69/15 6-8 5.08/45
7000TLA-US 4-6 1.69/15 8-10 1.69/15 4-6 5.08/45
8000TLA-US 4-6 1.69/15 8-10 1.69/15 4-6 5.08/45
9000TLA-US 4-6 1.69/15 8-10 1.69/15 4-6 5.08/45
10000TLA-US 4-6 1.69/15 8-10 1.69/15 4-6 5.08/45

T+ T- R+ R-
AC / DC / PE
PV1+ PV1+ PV1- PV1- PV2+ PV2+ PV2- PV2- 3 2 1

> +90 °C / 200 °F

PE

DC

SR3-10TLA-US-IG_10_EN0714
37
Display: “Statistics” / “Information” EN
Statistics Information
1. T-day, E-day, T-mon, E-mon, 2. V1in / I1in, V2in / I2in: Voltage
T-tot: Total operating hours and and current of respective DC-
energy yield in current day, month ports
and total. Pin1 / Pin2: DC power of
GFCI

Alarm/Fault
respective input ports
3. Vgrid/ Igrid: AC voltage and AC
Normal

ESC OK
WIFI

current
4. Pout / Fgrid: AC-power and AC-
frequency
5. GFCI: Ground fault current

RUNNING «… OK
INFORMATION «… OK
V1in=
V1in=
SETTINGS 2
STATISTICS V2in=
V2in=

RUNNING INFORMATION Pin1=


Pin1= 3
SETTINGS «… STATISTICS «… Pin2=
Pin2=

OK

Password T-day: Vgrid= 4


0000 E-Day: Igrid=

OK OK

T-mon: 1 Pout = 5
E-mon: Fgrid =

See page 39 for


“Settings” menu.

T-tot:
E-tot: GFCI = 6

SR3-10TLA-US-IG_10_EN0714
38
Display: “Settings” Menu EN
1. AC grid type: 240V, 208V, 277V 8. Enabling and disabling
or Auto AFCI / Resetting ACFI faults
2. Number of MPP ports: 1 or 2 9. AFCI self test
RUNNING 3. Grid voltage protection time 10. Date / Time
SETTINGS «… 4. Grid voltage trip point
GFCI
5. 7À*ULGIUHTXHQF\SURWHFWWLPH Note: The default password is
VSHFL¿HGRQSDJH
Alarm/Fault

Fl: Low frequency


Normal

ESC OK
WIFI

6. Restarting and resetting


password
7. Ethernet settings (top: IP adress,
bottom: Gateway) - Note: Subnet
PDVNLV¿[HGWR
GridMode: 240V«… 1
Password MPPT Input: 1 2
0000
Tvh1:0000ms
Tvl1:0000ms
3
Tvh2:0000ms
OK OK Tvl2:0000ms

Vhtp: 1:000%
Vltp: 1:000%
4
Vhtp: 1:000%
Vltp: 1:000%
Incorrect! Tfl: 100.00 s
Input again! 5
Fl: 059.0 Hz

Restart 6
New password

192.168.001.002
7
192.168.001.002

AFCI Enable 8
AFCI Clean

AFCI Self Check 9

Date: 31-12-2000
10
Time: 00:00:00

SR3-10TLA-US-IG_10_EN0714
39
Derating Function EN
< 45 °C / 114 °F 45 °C / 114 °F 60 °C / 140 °F 1. The inverter operates at full When temperature derating
possible power when the internal occurs often: Check ambient
1 2 3 inverter temperature is below conditions. Check fan.
45 °C (+113 °F).
GFCI

Alarm/Fault

Normal
GFCI

Alarm/Fault

Normal
GFCI

Alarm/Fault

Normal
2. The inverter reduces the output 4. The inverter operates according
power proportionally between 45 to voltage dependant derating
ESC OK ESC OK ESC OK
WIFI WIFI WIFI

°C (113 °F) and 60 °C (140 °F). characteristics: See graph.


3. The inverter stops operation
when the internal temperature is
above 60 °C (140 °F).
100
Pn [%]
10

45/114 60/140
T [ °C / °F ]
100

4
Pn [%]
50 20

100 200 500 550


UDC [V]

SR3-10TLA-US-IG_10_EN0714
40
Communication Ports: General EN
3 1. The inverter is equipped with with VI-Plant. Note: The
ethernet communication. IP-adress and gateway can be
2. The inverter is equipped with WiFi FRQ¿JXUHGLQWKH³6HWWLQJV´PHQX
communication. of the inverter.
3. Inverters connected with ethernet 5. The inverter is equipped with
or WiFi can be monitored and RS485 communication for the
1 FRQ¿JXUHGZLWK6RODU3RZHU connection to a data logger.
Browser. The connection of RS485 and
4. The Ethernet and WiFi Ethernet is described on the
communication can be used in following pages.
3 order to connect the inverters
to the internet for monitoring

Smartphone
3
4 VI-Plant

PC

Data Logger

SR3-10TLA-US-IG_10_EN0714
41
Ethernet: Connection EN
1. Put cable through enclosure
opening.
2. Connect cable to plug.
3. Plug cable into socket.

2 RJ45

LiYCY ≥ 0.14 mm2


CAT 5 / 7 SSTP
T+ T- R+ R-

PV1+ PV1+ PV1- PV1- PV2+ PV2+ PV2- PV2- 3 2 1

T+ T- R+ R-

PV1+ PV1+ PV1- PV1- PV2+ PV2+ PV2- PV2- 3 2 1

SR3-10TLA-US-IG_10_EN0714
42
RJ45 2
RS485: Connection EN
4 Connection with RJ45 plugs Connection with Terminals
LiYCY ≥ 0.14 mm2 1. Put cables through enclosure 1. Put cables through enclosure
CAT 5 / 7 SSTP openings. openings.
2. Connect cables to plugs. Use 2. Connect cables to terminals. Use
identical pins between inverters. identical pins between inverters.
T+ T- R+ R-
T+ T- R+ R-
3. Plug cables into sockets 3. Attach magnetic brackets (only
PV1+ PV1+ PV1- PV1- PV2+ PV2+ PV2- PV2- 3 2 1
PV1+ PV1+ PV1- PV1- PV2+ PV2+ PV2- PV2- 3 2 1

4. Attach magnetic brackets (only SR3000TLA-US - 6000TLA-US)


1 1 SR3000TLA-US - 6000TLA-US) 4. Connect to datalogger according
5. Connect to datalogger according to documentation of the
to documentation of the datalogger.
datalogger.
3 Data Logger

5
1 (Tx+)
RS485A
T+ T- R+ R-

PV1+ PV1+ PV1- PV1- PV2+ PV2+ PV2- PV2- 3 2 1

2 (Tx-)
1 3 (Rx+)
RS485B
6 (Rx-)

3
LiYCY ≥ 0.14 mm2
CAT 5 / 7 SSTP

T+ T- R+ R-

T+ T- R+ R-

PV1+ PV1+ PV1- PV1- PV2+ PV2+ PV2- PV2- 3 2 1


PV1+ PV1+ PV1- PV1- PV2+ PV2+ PV2- PV2- 3 2 1

1 1

2
Data Logger

4
1 (Tx+)
T+ T- R+ R-

RS485A
PV1+ PV1+ PV1- PV1- PV2+ PV2+ PV2- PV2- 3 2 1
2 (Tx-)
3 (Rx+)
1 6 (Rx-) RS485B

SR3-10TLA-US-IG_10_EN0714
43
EN

Messages on GFCI

Display
Alarm/Fault

Normal

ESC OK
WIFI

Display Messages
Event Code Message Description Suggested Solutions
1 ac-voltage-oor AC-voltage is out of range ‡ &KHFNZKHWKHU$&JULG YROWDJHDQGIUHTXHQF\ LVEH\RQGWKHVSHFL¿FDWLRQ
2 ac-freq-oor AC-frequency is out of range ‡ Check whether the connection of AC-side is correct.
3 PV1- voltage-oor PV1 voltage out of range ‡ &KHFNRXWSXWYROWDJHRI39DUUD\&KHFNLIYROWDJHDQGFXUUHQWLVLQVSHFL¿HG
4 PV2- voltage-oor PV2 voltage out of range range.
‡ Check insulation of PV-cable.
5 PV1 Over current PV1 current out of range ‡ Check overall installation for proper connection according to manual.
6 PV2 Over current PV2 current out of range ‡ If the failure consists, contact your supplier.
‡ Check fan function.
High temperature detected inside
7 Over Temperature enclosure ‡ Check fan for dust and dirt.
‡ Check ambient conditions.
8 Grid Gone No voltage detected ‡ Check AC-side connection.
Grid type (208 V, 240 V, 277 V) ‡ Specify correct grid type in “Settings” menu.
9 Unknown grid could not be detected
10 Fan Loss Fan abnormity ‡ Check the fan. If the fan is not rotating, contact your supplier.
11 Comm Loss Communication abnormity ‡ Contact your supplier when this failure persists, when the inverter is
12 EEPROM Loss Internal failure rebooted.
‡ &KHFNLIRXWSXWYROWDJHRI39DUUD\LVLQVSHFL¿HGUDQJH
‡ Check insulation of PV-cable.
13 ISO Loss Isolation measurement failure
‡ Check overall installation for proper connection according to manual.
‡ Reboot inverter. Contact your supplier when this failure persists.

SR3-10TLA-US-IG_10_EN0714
44
EN

Messages on GFCI

Display
Alarm/Fault

Normal

ESC OK
WIFI

Display Messages
Event Code Message Description Suggested Solutions
Ouptput power is exceeding ‡ Check installation
14 Over Load
VSHFL¿HGYDOXH ‡ Check if PV-power is too high
‡ Check whether the output voltage of PV array is in the allowable range.
‡ Check whether the insulation of PV cable is good.
15 DC Reverse
‡ Inspect whether the installation is correct according to the manual.
‡ Reboot inverter. Contact your supplier when this failure persists.
Power from PV1 is low for 3 ‡ Check the DC-side and the connection.
16 PV1 Always Low hours, while PV2 is operating
normally.
Power from PV2 is low for 3
17 PV2 Always Low hours, while PV1 is operating
normally.
18 Startup
19 Shutdown
20 Fan1 Loss Malfunction of Fan 1 detected ‡ Check the fan 1. If the fan is not turning, contact your supplier.
21 Fan2 Loss Malfunction of Fan 2 detected ‡ Check the fan 2. If the fan is not turning, contact your supplier.
24 AFCI Hard Fault AFCI detecting module fault ‡ Reboot inverter. Contact your supplier when this failure persists.
An arc was detected on the DC ‡ Check the reason for the AFCI fault. See page 44.
25 AFCI Fault
side

SR3-10TLA-US-IG_10_EN0714
45
Arc-Fault Circuit Interrupter EN
The inverter is equipped with an The inverter presents the
integrated Arc-Fault Circuit Interrupter following message on the display:
(AFCI):
AFCI 1. The AFCI detects electric arcs in “AFCI Fault”
the DC circuit.
1 2. The AFCI disconnects the DC The procedure for manual reset of
circuit. an AFCI fault is described on the
3. The inverter must be manually following page.
2 reset in order to resume
operation.

AC

RUNNING
SETTINGS «…
GFCI

Alarm/Fault

Normal

ESC OK
WIFI

AFCI

START

AC

SR3-10TLA-US-IG_10_EN0714
46
Reset of “AFCI Fault” EN
1. :$51,1*5LVNRI¿UH 6. Enter password. Note:
1 Î Before resetting the arc fault 7KHGHIDXOWSDVVZRUGLVVSHFL¿HG
in the inverter: Remove the on page 15.
cause of the arc fault. 7. Turn DC switch off. Wait 3
2. Press “OK” minutes.Turn DC switch on.
3. Press “OK” for “Settings”. 8. The inverter can now resume
AC 4. Press “Move Down” key until you normal operation.
reach “AFCI Clean”
5. Press “OK”

GFCI

2 ESC OK
Alarm/Fault

Normal

WIFI

3 Password
Running
Settings -> ****
6
7
OK ON
OFF

OK OK

3 min.
4

8
Warning
AFCI Enable AFCI Clean OK
AFCI Clean -> OK Incorrect!
5 Input again!

SR3-10TLA-US-IG_10_EN0714
47
Periodic Inspection EN
1 It is reccomended to conduct
the following inspections of the
inverter:
1. DC switch: Turn on and off
several times once a month.
2. AFCI: Initiate self test once a
month.

GFCI

Alarm/Fault

Normal

ESC OK
WIFI

Running
Settings ->

AFCI SelfCheck->

OK
AFCI HardError

PassWord
****
Warning
AFCI Clean OK
OK

SR3-10TLA-US-IG_10_EN0714
48
EN

Fault GFCI

Messages
Alarm/Fault

Normal

ESC OK
WIFI

Fault Messages
Fault Code Message Description
1 Relay Fault Relay abnormity
2 DCI Fault DCI over limit
3 Short Circuit Output Short Circuit
4 Output OCP Output Overcurrent
5 GFCI Hard Fault Internal fault
6 Bus OVP Internal fault
7 GFCI 300mA Ground leakage over 300mA
8 GFCI 30mA Ground leakage jump 30mA
9 GFCI 60mA Ground leakage jump 60mA
10 GFCI 150mA Ground leakage jump 150mA
11 Comm Loss communication abnormity
12 EEPROM Loss Internal fault
13 ISO Loss Isolation measurement failure

SR3-10TLA-US-IG_10_EN0714
49
EN Technical Data
99 %

SolarRiver 6000TLA-US
400 V
97 %
(I¿FLHQF\

500 V
95 %

200 V
93%
91%

0 0,2 0,4 0,6 0,8 1


3RZHU1RPLQDO3RZHU
SolarRiver SolarRiver SolarRiver SolarRiver
3000TLA-US 3800TLA-US 5000TLA-US 6000TLA-US
Input (DC)
0D['&SRZHU #FRVij  WRWDOSHU033LQSXW :: :: :: ::
0D[LQSXWYROWDJH 9
033YROWDJHUDQJHUDWHGLQSXWYROWDJH 999
0LQLQSXWYROWDJHLQLWLDOLQSXWYROWDJH 99
0D[LQSXWFXUUHQWLQSXW$LQSXW% $ $$ $$ $$
0D[LQSXWFXUUHQWSHUVWULQJLQSXW$LQSXW% $ $$ $$ $$
0D[LQSXWVKRUWFLUFXLWFXUUHQW $ $$ $$ $$
0D[XWLOLW\EDFNIHHGFXUUHQWWR39DUUD\ $ $ $ $
1XPEHURILQGHSHQGHQW033LQSXWVVWULQJVSHU033LQSXW  
Output (AC)
5DWHGSRZHU #9+] : : : :
0D[DSSDUHQW$&SRZHU 9$ 9$ 9$ 9$
1RPLQDO$&YROWDJHUDQJH 99 W\SLFDO 99 W\SLFDO
999
999 999
$&IUHTXHQF\UDQJH +]+]+]

50
9+] 9+]
5DWHGJULGYROWDJHUDWHGJULGIUHTXHQF\ 9+]
9+]
9+]
$#9 $#9 $#9 $#9
0D[RXWSXWFXUUHQW $#9 $#9 $#9
$#9
$#9
0D[RXWSXWIDXOWFXUUHQW $ $ $ $
0D[RXWSXWRYHUFXUUHQWSURWHFWLRQ $ $ $ $

SR3-10TLA-US-IG_10_EN0714
7ULSOLPLWDFFXUDF\ ”“
7ULSWLPH ”PV
3RZHUIDFWRUDWUDWHGSRZHU 
'LVSODFHPHQWSRZHUIDFWRUDGMXVWDEOH -
)HHGLQSKDVHVFRQQHFWLRQSKDVHV 
(I¿FLHQF\
#9   #9
0D[HI¿FLHQF\&(&ZHLJKWHGHI¿FLHQF\>@ #9 #99 #99 #99
3URWHFWLYHGHYLFHV
'&GLVFRQQHFWGHYLFH$&GLVFRQQHFWGHYLFH Ɣ
*URXQGIDXOWPRQLWRULQJJULGPRQLWRULQJ ƔƔ
'&UHYHUVHSRODULW\SURWHFWLRQ$&VKRUWFLUFXLWFXUUHQWFDSDELOLW\ ƔƔ
*DOYDQLFLVRODWLRQ -
$OOSROHVHQVLWLYHUHVLGXDOFXUUHQWPRQLWRULQJXQLW Ɣ
3URWHFWLRQFODVV DFFRUGLQJWR,(& RYHUYROWDJHFDWHJRU\ ,,, '& ,,, $&
DFFRUGLQJWR,(&
*HQHUDOGDWD
'LPHQVLRQV :+' PP LQ
:HLJKW NJ OE NJ OE NJ OE NJ OE
2SHUDWLQJWHPSHUDWXUHUDQJH ƒ& ƒ)  SRZHUGHUDWLQJ!ƒ&ƒ)
1RLVHHPLVVLRQ W\SLFDO G% G% G%
6HOIFRQVXPSWLRQ QLJKW :
7RSRORJ\ 7UDQVIRUPHUOHVV
&RROLQJFRQFHSW &RQYHFWLRQ )DQ
'HJUHHRISURWHFWLRQ1(0$ ,&6 ,3 ,(& 1(0$5,3
0D[LPXPSHUPLVVLEOHYDOXHIRUUHODWLYHKXPLGLW\ QRQFRQGHQVLQJ 
)HDWXUHV
'&FRQQHFWLRQ$&FRQQHFWLRQ 6FUHZWHUPLQDO6FUHZWHUPLQDO
'LVSOD\ OLQH/&'
,QWHUIDFH56:L)L(WKHUQHW ƔƔƔ
0XOWLIXQFWLRQUHOD\GLJLWDOLQSXW 
*XDUDQWHH\HDUV Ɣżżż
&HUWL¿FDWHVDQGDSSURYDOV DGGLWLRQDORQUHTXHVW 8/,((()&&3DUW &ODVV$ % &6$&1R
Ɣ6WDQGDUGIHDWXUHVż2SWLRQDOIHDWXUHV²1RWDYDLODEOH 7HFKQLFDOFKDQJHVUHVHUYHG
EN Technical Data

SolarRiver 10000TLA-US

99 %
400 V

97 %
300 V
500 V

95 %

(I¿FLHQF\
93%
91%
0 0,2 0,4 0,6 0,8 1
3RZHU1RPLQDO3RZHU

SolarRiver SolarRiver SolarRiver SolarRiver


7000TLA-US 8000TLA-US 9000TLA-US 10000TLA-US
Input (DC)
0D['&SRZHU #FRVij  WRWDOSHU033LQSXW :: :: :: ::
0D[LQSXWYROWDJH 9
033YROWDJHUDQJHUDWHGLQSXWYROWDJH 999 999
0LQLQSXWYROWDJHLQLWLDOLQSXWYROWDJH 99
0D[LQSXWFXUUHQWLQSXW$LQSXW% $$ $$ $$ $$
0D[LQSXWFXUUHQWSHUVWULQJLQSXW$LQSXW% $$
0D[LQSXWVKRUWFLUFXLWFXUUHQW $$ $$ $$ $$
0D[XWLOLW\EDFNIHHGFXUUHQWWR39DUUD\ $ $ $ $
1XPEHURILQGHSHQGHQW033LQSXWVVWULQJVSHU033LQSXW 
Output (AC)
5DWHGSRZHU #9+] : : : :
0D[DSSDUHQW$&SRZHU 9$ 9$ 9$ 9$

SR3-10TLA-US-IG_10_EN0714
99 W\SLFDO
1RPLQDO$&YROWDJHUDQJH 999
999
$&IUHTXHQF\UDQJH +]+]+]
5DWHGJULGYROWDJHUDWHGJULGIUHTXHQF\ 9+]9+]9+]
$#9 $#9 $#9 $#9

51
0D[RXWSXWFXUUHQW $#9 $#9 $#9 $#9
$#9 $#9 $#9 $#9
0D[RXWSXWIDXOWFXUUHQW $ $ $ $
0D[RXWSXWRYHUFXUUHQWSURWHFWLRQ $ $ $ $
7ULSOLPLWDFFXUDF\ ”“
7ULSWLPH ”PV
3RZHUIDFWRUDWUDWHGSRZHU 
'LVSODFHPHQWSRZHUIDFWRUDGMXVWDEOH -
)HHGLQSKDVHVFRQQHFWLRQSKDVHV 
(I¿FLHQF\
#99 #9
0D[HI¿FLHQF\&(&ZHLJKWHGHI¿FLHQF\ #9 #99
3URWHFWLYHGHYLFHV
'&GLVFRQQHFWGHYLFH$&GLVFRQQHFWGHYLFH Ɣ
*URXQGIDXOWPRQLWRULQJJULGPRQLWRULQJ ƔƔ
'&UHYHUVHSRODULW\SURWHFWLRQ$&VKRUWFLUFXLWFXUUHQWFDSDELOLW\ ƔƔ
*DOYDQLFLVRODWLRQ -
$OOSROHVHQVLWLYHUHVLGXDOFXUUHQWPRQLWRULQJXQLW Ɣ
3URWHFWLRQFODVV DFFRUGLQJWR,(& RYHUYROWDJHFDWHJRU\
DFFRUGLQJWR,(& ,,, '& ,,, $&
*HQHUDOGDWD
'LPHQVLRQV :+' PP LQ
:HLJKW NJ OE NJ OE
2SHUDWLQJWHPSHUDWXUHUDQJH ƒ& ƒ)  SRZHUGHUDWLQJ!ƒ&ƒ)
1RLVHHPLVVLRQ W\SLFDO G% G%
6HOIFRQVXPSWLRQ QLJKW :
7RSRORJ\ 7UDQVIRUPHUOHVV
&RROLQJFRQFHSW )DQ
'HJUHHRISURWHFWLRQ1(0$ ,&6 ,3 ,(& 1(0$5,3
0D[LPXPSHUPLVVLEOHYDOXHIRUUHODWLYHKXPLGLW\ QRQFRQGHQVLQJ 
)HDWXUHV
'&FRQQHFWLRQ$&FRQQHFWLRQ 6FUHZWHUPLQDO6FUHZWHUPLQDO
'LVSOD\ OLQH/&'
,QWHUIDFH56:L)L(WKHUQHW ƔƔƔ
0XOWLIXQFWLRQUHOD\GLJLWDOLQSXW 
*XDUDQWHH\HDUV Ɣżżż
&HUWL¿FDWHVDQGDSSURYDOV DGGLWLRQDORQUHTXHVW 8/,((()&&3DUW &ODVV$ % &6$&1R
Ɣ6WDQGDUGIHDWXUHVż2SWLRQDOIHDWXUHV²1RWDYDLODEOH 7HFKQLFDOFKDQJHVUHVHUYHG
FCC compliance information
Samil Power photovoltaic grid-connected NOTE: This equipment has been tested and found 7KHXVHULVFDXWLRQHGWKDWFKDQJHVRUPRGL¿FDWLRQV
SolarRiver-US inverter complies with part 15 of the to comply with the limits for a Class A & B digital not expressly approved by SamilPower could void
FCC rules. Operation is subject to the following device, pursuant to Part 15 of the FCC rules. These the user’s authority to operate this equipment.
conditions. limits are designed to provide reasonable protection
against harmful interference in a residential
1. This device may not cause harmful interference. installation. This equipment must be installed
2. This device must accept any interference and used in accordance with the instructions,
received, including interface that may cause or it may cause harmful interference to radio
undesired operation. communications. However, there is no guarantee
that interference will not occur in a particular
installation. If this equipment does cause harmful
interference to radio or television reception, which
can be determined by turning the equipment off
and on, the user is encouraged to try to correct
the interference by one or more of the following
measures:

‡ Reorient or relocate the receiving antenna.


‡ Increase the separation between the equipment
and the inverter.
‡ Connect the equipment into an outlet on a
circuit different from that to which the receiver is
connected.
‡ Consult the dealer or an experienced radio/TV
technician for help.

SR3-10TLA-US-IG_10_EN0714
52
One-Stop Shopping
Samil Power Product Portfolio

SolarPond - US SolarRiver - US
240 W 3 - 10 kW

SolarLake - US Accessories
15 - 30 kW

SolarWatcher 100 Array Combiner Boxes

SR3-10TLA-US-IG_10_EN0714
53
www.SAMILPOWER.com

You might also like