KAR COMPANY

FOR GENERAL CONTRACTION, ENGINEERING


CONSULTANCY AND ELECTRICAL MECHANICAL
CONTRACTING LT

KDN-16 (K-442)
FINAL WELL REPORT
FINAL WELL REPORT KDN-16 (K-442)

APPROVED BY :

FIELDS DIVISION GENERAL DIRECTOR


BARZAN I. AHMED

CHECKED & APPROVED BY :

GEOLOGY DEPARTMENT MANAGER

AKRAM MAQSOUD RANJDAR AHMED

DRILLING ENGINEERING DEPARTMENT MANAGER

SABIR KAK SOR HEMIN ANWER

FORMATION EVALUATION DEPARTMENT MANAGER

SAWASH SIDDEQ

PETROLEUM ENGINEERING DEPARTMENT MANAGER

FARHAD ABDULRAHAMN

HSE DEPARTMENT MANAGER

JALAL AMIN
Table of Contents
Table of Contents ........................................................................................................... I
List of Figures ............................................................................................................. IV
List of Tables ................................................................................................................. V
1. Introduction ............................................................................................................... 1
1.1. Well Summary......................................................................................................................... 2
1.2. Well Location .......................................................................................................................... 3
1.3. General Well Data ................................................................................................................... 4
2. Geology Information Part ......................................................................................... 5
2.1. The Field Structure .................................................................................................................. 5
2.2. Formation Tops and Markers .................................................................................................. 7
2.3. Stratigraphy ............................................................................................................................. 8
2.3.1. Stratigraphy of Tertiary.................................................................................................... 8
2.4. Lithology Description ........................................................................................................... 10
2.5. Sample Manifest .................................................................................................................... 15
2.6. Well Tops Correlation ........................................................................................................... 17
2.7. Underground Condition......................................................................................................... 18
2.7.1. Oil Shows ....................................................................................................................... 18
2.7.2. Gas Shows ...................................................................................................................... 18
2.7.3. Core Sample ................................................................................................................... 19
2.8. Master Log ............................................................................................................................ 19
3. Drilling Information ............................................................................................... 20
3.1. Drilling Operation Summary:................................................................................................ 20
3.1.1. First hole 17 1/2" hole interval (000-410m RTKB) ....................................................... 20
3.1.2. Second hole 12 1/4" hole interval (410-887 m RTKB) ................................................. 20
3.1.3. Third hole 8 1/2" hole interval (887-1089 m RTKB) ...................................................... 20
3.2. Hole Problems and their remedies: ....................................................................................... 22
3.2.1. First hole 17 1/2’’ (000 m-410 m RTKB) ...................................................................... 22
3.2.2. Second hole 12 1/4" hole interval (410-887 m RTKB) ................................................. 22
3.2.3. Third hole 8 1/2" hole interval (887-1089 m RTKB) .................................................... 22
3.3. Drilling fluid Program: .......................................................................................................... 23
3.4. Mud losses & treatment: ....................................................................................................... 24
3.5. BHA Data: ............................................................................................................................. 25
3.5.1. BHA for hole size: 17 ½" (First Hole): ......................................................................... 25
3.5.2. BHA for hole size: 12 ¼" (Second Hole): ..................................................................... 25
3.5.3. BHA for hole size: 8 1/2" (Third Hole): ......................................................................... 26

I
3.6. Casing Data: .......................................................................................................................... 26
3.7. Casing and cementing jobs data: ........................................................................................... 27
3.8. Cement plug jobs:.................................................................................................................. 28
3.9. Casing Pressure Test: ............................................................................................................ 28
3.10. Bit Record: ......................................................................................................................... 29
3.11. Well Deviation Record: ..................................................................................................... 30
3.12. Wellhead and BOP’s Pressure Test: .................................................................................. 31
3.13. Drilling Progress Curve: .................................................................................................... 32
3.14. Drilling and Well Completion Time Analyses: ................................................................. 33
3.15. Wellhead and x-mass tree assembly Data: ........................................................................ 38
4. Formation Evaluation............................................................................................. 39
4.1. Introduction ........................................................................................................................... 39
4.2. Abbreviations of Wireline Logging Tools ............................................................................ 39
4.3. Wireline Logging Runs Summary......................................................................................... 39
4.3.1. Open Hole Section 12.25 IN .......................................................................................... 39
4.3.2. Casing Section 9.625 IN ................................................................................................ 40
4.3.3. Open Hole Section 8.5 IN .............................................................................................. 40
4.3.4. Casing Section 7 IN ....................................................................................................... 40
4.3.5. Casing Section 7 IN (Perforation Operation)................................................................. 40
4.4. Open Hole Logging Results and Discussion ......................................................................... 41
4.4.1. 1st Section 12.25" Openhole (Lower Fars):- ................................................................. 41
4.4.2. 2nd Section 8.5" Open hole (Tertiary Reservoir):- ........................................................ 41
4.5. Hydrocarbon / Fluid Contacts Indication .............................................................................. 41
4.6. Well Correlation/Log Data .................................................................................................... 42
4.7. Formation Evaluation ............................................................................................................ 45
4.8. Cement Bond Log Evaluation ............................................................................................... 45
4.8.1. Cased Hole 9.625 IN ...................................................................................................... 45
4.8.2. Cased Hole 7.0 IN .......................................................................................................... 45
5. Petroleum Engineering ........................................................................................... 46
5.1. Final Well Sketch .................................................................................................................. 46
5.2. Well Completion Diagram .................................................................................................... 47
5.3. Well Flowing Events ............................................................................................................. 48
5.4. Wellhead and XMT Diagram ................................................................................................ 50
5.5. Acidizing ............................................................................................................................... 51
5.6. Field Measurements .............................................................................................................. 52
5.7. Surface Well Testing Summary ............................................................................................ 53
6. Healthy Safety & environment ............................................................................... 54
II
6.1. About our duties: ................................................................................................................... 54
6.2. HSE equipment at well location: ........................................................................................... 54
6.3. Observation and Cases: ......................................................................................................... 55
6.4. Hygiene and environmental health:....................................................................................... 55
6.5. Confined spaces: ................................................................................................................... 55
6.6. Hazardous jobs: ..................................................................................................................... 56
6.7. Hazardous incidents: ............................................................................................................. 56
6.8. Safety drills and inductions: .................................................................................................. 56
7. Appendixes............................................................................................................... 57
7.1. Appendix P ............................................................................................................................ 57
7.1.1. 13.375 IN Casing tally ................................................................................................... 57
7.1.2. 9.625 IN Casing tally ..................................................................................................... 58
7.1.3. 7.0 IN Casing tally ......................................................................................................... 60
7.1.4. 4 1/2 IN Tubing tally...................................................................................................... 62
7.2. Appendix F ............................................................................................................................ 65
7.2.1. CPI for OH 8.5 IN .......................................................................................................... 65
7.3. Appendix G ........................................................................................................................... 66
7.3.1. Master Log ..................................................................................................................... 66

III
List of Figures
Figure 1-1: Illustrate Structural contour map of Avanah Dense ............................................................ 3

Figure 2-1: Illustrate location map and cross section ............................................................................ 6

Figure 3-1: Illustrate Drilling progress curve ...................................................................................... 32


Figure 3-2: Illustrate productive time .................................................................................................. 35
Figure 3-3: Illustrate nonproductive time ............................................................................................ 36
Figure 3-4: Illustrate total time ............................................................................................................ 37

Figure 4- 1: Shows the location of well on the top of Avanah Dense formation Map ........................ 42
Figure 4- 2: Shows the vertical and horizontal cross section............................................................... 43
Figure 4- 3: Shows the horizontal correlation between wells (K-224, K-306, and K-153) ................. 44

Figure 5- 1: Final well Sketch .............................................................................................................. 46


Figure 5- 2: Shows Final Completion Diagram ................................................................................... 47
Figure 5- 3: Illustrate wellhead and XMT Diagr ................................................................................. 50

IV
List of Tables

Table 1. 1: Shows the coordinate for SX location ................................................................................. 3

Table 2. 1: Shows formation tops and markers...................................................................................... 5


Table 2. 2: Shows sample manifest unwashed sets (A&B) ................................................................. 15
Table 2. 3: Shows sample manifest washed and dried sets (A&B) ..................................................... 16
Table 2. 4: Shows wells top correlation ............................................................................................... 17
Table 2. 5: Formation Gases with the Average values of the intervals ............................................... 18
Table 2. 6: Shows underground condition (gas shows) ....................................................................... 18
Table 3. 1: Shows the drilling fluid program ....................................................................................... 23
Table 3. 2: Shows the mud loss and treatment..................................................................................... 24
Table 3. 3: Shows the BHA data for hole size 17.5" ........................................................................... 25
Table 3. 4: Shows the BHA data for hole size 12.25" ......................................................................... 25
Table 3. 5: Shows the BHA data for hole size 8.5" ............................................................................. 26
Table 3. 6: Shows the Casing data ....................................................................................................... 26
Table 3. 7: Shows casing and cementing jobs data .............................................................................. 27
Table 3. 8: Shows cement plug jobs .................................................................................................... 28
Table 3. 9: Shows casing pressure test................................................................................................. 28
Table 3. 10: Shows bit record .............................................................................................................. 29
Table 3. 11: Shows well deviation record ............................................................................................ 30
Table 3. 12: Shows wellhead and BOP’s pressure test ........................................................................ 31
Table 3. 13: Shows drilling and well completion time analyses (Productive time) ............................ 33
Table 3. 14: Shows drilling and well completion time analyses (Nonproductive time) ...................... 34
Table 3. 15: Shows wellhead and x-mass tree assembly data.............................................................. 38

Table 4. 1: Shows abbreviation list of wireline logging tools ............................................................. 39


Table 4. 2: Shows Wireline Logging Summary for 12.25" (Open Hole) Section ............................... 39
Table 4. 3: Shows Wireline Logging Summary for 9 5/8" (Cased Hole) Section ............................... 40
Table 4. 4: Shows Wireline Logging Summary for 8.5" (Open Hole) Section ................................... 40
Table 4. 5: Shows Wireline Logging Summary for 7" (Cased Hole) Section ..................................... 40
Table 4. 6: Shows Wireline Logging Summary for 7" (Cased Hole, Perforation) Section ................. 40
Table 4. 7: Shows tertiary fluid contact ............................................................................................... 41

V
Table 4. 8: Shows the petro-physical property of the formations ........................................................ 45
Table 4. 9: Shows Wireline Logging Summary log evaluation for 9 5/8" (Cased Hole) Section ....... 45
Table 4. 10: Shows Wireline Logging Summary log evaluation for 7" (Cased Hole) Section ........... 45

Table 5. 1: Shows field measurement ................................................................................................. 52


Table 5. 3: Shows surface well testing summary ................................................................................. 53

Table 6. 1: Shows HSE equipment’s at well site ................................................................................. 54


Table 6. 2: Shows observation and cases at well site .......................................................................... 55

Table Appendix P. 1: Shows 13.375 IN casing tally ........................................................................... 57


Table Appendix P. 2: Shows 9.625 IN casing tally ............................................................................. 58
Table Appendix P. 3: Shows 7 IN casing tally .................................................................................... 60
Table Appendix P. 4: Shows 4.5 IN tubing tally ................................................................................. 62

VI
FINAL WELL REPORT
KAR COMPANY DRILLING NEW WELLS
KHURMALA DOME FIELD WELL NO: KDN-16 (K-442)
FIELD DIVISION WELL LOCATION (SX)

1. Introduction
Khurmala Dome (qubbat Khurmala) is one of three domes making up the super-giant oil-bearing
“Kirkuk” field (haql Kirkuk) in northern Iraq. The field has a clear surface expression, manifested by
a sinuous anticline about 105 km long and 3-5 km wide. The two main domes, Baba and Avanah are
located near Kirkuk, while the Khurmala dome is located near Erbil.
The Khurmala field is the northernmost of the three domes, although a fourth, smaller dome is present
further north: Zab dome, this is now confirmed by the recent (November 2013) discovery made by
Oryx Petroleum, Operator of the Hawler license area to the NE of Khurmala. The two main domes
(Baba and Avanah) are located in Kirkuk, while the third one (Khurmala) is located in Erbil. It has
been decided that Erbil will take the lead in managing and developing the Khurmala Dome. For that
purpose, Kar Group working with MNR, has been asked to operate and maintain the field.
The Khurmala Dome is located about 80 km to the north west of Kirkuk and 35 km west of Erbil, lies
fully on the territory of Erbil Governorate. The Khurmala Dome is about 22 km long and 3 km wide.
Hydrocarbons are produced from the Tertiary (main limestone) reservoir, a fold hydrocarbon trap
(Anticline fold) and rock type is Dolomitic limestone with reasonably good porosity and permeability,
which is characterized by natural fractures. The oil column thickness is thought to be about 60 m
sandwiched between a large gas cap and aquifer. The estimated Gas-Oil Contact is located at a depth
of 593 m MSL and Oil-Water Contact at a depth between 700 and 650 m MSL depending on location.

1
FINAL WELL REPORT
KAR COMPANY DRILLING NEW WELLS
KHURMALA DOME FIELD WELL NO: KDN-16 (K-442)
FIELD DIVISION WELL LOCATION (SX)

1.1. Well Summary


The well was spudded on (21/July/2017) and completed on (2/November/2017) as vertical oil producer
well from main limestone Reservoir reaching total depth (1089 m RTKB) through using GYP drilling
Company. This well was trying to locate the hydrocarbons accumulation and provide stratigraphic
information.
Integrated formation evaluation jobs conducted. Then the well had been completed with cased hole
completion through installing and cementing 7" Casing with completion perforated interval at Avanah
Porous Fm (1013-993) mRTKB.
4 ½" Vam Top L-80, 12.6 Lbs./ft. W / WEG, WXN Nipple, Perforated Joint, WX Nipple,7" black cat
Packer, SSD) from surface to 953 m subsurface safety valve SSSV & Cameron well head and X-mas
tree equipment had been used to complete the well.

The well stimulated with 20% HCL acid and completion test confirm good well production potential,
producing 6900 bbl/day @ Choke 128".

2
FINAL WELL REPORT
KAR COMPANY DRILLING NEW WELLS
KHURMALA DOME FIELD WELL NO: KDN-16 (K-442)
FIELD DIVISION WELL LOCATION (SX)

1.2. Well Location


Khurmala Dome field is divided to three regions; South, Middle and North. SL is located in the South
region. Locations Coordinate is as follows;

Table 1.1: The Coordination of SX Location

Location Elevation,
Easting Northing
(Planned Well) m AMSL

SX 384639.7 3983180.4 344.42

Figure 1.1: Structural Contour Map of Avanah Dense

3
FINAL WELL REPORT
KAR COMPANY DRILLING NEW WELLS
KHURMALA DOME FIELD WELL NO: KDN-16 (K-442)
FIELD DIVISION WELL LOCATION (SX)

1.3. General Well Data

Country Iraq (KRG)

Field Khurmala

Operator KAR Group Oil & Gas

Location SX

Well type Vertical Oil producer well

Well Name K-442 (KDN-16)

Rig name/type GYP RIG – 08

Drilling contractor GYP

Depth measurement Meters, RTKB

Datum RTKB

GL 344.42 m

RF 9m

RTKB 353.42 m

Well Total depth Primary target Tertiary reservoirs (Main limestone)


1089 m RTKB

Completion target Depth ,Target Depth (993-1013) mRTKB

Wellhead and XMT 13 5/8” x 9 5/8” x 7” x 4.5 – 3000psi (H2S= %4 and CO2
Assemble %7)

4
FINAL WELL REPORT
KAR COMPANY DRILLING NEW WELLS
KHURMALA DOME FIELD WELL NO: KDN-16 (K-442)
FIELD DIVISION WELL LOCATION (SX)

2. Geology Information Part


2.1. The Field Structure
In 2012-13 a new 3D seismic survey of the field was completed and a static / dynamic model had have
been build.
Khurmala consists of asymmetrical anticline, the dip of strata on both side is not equals, the dip limbs
of south west is more than the dip of north east, and the direction of dip of plunge and dip angle in
Khurmala differ than Baba and Avanah dome (in opposite direction).
Khurmala field lay in northwestern part from Kirkuk field consist of third dome for this field, and
separated from Avanah field Debbaga Saddle. The long of the dome about, (20-22) km. and wide about
(3.5) km. this dome contains a large quantity of free – gas, so contain oil column thickness about (104)
m. till (1994) drilled (39) wells, after drilled (24) wells ……. etc. density of oil equals (34.5) degrees.
Now but plans of developed the field by (KRG). Tertiary age formations are the main reservoirs for
oil production from Khurmala Dome and located at depth ranged between (420 – 720) meter below
mean sea level, mainly consisted from limestone beds and for this study divided into four reservoir
units.

5
FINAL WELL REPORT
KAR COMPANY DRILLING NEW WELLS
KHURMALA DOME FIELD WELL NO: KDN-16 (K-442)
FIELD DIVISION WELL LOCATION (SX)

Figure 2.1: Shows Location Map and Cross Section

6
FINAL WELL REPORT
KAR COMPANY DRILLING NEW WELLS
KHURMALA DOME FIELD WELL NO: KDN-16 (K-442)
FIELD DIVISION WELL LOCATION (SX)

2.2. Formation Tops and Markers

Table 2.1: Formation Tops and Markers

Program Top Actual Wireline Depth Below MSL Thickness Logger


Formation
(m) Driller (m) Top (m) @wireline (m)

Upper Middle Fars in part surface surface 0

Lower Fars (URB)-


624 632 658 307 58
A0

R6 N/A 636 N/A -

R7 N/A 648 N/A -

R8 N/A 656 N/A -

R9 N/A 668 N/A -

Seepage Beds-B1 665 682 716 -365 36

B2 N/A 696 733 -382

B3 N/A 732 N/A -

B4 N/A 740 N/A -

Saliferous Beds 764 746 752 -401 118

S1 N/A 852 858 -507

Transition Beds-T1 873 858 870 -519 36

T2 N/A 872 873 -522

T3 N/A 886 N/A -

T4 N/A 893 N/A -

T5 N/A 896 N/A -

BFC N/A 902 902 -551

Avana dense 903 906 906 -555 86

Avana Porous N/A 982 992 -641 49

Khurmala E4a N/A 1037 1041 -690

Total Depth - 1089 1089

7
FINAL WELL REPORT
KAR COMPANY DRILLING NEW WELLS
KHURMALA DOME FIELD WELL NO: KDN-16 (K-442)
FIELD DIVISION WELL LOCATION (SX)

2.3. Stratigraphy

2.3.1. Stratigraphy of Tertiary

The rocks exposed in the area have been subdivided into the Fars and Bakhtyari series (in NE flanks,
N Plunge near well k - 295), which are more or less lithological units, have their greatest influence in
evolution of the present-day topography. Generally, their exposures are confined to time anticline
belts. Whereas in the synclines alluvium and other recent deposits cover the most of the sequence. The
Stratigraphy sequences of the drilled wells encountered from the youngest to the oldest as described
below:

1. Upper/ Middle Fars formation: - (U. Miocene) (0 -632) m. Estimated true thickness: 632m.

The formation is predominantly of clastic one, it consists of an alternating series of Sandstone, reddish
brown, partly grey, fine to medium grains, inter bedded with Claystone, reddish to red brown, light
grey soft, slightly hard argillaceous, calcareous, semi plastic, show gradation into Marley to blue soft
plastic Calcareous and Argillaceous with Anhydrite nodules, increase towards the base of the
sequence. It found near tops of formation deposited of fresh water limestone white to buff in this well
not recovered due to taken of Samples intervals.

2. Lower Fars formation: - (M. Miocene). (632- 902) m. Estimated true thickness: 270 m.

The formation consists of alternation of Gypsum, Anhydrite, lagoonal Limestone markers, Marls, and
Siltstone with occasional rocks Salts. The top of the formation is marked by massive Anhydrite known
as (A0). The thickness of the formation in Khurmala dome

LF - is subdivided in to a number of units:

A - Upper Red Beds: - (632 -682) m.

Estimated true thickness: 50m.

The unit consists of an alternating sequence of reddish – brown, fine Sandstone, red siltstone, molted
blue Marls, sporadic with thin bands of Limestone markers and Anhydrite.

8
FINAL WELL REPORT
KAR COMPANY DRILLING NEW WELLS
KHURMALA DOME FIELD WELL NO: KDN-16 (K-442)
FIELD DIVISION WELL LOCATION (SX)

B - Seepage Beds :-( 682 -746) m.

Estimated true thickness: 64 m.

This unit consists of thick bands of white crystalline Anhydrites, inter bedded with bands of reddish
or blue Marls & Siltstone with thin bands of limestone (B1 – B4).

C - Saliferous Beds: (746 – 858) m. Estimated true thickness: 112m.

This unit is variable in thickness due to salt tectonic. It consists of alternations of Anhydrite, Gypsum,
Halite, Marl, and rare band of limestone(S-1) marker, which is very useful marker, this marker was
recognized in k -442, KDN-16.

D -Transition Beds :-( 858 – 902) m. Estimated true thickness: 44m.

This unit consists of a succession of thick beds of Anhydrite with some Gypsum inter bedded with thin
bands of Limestone and Marls, in this sequence several marker horizons have been established over
Kirkuk field, namely (T1 - T5) Limestone.
3. Basal Fars Conglomerate: - (M. Miocene), (902 - 906) m, estimated true thickness is 5 m.
This is conglomeratic limestone which is on the whole white and having indications of gas and oils
staining. The section is full of miliolids, dendritina sp. and reworked nummulitesspp. The base
represented surface of Unconformity
4. Avanah Dense FM: - (Upper/Middle Eocene), (906–982) m,
Estimated true thickness is 76 m.
This is fairly variable formation, having predominately a recrystallized fore – reef type lithology but
with some marly. The rock is porous, vuggy, fractured and locally stylolitic. Fauna includes
nummulites spp. Discocyclina sp., miliolids, textularids, alveeolina spp. Orbitolites sp., shell
fragments, echinoid debris, and algae. The rock is frequently pyritic and contains abundant calcite
growths.
5. Avanah Porous FM: - (Upper/Middle Eocene), (982 - 1037) m,
Estimated true thickness is 55m.
The well entered the gas cap of the (Main limestone) pay on this dome (khurmala), passed through the
oil column and into the water zone.

9
FINAL WELL REPORT
KAR COMPANY DRILLING NEW WELLS
KHURMALA DOME FIELD WELL NO: KDN-16 (K-442)
FIELD DIVISION WELL LOCATION (SX)

6. Khurmala (E4a) FM: - (Lower Eocene), (954 - 1120) m,


Estimated true thickness is 175 m.
The top of this formation is placed at the incoming of a silty, marly limestone. It is mad up essentially
of silty limestone which grade locally into calcareous sandstone; with thin shale developments on the
whole the rock is dolomitic, with all gradations of recrystallisation. The section is predominantly
dense, but with local porous section. Pyrites is common .Some traces of gastropods and foraminifera
can be made out, including miliolids, textularids and valvulinids.
7. Khurmala (E4b) FM: - (Lower Eocene), (1037 - 1071) m, estimated true thickness is 34 m.
The top of this formation is placed at the incoming of a silty, marly limestone. It is mad up essentially
of silty limestone which grade locally into calcareous sandstone; with thin shale developments on the
whole the rock is dolomitic, with all gradations of recrystallization. The section is predominantly
dense, but with local porous section. Pyrites is common. Some traces of gastropods and foraminifera
can be made out, including miliolids, textularids and valvulinids.

2.4 Lithology Description:


1-Desciption lithology below till to side track @962m
For the purpose of this report, the well has been divided into sections based on the Lithology. Each
section of this discussion includes summaries of Lithology, gas and hydrocarbon shows. All depths
quoted are measured below rotary table elevation.
Mud logging and geological operation were performed from surface to final total depth at 1071m MD.

Upper Middle Fars Fm @ 410m MD


From (410-632) m MD alternating of Sandstone, Claystone (Mudstone) and Siltstone
Claystone: (Mud stone): light brown, yellowish brown, grayish brown, sticky, blocky to sub blocky,
amorphous in part.
Sandstone: Very colored, moderately hard, fine to medium grain, rounded to sub rounded, slightly
calcareous.
Siltstone: Gray to light gray, moderately hard to hard, amorphous, blocky to sub blocky, calcareous.

Top of Lower Fars formation (Upper red bed) @ 632m RTKB (-277.5 BMSL).
R6 @ 636 m MD.
R7 @ 648 m MD.
R8 @ 656 m MD.
R9 @ 668 m MD.

10
FINAL WELL REPORT
KAR COMPANY DRILLING NEW WELLS
KHURMALA DOME FIELD WELL NO: KDN-16 (K-442)
FIELD DIVISION WELL LOCATION (SX)

From (632-682) m MD alternating of Claystone (Mudstone), Anhydrite, Limestone and Siltstone.


Claystone (Mudstone): Brown to light brown, reddish brown, grayish brown, moderately hard to
hard, sticky, blocky to sub blocky, amorphous, calcareous.
Anhydrite: White, buff, creamy, blocky to sub blocky, occasionally soft to firm.
Limestone: Green, light green, slightly to moderately hard, argillaceous, marly.Silty Clay: Grayish
brown, reddish brown, soft, moderately hard in part, blocky to sub blocky.
Top of Lower Fars formation (Seepage Beds) @ 682 m RTKB (- 327 BMSL)
B1 @ 682 m MD.
B2 @ 696 m MD.
B3 @716 m MD.
B4 @ 732m MD.
B5 @ 740 m MD.

From (682-704) m MD alternating of Limestone, Silty Clay and Anhydrite.


Limestone: Green, light green, slightly to moderately hard, argillaceous, marly.
Silty Clay: Grayish brown, reddish brown, soft, moderately hard in part, blocky to sub blocky.
Anhydrite: White, buff, creamy, blocky to sub blocky, occasionally soft to firm.
Visible oil show.
From (704-746) m MD alternating of Anhydrite, Limestone and Silty Clay.
Anhydrite: White, buff, creamy, snowy, translucent, blocky to sub blocky, very compact, very hard
occasionally soft to firm.
Limestone: Wackestone, Packstone, yellow grey, grey, greenish in part, slightly to moderately hard,
crystalline, argillaceous and marl.
Silty Clay: Gray to light gray, moderately hard to hard, amorphous, sub blocky to sub fissile,
argillaceous matrix, calcareous.
Top of Saliferous Bed @746m RTKB (-391.5 BMSL)
S1 @ 852 m MD.
From (746-810) m MD alternating of Silty Clay, Anhydrite, Salt and Marl.
SiltyClay: Gray to light gray, moderately hard to hard, amorphous, sub blocky to sub fissile,
argillaceous matrix, calcareous.
Anhydrite: White, buff, creamy, snowy, translucent, blocky to sub blocky, very compact, very hard
occasionally soft to firm.
Salt (Halite): White to colorless, crystalline, transparent, translucent, slightly hard, pure.

11
FINAL WELL REPORT
KAR COMPANY DRILLING NEW WELLS
KHURMALA DOME FIELD WELL NO: KDN-16 (K-442)
FIELD DIVISION WELL LOCATION (SX)

Marl: Greenish gray, light gray, green, blocky to subblocky, moderately firm, occasionally sticky,
slightly calcareous.

From (810-858) m MD alternating of Salt, Silty Clay, Anhydrite, Marl and Limestone.
Salt (Halite): White to colorless, crystalline, transparent, translucent, slightly hard, pure.
SiltyClay: Gray to light gray, moderately hard to hard, amorphous, sub blocky to sub fissile,
argillaceous matrix, calcareous.
Anhydrite: White, buff, creamy, snowy, translucent, blocky to sub blocky, very compact, very hard
occasionally soft to firm.
Marl: Greenish gray, light gray, green, blocky to subblocky, moderately firm, occasionally sticky,
slightly calcareous.
S1or X-Limestone: Mudstone to wackestone, light grey to grey, puff in part, moderately hard , porous,
vuggy in part, marly in part.

Top of LOWER FARS (Transition Bed) @858 m RTKB (-503.5BMSL)


T2 @ 872 m MD.
T3 @ 886 m MD.
T4 @ 893 m MD.
T5 @ 896m MD.

From (858-887) m MD alternating of Silt clay, limestone and Anhydrite


Silt clay: Gray to light gray, moderately hard to hard, amorphous, sub blocky to sub fissile, argillaceous
matrix, calcareous
Limestone: Wackestone to Packstone gray, creamy, light gray, brown, crypto to micro crystalline,
moderately hard to hard, oil staining, argillaceous, marly.
Anhydrite: White, buff, creamy, snowy, translucent, blocky to sub blocky, very compact, very hard
occasionally soft to firm.

From (887-902) m MD mainly limestone alternating with Silt clay with streaks of Silt clay, Marl
and Anhydrite
Limestone T4, T5: Wackestone to Packstone gray, creamy, light gray, brown, crypto to micro
crystalline, moderately hard to hard, oil staining, argillaceous, marly.
Silt clay: Gray to light gray, moderately hard to hard, amorphous, sub blocky to sub fissile,
argillaceous matrix, calcareous

12
FINAL WELL REPORT
KAR COMPANY DRILLING NEW WELLS
KHURMALA DOME FIELD WELL NO: KDN-16 (K-442)
FIELD DIVISION WELL LOCATION (SX)

Marl: Greenish gray, light gray, green, blocky to sub blocky, moderately firm, occasionally sticky,
slightly calcareous.
Anhydrite: White, buff, creamy, snowy, translucent, blocky to sub blocky, very compact, very hard
occasionally soft to firm.

Top of BFC @ 902m RTKB (-547.5 BMSL)


From (902-906) m MD Mainly Conglomeritic limestone.
Conglomeritic Limestone: Light gray to gray, buff in part, soft to moderately hard, compact in part,
fine crystalline, marly, chalky, and argillaceous.

Top of Avanah Dense E1 @ 906m RTKB (-551.5 BMSL) Typical lagonal Pilaspi Formation
Finger
From (906-924) m MD Mainly Limestone
Limestone: White to whittles, gray, moderately hard to hard, crypto crystalline, blocky, translucent,
slightly transparent, recrystallization, vuggy, chalky, marly in part, pyritic, dolomitic in part, with pure
calcite crystals nodules anhydrite with brawn siltstone, no visible porosity.
From (941-962) m MD No Return
Bad Return from 941m to 945m, No Samples at Shaker
Blind Drill with Water from Depth 945m to 962m.

2- Lithology description below from kick off point for side track @898m.

Top of BFC @ 902m RTKB (-547.5 BMSL)

From (902-906) m MD Mainly Conglomeritic limestone.


Conglomeritic Limestone: Light gray-to-gray, buff in part, soft to moderately hard, compact in part,
fine crystalline, marly, chalky, and argillaceous.

Top of Avanah Dense E1 @ 906m RTKB (-551.5 BMSL) Typical lagonal Pilaspi Formation
Finger
From (906-940) m MD Mainly Limestone
Limestone: White to whittles, gray, moderately hard to hard, crypto crystalline, blocky, translucent,
slightly transparent, recrystallization, vuggy, chalky, marly in part, pyritic, dolomitic in part, with pure
calcite crystals nodules anhydrite with brawn siltstone, no visible porosity.

13
FINAL WELL REPORT
KAR COMPANY DRILLING NEW WELLS
KHURMALA DOME FIELD WELL NO: KDN-16 (K-442)
FIELD DIVISION WELL LOCATION (SX)

Top Avanah Porous E2 @982 m RTKB(-627.5 BMSL) Find by Wireline


Blind Drilling With Water.
Bad Return From/998m to 1000m.

Top of Khurmala E4a@ 1037 m MD, -682.4 BMS by Wireline


Bad Return From/1038m to 1047m.
Average Losses 250 bbl/hr.
Samples Cutting Do Not Represent Actual Depth.
Blind drilling with water.
Bad Return From/1060m to 1089m.
Average Losses 300 bbl/hr.

14
FINAL WELL REPORT
KAR COMPANY DRILLING NEW WELLS
KHURMALA DOME FIELD WELL NO: KDN-16 (K-442)
FIELD DIVISION WELL LOCATION (SX)

2.5. Sample Manifest

Table 2.2: Sample Manifest (Unwashed Sets A & B)

Cutting Samples Inventory


From:632m
To: 1089m
Samples: Unwashed-Sets (A &B)
Box # Set No. From To Interval # Samples Missed Hole
A 632 672 5 20 -
1
B 632 672 5 20 -
A 672 712 2 20 -
2
B 672 712 2 20 -
A 712 752 2 20 -
3
B 712 752 2 20 -
12 1/4"
A 752 792 2 20 -
4
B 752 792 2 20 -
A 792 832 2 20 -
5
B 792 832 2 20 -
A 832 886 2 27 -
6 B 832 886 2 27 -
A 886 962 2 15 916-962
7 8 ½"
B 886 962 2 15 916-962
A 918 1089 2 11 940-1089
8 8 ½" ST
B 918 1089 2 11 940-1089
Total Samples: 306 Samples
Total Plastic Boxes: 16 Boxes

15
FINAL WELL REPORT
KAR COMPANY DRILLING NEW WELLS
KHURMALA DOME FIELD WELL NO: KDN-16 (K-442)
FIELD DIVISION WELL LOCATION (SX)

Table 2.3: Sample Manifest (Dried and Wshed Sets A & B)

Hole sections Sample Interval Interval Depth

12 ¼"
2m From 632m to 887m
Wet & Dry samples
8 ½"
2m From 886m to 962m
Wet & Dry samples
8 ½"
Wet & Dry samples 2m From 918m to 1089m
(Side track)

Cutting Samples Inventory


From:632m
To: 1089m
Samples: Washed and Dried-Set (A,B)
Plastic Box Carton Box (Small)
(Big)
Box Samples
Set No. Box # From To Interval Missed Hole
# #
A 632 672 2 20 -
1
B 632 672 2 20 -
A 672 712 2 20 -
2
B 672 712 2 20 -
1 12 1/4"
A 712 752 2 20 -
3
B 712 752 2 20 -
A 752 792 2 20 -
4
B 752 792 2 20 -
A 792 832 2 20 -
5
B 792 832 2 20 -
A 832 886 2 27 - 12 1/4"
2 6
B 832 886 2 27 - And 8 ½"
A 886 962 2 15 916-962
7
B 886 962 2 15 916-962

A 918 1089 2 11 940-1089 8 ½" ST


3 8
B 918 1089 2 11 940-1089
Total Samples: 306 Samples
Total Carton Boxes: 16 Boxes
Total Plastic Boxes: 3 Boxes

16
FINAL WELL REPORT
KAR COMPANY DRILLING NEW WELLS
KHURMALA DOME FIELD WELL NO: KDN-16 (K-442)
FIELD DIVISION WELL LOCATION (SX)

2.6. Well Tops Correlation

Table 2.4: Well Tops Correlation

K-442
K-306 K-439
Formation
SS Formation SS Formation SS
tops
Formations MSL Tops MSL Tops MSL
GL: 345 m
(M) GL:354, (M) GL:332 (M)
RTKB:354.5
RTKB 359 RTKB: 338

m SS m SS
Rock Unit m RTKB m RTKB m RTKB m SS MSL
MSL MSL

Upper Red Bed 632 -277.5 583 -224 612 -274

Seepage Bed 682 -327.5 660 -301 672 -334

Saliferous Bed 746 -391.5 695 -336 722 -384

Trans. Bed 858 -503.5 807 -448 812 -474

BFC 902 -547.5 835 -476 845 -507

Avana Dense 906 -551.5 846 -487 848 -510

Avana Porous 982 -627.5 922 -563 929 -591

Khurmala A 1037 -682.5 995 -636 980 -642

Khurmala B - 1121 -762 -

17
FINAL WELL REPORT
KAR COMPANY DRILLING NEW WELLS
KHURMALA DOME FIELD WELL NO: KDN-16 (K-442)
FIELD DIVISION WELL LOCATION (SX)

2.7. Underground Condition:


2.7.1. Oil Shows
During the drilling operation, some records of gas and oil show as below:
Oil Shows: during drilling, have no any data records of Oil shows due to complete losses from 915m to
TD.
2.7.2. Background gases of drilled intervals:
Table 2.5: Formation Gases with the Average values of the intervals

Depth Total Gas C1 C2 C3 iC4 nC4 iC5 nC5 CO2 H2S


m % ppm ppm Ppm ppm ppm ppm ppm ppm ppm
705- 811 0.0023 20 - - - - - - - -
811-858 0.0067 56 - - - - - - - -
858-885 0.01 91 - - - - - - - -

885-887 0.009 82 - - - - - - - -
887-902 0.0069 287 39 10 Tr Tr - - - -
902-906 0.186 1504 159 56 28 19 14 18 - -
907-940 0.86 6074 493 155 54 41 19 27 - -
978-980 1.51 9618 781 261 83 69 29 40 - -
998-1000 17.2 85115 8725 2191 581 334 125 194 - -
1038-1047 0.067 23 - - - - - - - -
1065-1089 0.24 1025 100 33 21 17 15 20 - -

2.7.3. Peak Formation Gases

Table 2.6: Under Ground Conditions (Gas Shows)

Depth Total Gas C1 C2 C3 iC4 nC4 iC5 nC5 CO2 H2S


m % ppm ppm Ppm ppm ppm ppm ppm ppm ppm

915 2.13 14696 1184 362 120 91 36 55 - -


924 2.00 13859 1129 348 119 90 38 57 - -
928 1.91 13212 1072 329 113 85 38 55
979 1.64 10238 831 295 86 78 31 41 - -
1000 23.22 114118 11057 2541 660 389.197 143 225 - -
1072 1.18 10521 885 321 162 114 77 111 - -

18
FINAL WELL REPORT
KAR COMPANY DRILLING NEW WELLS
KHURMALA DOME FIELD WELL NO: KDN-16 (K-442)
FIELD DIVISION WELL LOCATION (SX)

2.8. Core Samples

No core samples.

2.9. Master log

Note/ The master log is located in appendix G (Geology).

19
FINAL WELL REPORT
KAR COMPANY DRILLING NEW WELLS
KHURMALA DOME FIELD WELL NO: KDN-16 (K-442)
FIELD DIVISION WELL LOCATION (SX)

3. Drilling Information
3.1. Drilling Operation Summary:
3.1.1. First hole 17 1/2" hole interval (000-410m RTKB)

The hole was drilled from 12m to 410 m (RTKB) with 17 ½" bit to the middle Fars formation using
FWB mud density (1.02g/cc.-1.10 g/cc.) with problem of tight hole while new connection and tripping.
After reaming and conditioning mud 13 3/8" casing was run to the depth 407 m, and cemented to the
surface with one slurry successfully, by using bottom and top plugs and pumping 273 bbl class G
cement slurry with density 1.8 gm/cc, WOC and working on the well head (cutting & levelling of 13
3/8” casing) Installed 13 5/8" -5000 psi casing head housing thread type (BTC) Installed BOPs and
pressure tested with 2000 psi.

3.1.2. Second hole 12 1/4" hole interval (410-887 m RTKB)


The hole was drilled from 410 m to 887 m (RTKB) with 17 ½" bit to the top of Avanah formation
using S.S.M. mud density (1.15 g/cc - 1.25 g/cc) with problems of tight holes in intervals between
477m-630m and 825m-847m then treated by reaming and circulation, also observed pipe stuck at 830m
and released successfully by jarring downward. After conditioning mud & open hole logging, 9 5/8"
casing was run to the depth 884.7 m and cemented to the surface with one slurry successfully, by using
211 bbl. Class G cement slurry with density (1.7g/cc) WOC and working on the well head then cut off
and levelling 9 5/8" casing.
Installed & connected 13 5/8"-5000 psi. Casing head spool on the casing head housing.
Installed DSA 5000x10000psi then BOPs and tested pipe ram, kill line vale and annular preventer with
2500 psi for 15 minutes successfully, also pressure tested blind rams with 2500 psi for 15 minutes
successfully. After drill out plugs and cement to three meters above 9 5/8" casing shoe then scraped
casing and performed Logging (CBL and VDL), the 9 5/8" casing integrity test done with 1000 psi for
20 minutes successfully.

3.1.3. Third hole 8 1/2" hole interval (887-1089 m RTKB)


The hole was drilled from 887m to 1089m (RTKB) at (Khurmala E4a) formations with 81/2" bit using
KCL Polymer mud density (1.02g/cc.-1.04g/cc.) with problem of partial to complete mud losses while
drilling operation at depth 924m observed total loss tried to control loss with LCM not succeeded then
continued blind drilling from 924m to 962m with water, while drilling at 962m indicated low rate of
penetration and suddenly string weight dropped, POOH BHA was parted from DC and about 40m
BHA left in hole, tried many times with fishing tools (overshot +spiral grapple) to catch and take out
the fish but it was not succeed, performed kick off cement from bottom to 887m then started side track

20
FINAL WELL REPORT
KAR COMPANY DRILLING NEW WELLS
KHURMALA DOME FIELD WELL NO: KDN-16 (K-442)
FIELD DIVISION WELL LOCATION (SX)

drilling with MWD tools. While side track drilling at depth 941 observed total loss tried with LCM
not succeed continued blind drilling to 1089m TD, after clean and circulate the hole performed wire
line logging then run in hole OEDP and performed three diesel bentonite plugs and two thixotropic
cement plugs to control the loss not succeed, finally 7’’ casing was run to 1085.5m
7’’ casing cemented with two slurries (lead and tail) using 64bbl of 1.8 g/cc with loss materials as lead
and 86bbl of 1.8 g/cc as tail. WOC, cut and levelled 7’’ casing then installed 11’’ 5000psi tubing head
spool on 13 5/8’’ 5000 psi casing head spool. Installed 13 5/8’’ BOPs and pressure tested with 2500
psi successfully, After RIH 6’’ bit and drilled out plugs performed scraping and wireline logging then
RIH final well completion and set the packer with 3500psi.

21
FINAL WELL REPORT
KAR COMPANY DRILLING NEW WELLS
KHURMALA DOME FIELD WELL NO: KDN-16 (K-442)
FIELD DIVISION WELL LOCATION (SX)

3.2. Hole Problems and their remedies:


3.2.1. First hole 17 1/2" (000 m-410 m RTKB)
Tight hole while tripping and new connection treated by reaming and mud conditioning.

3.2.2. Second hole 12 1/4" hole interval (410-887m RTKB)

Observed tight hole (10-15 Ton) before new connections while drilling & tripping @ the interval
(477m-590m)(590m-630m)(762m-790m)(825m-847m) The tight hole was treated by continue
reaming pre any new connection & conditioning mud while reaming and before tripping.

3.2.3. Third hole 8 1/2" hole interval (887-1089m RTKB)


- Partial mud loss while drilling at 924m, loss treated by LCM.
- Total mud loss while drilling at 926m tried to control the loss with LCM not succeeded,
continue drilling blindly.
- While drilling blindly from 926m-962m at 962m observed low ROP and String weight
suddenly dropped. POOH to check the BHA condition, observed BHA parted from box side of
DC, fish left in hole (Bit+ Bit sub+2DC+STB+DC+STB+DC) observed top of fish at 917m.
Tried several times to catch and take out the fish by fishing tools (5342 overshot+ spiral
grappler+ magnet) Fishing operation failed. Performed kick off cement plug from bottom hole
962m up to 887m then side-track drilling with MWD tools from 880 to 1089m TD.
- After completed drilling operation and reached TD at 1089m, observed mud still losing totally
in to the formation. Tried to control loss with acid soluble LCM (Not succeed) then Performed
three Gunk plugs (diesel+ Bentonite) and two Thixotropic cement plugs to seal off the lost
zone (Not succeed).
- While trying to control total loss observed the well started to flow (kick occurred) it was
controlled by Closing the BOP (SICP=940 psi, SIDPP =920psi) and pumping water through
drill pipe and annulus, pressure decreased from both side to zero psi.

22
FINAL WELL REPORT
KAR COMPANY DRILLING NEW WELLS
KHURMALA DOME FIELD WELL NO: KDN-16 (K-442)
FIELD DIVISION WELL LOCATION (SX)

3.3. Drilling fluid Program:

Table 3.1: Drilling Fluid Program

Drilling Fluid Program


Company KAR Company Well No. K-442/Kdn-16
Contractor GYP Location SX
Rig Type Rig # 08 (Nat 1320-M) Spudded in 25-July-2017
Field Khurmala Completed on 02-Nov-2017
Hole Size (in) 171/2’’ 121/4’’ 81/2’’

Interval (m) 0-410 410-887 887-1089


Mud Type Bentonite Mud KCL Salt
KCL Polymer Mud
Saturated Mud
S.g. 1.09 1.3 1.04-1.10
M.F. Viscosity
48-52 48-50 45-50
(Sec/qtr)
Apparent N/A
N/A N/A
Viscosity, (cp)
P.VISCOSITY, (cp) 13 19 15
Yield Point,
18 20 20
(Ib/100ft)
Gel Strength Ib/100ft,
10/15 6/8 5/7
(0/10 min)
Fluid Loss
10 4.1 -
(cc/30 min)
HP - - -
Filtrate, (cc) 9.4 9.2 9.4
PH 0.5 0.4

Alkalinity 0.6 - -

Line, (Ib/bbl) - - -
Stability
- 20 1
(Volts)
Solid % 6 0.6 0
Sand % 0.3 80 98
Water % 93 0 0
Oil % 0 188000 -
Salinity (ppm) - - -
Ca++ (ppm) 800 0.5 0.3
Mud cake 1 2 0

23
FINAL WELL REPORT
KAR COMPANY DRILLING NEW WELLS
KHURMALA DOME FIELD WELL NO: KDN-16 (K-442)
FIELD DIVISION WELL LOCATION (SX)

3.4. Mud losses & treatment:

Table 3.2: Mud Loss and Treatment

Hole Total Mud Rate of Total


Losses
Size Depth Formation Density, Losses Losses Treatment
Interval, (m)
(in) (m) g/cc bbl/hr bbl
No mud losses
Sandstone& indicated while
17 ½ 410 No loss 1.05 No loss No loss
Claystone drilling this hole
section
No mud losses
Anhydrite,
indicated while
12 ¼ 887 No loss Limestone & 1.05-1.30 No loss No loss
drilling this hole
Marl
section
924 – 926 Limestone 7bbl/hr 21bbl LCM used to cure
the loss –Not
succeed.

LCM used to cure


the loss-Not
succeeded then
8½ 1.03
1089 three gunk
plugs(Diesel
bentonite) used- not
Dolomitic succeeded after that
926-1089 limestone Total N/A tow thixotropic
&Dolomite cement plugs
performed

24
FINAL WELL REPORT
KAR COMPANY DRILLING NEW WELLS
KHURMALA DOME FIELD WELL NO: KDN-16 (K-442)
FIELD DIVISION WELL LOCATION (SX)

3.5. BHA Data:


3.5.1. BHA for hole size: 17 1/2" (First Hole):

Table 3.3: 17 1/2" BHA Data (First Hole)

Size Weight Length Total wt. OD ID


Item No.
(in) Kg/m (m) In air (ton) (in) (in)
TCI Bit 17 ½ 1 321.4 0.28 0.0899 17 ½
Bit sub + Float valve 9½ 1 321.4 0.91 0.2924 9½ 3
DC 8 2 321.4 18.14 5.830 8 3
Stabilizer 17 ½ 1 321.4 1.51 0.4853 17 ½ 3
Pony 8’’ DC 8 1 321.4 2.59 0.8324 8 3
Stabilizer 17 ½ 1 321.4 1.51 0.4853 17 ½ 3
6 DC 8 6 321.4 54.5 17.516 8 3
Drilling Jar 8 1 321.4 9.68 3.1111 8 3
2 DC 8 2 321.4 18.29 5.8784 8 3
X-over 8 1 321.4 1.42 0.4563 8 3
9 HWDP 5 9 74.4 81.96 6.0978 5 3½
Total weight of BHA in Air (ton) = 41.07
Total weight of BHA in mud (ton) = 35.29
Total weight of BHA in mud without (HWDP) = 30.06
Mud Weight = 1.10 g/cc
Bouncy Factor = 0.86

3.5.2. BHA for hole size: 12 1/4" (Second Hole):

Table 3.4: 12 1/4" BHA Data (Second Hole)

Size No. Length Total wt. OD ID


Item Weight Kg/m
(in) (m) In air (ton) (in) (in)
TCI Bit 12 ½ 1 218.73 0.28 0.0612 17 ½
Bit sub 9½ 1 218.73 0.91 0.1990 9½ 3
2 DC 8 2 218.73 18.14 3.9677 8 3
Stabilizer 12 ½ 1 218.73 1.51 0.3302 17 ½ 3
Pony 8’’ DC 8 1 218.73 2.59 0.5665 8 3
Stabilizer 12 ½ 1 218.73 1.51 0.3302 17 ½ 3
6 DC 8 6 218.73 54.5 11.9207 8 3
Drilling Jar 8 1 218.73 9.68 2.1173 8 3
2 DC 8 2 218.73 18.29 4.0005 8 3
X-over 8 1 74.4 1.42 0.1056 8 3
9 HWDP 5 9 74.4 81.96 6.0978 5 3½
Total weight of BHA in air (ton)= 29.69
Total weight of BHA in mud (ton)=25.16
Total weight of BHA in mud without (HWDP)=19.99
Mud Weight = 1.24 g/cc
Bounce Factor for Mud Weight = 0.848

25
FINAL WELL REPORT
KAR COMPANY DRILLING NEW WELLS
KHURMALA DOME FIELD WELL NO: KDN-16 (K-442)
FIELD DIVISION WELL LOCATION (SX)

3.5.3. BHA for hole size: 8 1/2" (Third Hole):

Table 3.5: 8 1/2" BHA Data (Third Hole)

Size Length Total wt. OD ID


Item No. Weight Kg/m
(in) (m) In air (ton) (in) (in)
8 1/2'' PDC Bit 8½ 1 218.73 0.23 0.0503 8½
6 3/4" Motor w/ 8
8 3/8 1 218.73 9.16 8 3/8 2¼
3/8" S. Stab / 1.5 2.0035
6 3/4" Pony NMDC 6¾ 1 218.73 4.21 0.9208 6¾ 2¼
6 3/4" MWD 6¾ 1 218.73 8.84 1.9335 6¾ 2¼
6 3/4" MWD Flow
6¾ 1 218.73 0.94 6¾ 2¼
Sub 0.2056
6 3/4" NMDC 6¾ 1 218.73 7.56 1.6535 6¾ 2¼
PBL circulation sub 6¾ 1 218.73 2.74 0.5993 6¾ 2¼
XO 6¾ 1 218.73 0.80 0.1749 6¾ 2¼
3*6 1/2" DC 6¾ 3 218.73 27.56 6.0281 6¾ 2¼
XO 6¾ 1 218.73 0.82 0.1770 6¾ 2¼
5*5" HWDP 5 5 218.73 45.61 9.9762 5 3
6 1/2" Jar 5 1 218.73 5.47 1.1964 5 3
Total weight of BHA in air (ton) 32.90
Total weight of BHA in mud (ton) = 28.62
Total weight of BHA in mud without (HWDP) = 21.4
Mud Weight = 1.02 g/cc
Bounce Factor for Mud Weight = 0.8702

3.6. Casing Data:


Table 3.6: Casing Data

Casing Flouting Equipment


Centralizer
Joints No.

Length

Hole Shoe F.C


T.D
(m)

Size Size Grade Weight Coupling


(m) Depth Depth
(in) (in) API (ppf) Type Type Type
(m) (m)

17 ½ 410 13 3/8 J-55 54.5 BTC 36 407 8 Float 407 Float 394.7

12 ¼ 887 9 5/8 J55/ L-80 43.5/ 40 BTC 77 884.5 10 Float 884 Float 872

8½ 1089 7 L-80 26 BTC 95 1085.5 16 Float 1085 Float 1061.9

26
FINAL WELL REPORT
KAR COMPANY
DRILLING NEW WELLS
KHURMALA DOME FIELD
WELL NO: KDN-16 (K-442)
FIELD DIVISION
WELL LOCATION (SX)

3.7. Casing and cementing jobs data:


Table 3.7: Casing and Cementing Job Data

Cementing Displacement Fluid

Additives
Casing depth
Pressure
Size (in)

Size (in)
Casing
Hole

(m)
Slurry Disp. Cement Cement Remark
Slurry Percentage Cement
Type Volume Sp.gr Volume Return, Top
(sp.gr) Sack (SX)

Bump
Press
Type By

Final

Plug
(bbl) (bbl) (bbl) (m) Initial
Weight/Vol Press

No loss while
17 ½ 13 3/8 407 Class G 1.8 273 Deformer 0.087 gal/bbl 1182 1.10 201 30 surface 190 1100 1600
cementing

Deformer
0.083 gal/bbl
No loss while
12 1/4 95/8 884 Class G 1.8 211 1.56 Ib/bbl 876 1.3 204 20 surface 200 1000 1400
Dispersant cementing
21.7 Ib/bbl
NACL salt

Deformer
0.095 gal/ bbl
Dispersant 6.278 Ib/bbl
FLAC 1.345Ib/bbl
Lead Spacer return
1.9 64 305 1.03 134 No 840 200 1200 1600
class G on shaker
Gas tight 9.542 gal/bbl
latex
8 1/2 7 1085 HCS Agent 0.954 gal/bbl

Deformer
0.097 gal/bbl
Tail Cement return
1.9 84 1.593 Ib/bbl 406 1.03 105 25 surface 100 1150 2200
class G Dispersant to surface
0.455 Ib/bbl
Retarder

27
FINAL WELL REPORT
KAR COMPANY
DRILLING NEW WELLS
KHURMALA DOME FIELD
WELL NO: KDN-16 (K-442)
FIELD DIVISION
WELL LOCATION (SX)

3.8. Cement Plug Jobs:


Table 3.8: Cement Plug Jobs

Slurry Slurry
No. Date Job Type Interval (m) Volume, Density, Cement Type Reason Remark
m3 gm/cc
Kick off To perform
1 17/08/2017 plug 873-907 14 1.9 Class G sidetrack -
(Back plug) drilling
Diesel+ To seal off
2 31/08/2017 926-934 40 1.7 - Not succeeded
Bentonite the lost zone

Diesel+ To seal off


3 01/09/2017 926-934 40 1.8 - Not succeeded
Bentonite the lost zone

Diesel+ To seal off


4 02/09/2017 926-934 40 1.8 - Not succeeded
Bentonite the lost zone

Thixotropic
To seal off
5 03/09/2017 cement 926-934 70 1.7 Class G Not succeeded
the lost zone
plug

3.9. Casing Pressure Test:


Table 3.9: Casing Pressure Test

Hole Depth
Casing Mud Pressure Time
Size Result Remarks
Size (in) Top Bottom sp.gr (psi) (min)
(in)

Tested
by
17 ½ 13 3/8 surface 407 1.10 1400 15 OK
cement
unit

Tested
by
12 ¼ 9 5/8 surface 884.5 1.32 2500 15 OK
cement
unit

Tested
by
8½ 7 surface 1089 1.01 2500 15 OK
cement
unit

28
FINAL WELL REPORT
KAR COMPANY
DRILLING NEW WELLS
KHURMALA DOME FIELD
WELL NO: KDN-16 (K-442)
FIELD DIVISION
WELL LOCATION (SX)

3.10. Bit Record:


Table 3.10: Shows Bit Records

Flow
BHA BIT D.OUT METER SPP
BIT TYPE MADE BIT SIZE IADC JETS SN T.REV BIT hrs ROP Rate
RUN# NO (m) Drilled psi
L/Min
1 TCI Varco 1 17.5 415 4x18/32 D216959 18 410 N/A 108 4 2600 400
2 TCI ST 2 12.25 447 4x32 P44394 433 23 51947 10.06 2.29 496-583 129-358
4 PDC Reed 3 12.25 S222 6x15+1x14 E159678 887 454 375955 53 8.57 359-631 2561048
5 PDC NOV 4 8.5 437 3x16 D183177 Drill Cement
6 PDC NOV 4RR 8.5 437 3x16 D183177 Scraping
7 TCI NOV 6 8.5 437 Open D183177 Lost In Well @ 962m.
8 - - - - - - - Fishing
9 RB NOV 7 8.5 517 Open D174792 Tag and Clean Top of Fish
10 - - - - - - - 8" Magnet
11 - - - - - - - Take Imprint For Top of Fish
12 - - - - - - - Fishing
13 - - - - - - - Fishing
14 - - - - - - - Fishing
15 - - - - - - - Fishing
16 RB NOV 7RR 8.5 517 Open D174792 Drill Cement
17 RB NOV 7RR2 8.5 517 Open D174792 907 20 351758 51.25 0.54 326-613 631-940
535-
18 TCI NOV 8 8.5 M422 3x14+1x13 E206844 1089 182 418814 25.92 9.59 325-406
1001
19 TCI N/A 9 8.5 517 OPEN D174792 Clean Hole
20 TCI N/A 9RR 8.5 517 OPEN D174792 Clean Hole
21 TCI N/A 9RR2 8.5 517 OPEN D174792 Clean Hole
22 TCI N/A 10 6 PM1410 OPEN XR20TPS Drill DV
23 TCI N/A 10RR 6 PM1410 OPEN XR20TPS Scraping

29
FINAL WELL REPORT
KAR COMPANY
DRILLING NEW WELLS
KHURMALA DOME FIELD
WELL NO: KDN-16 (K-442)
FIELD DIVISION
WELL LOCATION (SX)

3.11. Well Deviation Record:


Table 3.11: Well Deviation Record

Hole Size Measured Depth Deviation


NO.
(in) (m) Degree Remarks

1 17 ½ 135 0.75 USED TOTCO

2 17 ½ 280 0.25 USED TOTCO

3 12 ¼ 433 1.75 USED TOTCO

4 12 ¼ 533 2 USED TOTCO

5 12 ¼ 677 2 USED TOTCO

6 12 ¼ 884 2.75 USED TOTCO

7 8½ 930 5.6 MWD

8 8½ 1018 1.7 MWD

9 8½ 1089 0.3 MWD

30
FINAL WELL REPORT
KAR COMPANY
DRILLING NEW WELLS
KHURMALA DOME FIELD
WELL NO: KDN-16 (K-442)
FIELD DIVISION
WELL LOCATION (SX)

3.12. Wellhead and BOP Pressure Test:

Table 3.12: Wellhead and BOP Pressure Test

Depth
Hole Mud Wellhead & Pressure
TD Time (Min) Result Remarks
Size (in) gm/cc Bop Stack (Psi.)
(m)

13 5/8" 10K
17 ½ 410 1.02 Annular 1500 15 OK Tested by water using rig pump
preventer
13 5/8" 10K Tested by water using cup type
17 ½ 410 1.02 1500 15 OK
Pipe Ram tester and rig pump
13 5/8" 10K Tested by water using rig pump
17 ½ 410 1.02 1500 15 OK
Blind Ram
11" 5K Casing OK Tested by water using small hand
12 ¼ 887 1.32 2000 15
Head Spool pump
12 ¼ 1.32 13 5/8" Annular OK Tested by water using rig pump
887 1500 15
preventer
12 ¼ 1.32 OK Tested by water using cup type
887 10K Pipe Ram 1500 15
tester and rig pump
12 ¼ 887 1.32 10K Blind Ram 1500 15 OK Tested by water using rig pump
11" 5K Tubing 15 OK Tested by water using small hand
8½ 1089 1.05 2000
Head spool pump
8½ 13 5/8’’ Annular 1500 15 OK Tested by water using rig pump
1089 1.05
preventer
8½ 1500 15 OK Tested by water using cup type
1089 1.03 10K Pipe Ram
tester and rig pump
8 ½’’ 1089 1.03 10K Blind Ram 1500 15 OK Tested by water using rig pump

31
FINAL WELL REPORT
KAR COMPANY
DRILLING NEW WELLS
KHURMALA DOME FIELD
WELL NO: KDN-16 (K-442)
FIELD DIVISION
WELL LOCATION (SX)

3.13. Drilling Progress Curve:

Figure 3.1: Drilling Progress Curve

32
FINAL WELL REPORT
KAR COMPANY
DRILLING NEW WELLS
KHURMALA DOME FIELD
WELL NO: KDN-16 (K-442)
FIELD DIVISION
WELL LOCATION (SX)

3.14. Drilling and Well Completion Time Analyses:

Table 3.13: Drilling and Well Completion Time Analysis (Productive Time)

Hole Size (in) Total


Operations Total (Days) %
(Hours)
" ¼" ½"
17 ½ 12 8
Active "Productive" time

Drilling 57.5 59 117.5 234 9.75 12.54%

R/Trip (Drill ,Ream, Open,


14.25 32.5 118 164.75 6.864583333 8.83%
scrapping)

Circulation, Mix & Cond.


5 16.75 16.75 38.5 1.604166667 2.06%
Mud

Reaming 1 6.25 16.75 24 1 1.29%


Rig up / Run Casing /cut
20.5 16 17.5 54 2.25 2.89%
DL

Cementing Casing 2 3.5 5 10.5 0.4375 0.56%

WOC 18 16 14.5 48.5 2.020833333 2.60%

Drill. out Cement (csg) 2.5 6.5 3.25 12.25 0.510416667 0.66%

Logging / perforation 13.5 45 58.5 2.4375 3.14%


L/D &N/Up Bop´s/Change
39.75 33.5 41 114.25 4.760416667 6.12%
Rams
Install W.HD/X-mas Tree 11 5.5 15.5 32 1.333333333 1.72%

Test Bop´s & CSG shoe 7.25 12.75 23.5 43.5 1.8125 2.33%
Pick Up/Lay Down DP´S,
21.5 11.5 46.5 79.5 3.3125 4.26%
DCS , Kelly
Deviation Survey (TOTCO) 1 6.5 5 12.5 0.520833333 0.67%

Test Formation 0 0 0.00%

Completion Operations 72 72 3 3.86%

Total Dead Time 998.75 41.61458333 53.54%

33
FINAL WELL REPORT
KAR COMPANY
DRILLING NEW WELLS
KHURMALA DOME FIELD
WELL NO: KDN-16 (K-442)
FIELD DIVISION
WELL LOCATION (SX)

Table 3.14: Drilling and Well Completion Time Analysis (Non-Productive Time)

Hole Size (in) Total Total


Operations %
17 ½ 12 ¼ 8½ (Hours) (Days)
Lost "Nonproductive" Time
Rep.(Pumps, -- 2 2 0.083333333 0.11%
Engines)
Waiting / Shut -- 15 616 631 26.29166667 33.82%
Down
Control
(Gas/Oil/Water -- 55.75 55.75 2.322916667 2.99%
Flow)
Squeeze cmt/wtr -- 0 0 0.00%
inject. test
Lost
Circulation/Cure -- 42.25 42.25 1.760416667 2.26%
losses
Trip OEDP -- 13.75 13.75 0.572916667 0.74%
Cement Plug -- 8.25 8.25 0.34375 0.44%
WOC Plugs -- 17 17 0.708333333 0.91%
Fishing -- 89.75 89.75 3.739583333 4.81%
Drill out CMT -- 3 3 0.125 0.16%
plugs
Circ. to Check -- 4 4 0.166666667 0.21%
Loss
Total Lost Time -- 866.75 36.11458333 46.46%
Grand Total -- 1865.5 77.72916667 100.00%
Time

34
FINAL WELL REPORT
KAR COMPANY
DRILLING NEW WELLS
KHURMALA DOME FIELD
WELL NO: KDN-16 (K-442)
FIELD DIVISION
WELL LOCATION (SX)

Figure 3.2: Productive Time

35
FINAL WELL REPORT
KAR COMPANY
DRILLING NEW WELLS
KHURMALA DOME FIELD
WELL NO: KDN-16 (K-442)
FIELD DIVISION
WELL LOCATION (SX)

Figure 3.3: Non-Productive Time

36
FINAL WELL REPORT
KAR COMPANY
DRILLING NEW WELLS
KHURMALA DOME FIELD
WELL NO: KDN-16 (K-442)
FIELD DIVISION
WELL LOCATION (SX)

Figure 3.4: Total Time

37
FINAL WELL REPORT
KAR COMPANY
DRILLING NEW WELLS
KHURMALA DOME FIELD
WELL NO: KDN-16 (K-442)
FIELD DIVISION
WELL LOCATION (SX)

3.15. Wellhead and x-mass tree assembly Data:

Table 3.15: Wellhead and X-mass Tree Assembly Data

Item Description Quant.


X-Mass Tree ASSY ( Delta corporations)
 Swab Valve- 1Gate Valve API-6A 4 1/16’’ - 3000 Psi, (R-37).
 Master Valves-2 Gate Valves API-6A 4 1/16’’ -3000 Psi
(R-37). 5
Section D  Kill Wing-2Gate Valve API-6A 4 1/16’’– 3000 Psi, (R-37)
 Production Wing-2 Gate Valves API6A4 1/16’’-3000 Psi,
(R-37).
Tubing Head Adapter: 7 1/16’’ 3000psi(R-45) x 4 1/16’’ 3000psi
(R-37)
Tubing Head Spool
11” 3000psi(R-53) x 7 1/16’’3000 Psi (R-45)
Section C With 2 outlets: 4
 2 Gate valves 2 1/16’’- 5000 Psi (R-24).
 1 Gate Valves 2 1/16”- 5000 Psi (R-24).
Double stand adapter: 11’’ 5000 psi x 11’’ 3000psi
Casing head spool: 13 5/8”-5000 psi (BX-160) x 11” -5000 Psi
(R-54).
Section B With 2 outlets: 1
 1 Gate vale 2 1/16”-5000 Psi (R-24).
 1 flange 2 1/16”-5000 Psi (R-24) Plugged by bull plug.
Casing Head Housing
13 5/8" -5000 Psi,(BX-160), Thread type(BTC).
Section A With 2 outlets: 1
 1 Gate vale 2 1/16”-5000 Psi (R-24).
 1 flange 2 1/16”-5000 Psi (R-24) Plugged by bull plug.

38
FINAL WELL REPORT
KAR COMPANY
DRILLING NEW WELLS
KHURMALA DOME FIELD
WELL NO: KDN-16 (K-442)
FIELD DIVISION
WELL LOCATION (SX)

4. Formation Evaluation
4.1. Introduction
Well K- 442 (KDN-16) is a vertical well drilled by GYP Company on behalf of KAR Group in
Khurmala Field. The objective of the well was to evaluate, test and complete the well as an Oil
producer from Tertiary reservoir.
The objective of the formation evaluation is to get following information:-
 Petrophysical analyses.
 Estimate formation tops.
 Stratigraphic and Structural analyses.
 Geometry and deviation of the well.
4.2. Abbreviations of Wireline Logging Tools

Table 4.1: abbreviation list of wireline logging tools

Abbreviation Logging Tool


GR Gamma Ray
CCL Casing Collar Locator
CBL Cement Bond Log
VDL Variable Density Log
FMI Formation Micro Imager Log
SS Sonic Scanner
PPC Multipurpose, four-arm powered Caliper
PEX Platform Express “HGNS, TLD, MC
HRLA High Resolution Laterolog Array
MCFL Micro Cylindrically Focused Log
USIT Ultra-Sonic Imager Tool
GPIT General-Purpose Inclinometer Tool

4.3. Wireline Logging Runs Summary


This section covers all the wireline operations had executed by Schlumberger that includes open hole
and cased hole logs.
4.3.1. Open Hole Section 12 1/4"

Table 4.2: Wireline Logging Summary for 12 1/4" (Open Hole) Section

Wireline Logging Summary for 12 1/4" (Open Hole) Section


Log Type Survey Interval (m) Date
GR, Sonic & 6 Arms Caliper 400- 885 2-AUG-2017

39
FINAL WELL REPORT
KAR COMPANY
DRILLING NEW WELLS
KHURMALA DOME FIELD
WELL NO: KDN-16 (K-442)
FIELD DIVISION
WELL LOCATION (SX)
4.3.2. Casing Section 9 5/8"

Table 4.3: Wireline Logging Summary for 9 5/8" (Cased Hole) Section

Wireline Logging Summary for 9 5/8" (Cased Hole) Section

Log Type Survey Interval (m) Date


GR, CCL & CBL/VDL, USIT 40 - 877 7-AUG-2017

4.3.3. Open Hole Section 8.5"

Table 4.4: Wireline Logging Summary for 8.5" (Open Hole) Section

Wireline Logging Summary for 8 1/2" (Open Hole) Section

Log Type Survey Interval (m) Date


GR & 6 Arms Caliper 884 – 1085 29-AUG-2017
GR, SS & FMI 884 – 1076 29-AUG-2017
GR, PEX & HRLA 884 - 1078 29-AUG-2017

4.3.4. Casing Section 7"

Table 4.5: Wireline Logging Summary for 7" (Cased Hole) Section

Wireline Logging Summary for 7" (Cased Hole) Section

Log Type Survey Interval (m) Date


GR, CCL, CBL/VDL &
30 - 1055 10-SEP-2017
USIT

4.3.5. Casing Section 7" (Perforation Operation)


Table 4.6: Wireline Logging Summary for 7" (Cased Hole, Perforation) Section

Perforation Operations Summary For 7" (Cased Hole) Section


Phasing Shot Perforation
Gun System Name Angle Density Interval
Date
(DEG) (PSF) (MRTKB)
4-1/2" HSD, Power Jet 1013 – 1006
Omega 1006 - 999
72 5 8-Oct-2017
4505, HMX 999 - 993
40
FINAL WELL REPORT
KAR COMPANY
DRILLING NEW WELLS
KHURMALA DOME FIELD
WELL NO: KDN-16 (K-442)
FIELD DIVISION
WELL LOCATION (SX)

4.4. Open Hole Logging Results and Discussion


Formation evaluation was carried out in two sections (12.25" & 8.5").
Lithology and porosity computation have been done using Density, Neutron, Compressional slowness
(Sonic log) and Gamma ray logs.
Saturation computations have been done using conventional evaluation with three different salinities
(30, 50, & 82) kppm for Tertiary and Cretaceous reservoir. Moreover, it was calculated via Archie’s
equation and the following factors were used in the equation:-
 Cementation factor M=2.
 Saturation exponent N=2.
 Formation resistivity factor (Tortuosity) factor A=1.
Gas presence in the formation where identified from density-neutron measurement.

4.4.1. 1st Section 12 1/4" Open hole (Lower Fars):-


Wireline logging operation was carried out in this section to get lithology and hole & annular volumes
for cementing operation after running casing.

4.4.2. 2nd Section 8.5" Open hole (Tertiary Reservoir):-


This survey has covered the main limestone formation (884 – 1085) mRTKB. Starting with Avanah
Dense Formation which is mainly composed of limestone and average porosity is 0.1 and average
saturation 0.46. Avanah Porous which is mainly composed of limestone and dolomite with average
porosity 0.22 and average saturation 0.18. Khurmala A formation composed of Massive dolomite and
average porosity is 0.28 and average saturation 0.27 also contains Vugs and Fractures.
The maximum deviation in this section is 8.2 degree at 963 m RTKB.

4.5. Hydrocarbon / Fluid Contacts Indication

Table 4.7: Tertiary Fluid Contact

Reservoir Formations G.O.C. (m) O.W.C. (m)


Tertiary (Avanah & 954 1055
Khurmala)

41
FINAL WELL REPORT
KAR COMPANY
DRILLING NEW WELLS
KHURMALA DOME FIELD
WELL NO: KDN-16 (K-442)
FIELD DIVISION
WELL LOCATION (SX)

4.6. Well Correlation/Log Data

Figure 4.1: location of SX well on the top of Avanah Dense formation Map

42
FINAL WELL REPORT
KAR COMPANY
DRILLING NEW WELLS
KHURMALA DOME FIELD
WELL NO: KDN-16 (K-442)
FIELD DIVISION
WELL LOCATION (SX)

Figure 4.2: vertical and horizontal cross section

43
FINAL WELL REPORT
KAR COMPANY
DRILLING NEW WELLS
KHURMALA DOME FIELD
WELL NO: KDN-16 (K-442)
FIELD DIVISION
WELL LOCATION (SX)

Figure 4.3: horizontal correlation between wells (K-442, K-306 and K-153)

44
FINAL WELL REPORT
KAR COMPANY
DRILLING NEW WELLS
KHURMALA DOME FIELD
WELL NO: KDN-16 (K-442)
FIELD DIVISION
WELL LOCATION (SX)

4.7. Formation Evaluation


Note/
CPI is located in appendix F (Formation Evaluation)

According to CPI interpretation results are summarized in the below table:

Table 4.8: petrophysical properties of the formations

Average Avg. Water


Formation PHIE saturation Main lithology Remarks

Avanah Losses
Dense
0.1 0.46 Limestone
zone
Avanah Limestone, Vugs and
Porous
0.22 0.18
dolomite fractures
Vugs and
Khurmala A 0.27 0.28 Massive dolomite
fractures

4.8. Cement Bond Log Evaluation


4.8.1. Cased Hole 9 5/8"

Table 4.9: Wireline Logging Summary log evaluation for 9 5/8" (Cased Hole)
Section

Wireline Logging Summary log evaluation for 9 5/8" (Cased Hole) Section
Log Type Date Survey Interval (m) Quality of the log
Bad cement
40-95
Good cement
95-210
GR, CCL, & Medium cement
7-AUG-2017 210-280
CBL/VDL Good to medium
280-875
cement

4.8.2. Cased Hole 7"

Table 4.10: Wireline Logging Summary log evaluation for 7" (Cased Hole) Section

Wireline Logging Summary log evaluation for 7" (Cased Hole) Section

Log Type Date Survey Interval (m) Quality of the log


GR, CCL, 30-840 Very good cement
CBL/VDL & USIT 10-SEP-2017 840-955 Free pipe
955-1055 Very good cement

45
FINAL WELL REPORT
KAR COMPANY
DRILLING NEW WELLS
KHURMALA DOME FIELD
WELL NO: KDN-16 (K-442)
FIELD DIVISION
WELL LOCATION (SX)

5. Petroleum Engineering
5.1. Final Well Sketch

Logging Data: Lithology Descriptions


121/4" OH Section: Upper/Middle Fars Fm
(GR, Sonic, 6 Arms Alternating of sandstone, clay
Caliper) stone (mudstone) siltstone and
anhydrite nodules.
Sand stone: vary colored,
81/2" OH Section: moderately hard to hard, fine to
(GR, 6 Arms Caliper, medium grain, rounded to sub
SS, FMI, PEX & rounded, sub angular in part,
HRLA) spherical, misrouted, argillaceous
matrix,
95/8" & 7" CH Section: Top of Lower Fars formation
(GR, CBL, VDL, CCL, URB@ 632m RTKB/ Wireline
top @657m
USIT)
Alternating of clay stone
(mudstone) siltstone, Anhydrite
Core Intervals: N/A and Marly Limestone.
Top of Seepage bed @682m
Completion Data: RTKB
/Wireline top @716m
Perforation Data: Mainly Limestone, Anhydrite,
Gun System: Claystone
Top of Saliferous Bed @746m
4-1/2" HSD, Power Jet
RTKB/ Wireline tops @748m
Omega Mainly Salt, Anhydrite, Claystone
4505, HMX Salt (Halite): White to colorless,
Phasing Angel: crystalline, transparent,
72° translucent, slightly hard, pure.
Shot Density: Top of Transition Bed @858m
5 spf RTKB/ Wireline top @877m
Perforation Intervals Mainly Limestone, Anhydrite
Top of BFC Bed @902 m RTKB/
(mRTKB):
Wireline top @902 m
1013 – 1006 Cong. Limestone,
1006 - 999 Top of Avana Dense E1 @906m
999 – 993 RTKB/ Wireline top @906
Petroleum Data: Mainly Limestone
Tubing: 4 1/2" VT - L- With strong gas show blind drilling
80, 11.6 ppf f/872 to 929m, no return on shale
TH: @ 9.26 m shaker.
SSD: @ 950.460 m
Top Avana Porous E2 by
Packer:7" BC packer Wireline top @992 m RTKB
TH, @964.230 Mainly Limestone,
WX N: 4 ½’’ VT, Blind Drilling with water
@977.580m No return f/929m t/980m, GOC
WXN N: 4 ½’’, VT, @955m
@981.250 m Top Khurmala E4a by Wireline
WRG: @983.76 top @1041m
Limestone, Dolomite, siltstone,
Tubing End: @984.06
Blind Drilling f/1070m t/1105m
with water
F/1105 t/ 1120 cutting return,
Siltstone, Dolomite,
OWC @1044m / wireline
@1030m
Stop drilling @ 1089 m

Figure 5.1: Final Well Sketch

46
FINAL WELL REPORT
KAR COMPANY
DRILLING NEW WELLS
KHURMALA DOME FIELD
WELL NO: KDN-16 (K-442)
FIELD DIVISION
WELL LOCATION (SX)

5.2. Well Completion Diagram

Figure 5.2: Final Completion Diagram

47
FINAL WELL REPORT
KAR COMPANY
DRILLING NEW WELLS
KHURMALA DOME FIELD
WELL NO: KDN-16 (K-442)
FIELD DIVISION
WELL LOCATION (SX)

5.3. Well Flowing Events


After finishing the Perforation Job, the Final Completion (TBG) Design RIH:
 RIH Final Completion (4 ½" Vam Top L-80, 12.6 Lbs./ft. W / WEG, WXN Nipple, Perforated
Joint, WX Nipple, (7" black cat Packer, SSD) from surface to 953 m.
 Circulation & Displaced mud by 130 bbl. Completion fluids density 1.02 sp. /gr.
 Set 4 1/2"tubing hanger in 7" tubing head total weight 60 kIb.
 N/D BOP. N/U X-tree.
 Install SL lubricator on 4 1/16" Dump valve, RIH with SL, to retrieve Plug and prong.
 RIH with shifting tools to retrieve prong and plug.
 POOH and L/D SL lubricator.
 Bullhead 60 bbl. Diesel, using rig pump, initial pumping pressure 1000 psi, final pumping
pressure 200 psi.
 Close X-mass tree valves, monitoring pressure build up. Zero @6:00.

Continue RIH Final Completion and Set PKR


 RIH with shifting tools to equalize pressure & retrieve prong and plug.
 PO Bullhead 60 bbl. Diesel, using rig pump, initial pumping pressure 1000 psi, final pumping
pressure 200 psi OH and L/D SL lubricator.
 Close X-mass tree valves, monitoring pressure build up. Zero @6:00.
 Well closed for build up pressure .static zero psi on both tbg. & annulus
 Bullhead 67bbls diesel by rig pump. Closed the well.
 L/U to and opened the well to flow. Observed light flow of diesel &brine .no change in flow
rate. Closed the well.
 Pumped extra 45 bbls diesel using the rig pumps @800psi and closed the well.
 Well static no pressure build up.
 Opened the well to flow. Light flow of brine &diesel in the burning pit.
 Observed change in the flow to crude oil &brine. Increase in flow rate.
 Continue flowing the well to burning pit. Observe wellhead press. Last reading 120 psi on TBG
zero on annulus.
 Continue flowing the well to burning pit. Observe wellhead press. Last reading 120 psi on TBG
zero on annulus.
 Continue flowing the well @ full open choke. Pressure on TBG 125psi. Pressure on annulus
zero. Obtained product samples. Every 0.5 hour.

48
FINAL WELL REPORT
KAR COMPANY
DRILLING NEW WELLS
KHURMALA DOME FIELD
WELL NO: KDN-16 (K-442)
FIELD DIVISION
WELL LOCATION (SX)
 Changed choke to 64. Pressure on TBG 150 – 170 psi. cont. Take samples analyzed by KAR
(API = 33.9 , w = 0.1)
 Changed choke to 48. Continue well cleaning .pressure on TBG 230 psi.
 Choke @ 32 pressures 350psi.
 Continue flowing the well .with choke size 64. Pressure on TBG160 psi.

49
FINAL WELL REPORT
KAR COMPANY
DRILLING NEW WELLS
KHURMALA DOME FIELD
WELL NO: KDN-16 (K-442)
FIELD DIVISION
WELL LOCATION (SX)

5.4. Wellhead and XMT Diagram

Figure 5.3: Wellhead and XMT Diagram

50
FINAL WELL REPORT
KAR COMPANY
DRILLING NEW WELLS
KHURMALA DOME FIELD
WELL NO: KDN-16 (K-442)
FIELD DIVISION
WELL LOCATION (SX)

5.5. Acidizing
Acid Job Data:

 R/U Testing package 100% completed, mixing acid 170bbl.


 Open master valve, wellhead pressure 530psi.
 Pump 30 bbl. of spacer+ nitrogen, with rate of 6bbl/min, initial pressure on wellhead 800 psi,
start pumping 170 bbl. acid20%+ nitrogen, with rate of 6.5bbls/min pumping pressure on well
head.
 480 psi, pump 60 bbl. pre-flash + N2, pumping pressure final pumping pressure 400 psi, dis
place by 80 bbl. acid pumping pressure on well head 380 psi.
 Close well to suck, 45 mint, wellhead pressure 550 psi.
 Flow the well, full open 2” to clean, wellhead pressure 325 Psi.

51
FINAL WELL REPORT
KAR COMPANY
DRILLING NEW WELLS
KHURMALA DOME FIELD
WELL NO: KDN-16 (K-442)
FIELD DIVISION
WELL LOCATION (SX)

5.6. Field Measurements


Table 5.1: Field Measurement Survey

Default Gradient (psi/ft) 0.3396 Tertiary Oil Gradient

K-442 (KDN-16)

01-02-03-04/11/2017

Press. Survey (Close) Press. Survey (Flow) ΔP (Pws-Pwf)

Depth, m (G.L.) G.L., m BHT, C


Depth, ft (G.L.) BHCIP, Psia Gard. (psi/ft) Depth, m MSL BHFP, Psia Gard. (psi/ft)

0 366.669 311.593 43.016

3020 1102.746 0.243734106 920.5071934 345 575.5071934 1086.85 0.256707616 40.422

3050 1113.016 0.342333333 929.6513046 345 584.6513046 1097.094 0.341466667 42.299

3080 1123.306 0.343 938.7954158 345 593.7954158 1107.187 0.336433333 44.084

3110 1133.648 0.344733333 947.9395269 345 602.9395269 1117.29 0.336766667 45.712

3140 1143.839 0.3397 957.0836381 345 612.0836381 1127.294 0.333466667 46..995

3170 1154.574 0.357833333 966.2277493 345 621.2277493 1137.609 0.343833333 48.026

0.364218927 0 345 -345 0.358867192 48.517 16.545


0 345 48.594

0 345 48.611

0 345 48.667

0 345 48.789
1163.80069 @ 1147.26 @ Datum
3198.78 975 345 630
Datum Level Level
WHCIP (psig ) WHFP (psig) WHCIP (barg) WHFP (barg) WHFT (°F) WHFT (°C) BHCIP (barg) BHFP ( Barg)
Well Head Data
378 309 26.07 22 109.43 43 80.3 79.12

52
FINAL WELL REPORT
KAR COMPANY
DRILLING NEW WELLS
KHURMALA DOME FIELD
WELL NO: KDN-16 (K-442)
FIELD DIVISION
WELL LOCATION (SX)

5.7. Surface Well Testing Summary


Table 5.2: Surface Well Test Summary

Field name: Khurmala Well KDN-16 (K-442) Formation Avanah

RTKB GL: Rig name: GYP-08 Date 29/OCT- 1/NOV-2017

SWT Data Summary

WHFP Choke Manifold Pressure SWT Data Fluid Properties


Choke (TBG Testing
Date
Size Flowing Period
Oil
Pressure) Downstrea Gas
Upstream (Liquid) Gas Rate GOR H2S CO2 BS&W Oil API
m Gravity
Rate
dd/mm/yy /64" psig psig psig hrs STB/day Mscf/day scf/bbl % % % API 60 Air=1.0

29-Oct-17 32 308.00 308.00 119.90 20 1461.50 388.37 294.6 3.1 6.90 0.00 32.70 0.971

30-Oct-17 48 300.00 300.00 172.90 12 2149.70 559.32 297 3.5 4.00 0.00 31.00 0.972

30-Oct-17 64 283.90 283.90 223.80 11 3901.10 757.16 242 5.4 5.90 0.00 31.30 0.974

31-Oct-17 96 258.40 258.40 235.70 12 6400.80 997.97 207 6.1 6.00 0.00 31.20 0.973

11+1:13/1/2017 128 264.00 264.00 252.40 11 6908.00 1015.00 203 7.0 7.30 0.00 31.30 0.975

53
FINAL WELL REPORT
KAR COMPANY
DRILLING NEW WELLS
KHURMALA DOME FIELD
WELL NO: KDN-16 (K-442)
FIELD DIVISION
WELL LOCATION (SX)

6. Healthy Safety & environment


6.1. Duties and Activities:
During Drilling operation at Well Location K-442/KDN-16 (SX), we were following all safety rules
and KAR Policy, we tried to build safety culture and share our knowledge with each other. We as KAR
Company HSE Engineers did the following points at the well site before starting the operation:
 Safety meeting before starting job (giving safety instructions and advised the crew about the
hazards they might face), and secured communication between KAR and Service companies.
 Preparing all safety equipment before starting job.
 Plan for evacuating in case of fire, Gas kick or any accident.
 Keep monitoring the operations, and make sure they are done according to safety standards.

6.2. HSE equipment at well location:


Table 6.1: HSE equipment at well site

Item Equipment Availability Remarks

Monitoring the crew during work, and make sure they all wearing
PPE (coverall, safety helmets, safety boots and goggles, and coveralls, H2S personal
boot, helmet, safety detector should be held at the rig floor, cellar, and mud tank.
goggles, personal gas There was no special plastic coverall for chemical area.
detector, chemical No one was allowed to work at high areas without wearing body
1 mixing mask and Available harness to prevent falling injuries.
plastic coverall, Ear plugs should be worn near high voices areas, such as near
welding mask, body generators and pumps.
harness, gloves, ear KAR crew did not have proper night shift PPE, they should wear
plugs) reflective coveralls, that be visual at night and didn’t have H2S
Detector

There was no enough fire extinguishers in camp all filled and


Fire extinguishers Available visually checked, but the extinguishers should have been checked
2
periodically every 6 months by an expert company.

There were enough breathing apparatuses at the location offices,


3 Breathing apparatus Available
at the muster points, and two at the rig floor
Breathing lines and There was two manifold at the rig floor, there was one breathing
4 Available
manifolds line on mud tank and at the cellar
There were detectors at the rig floor, shell shaker and cellar, all
H2S and LEL
5 Available working fine and periodically calibrated by GYP H2S engineer.
detectors and alarm
It's also necessary to put detectors on mud tank
There were enough wind socks, that was visible from any point at
6 Wind socks Available
the location
7 HSE warning signs Available there were few warning signs, but they were not enough
Washing station at There was a washing station that contain a shower dosh and eye
8 Available
the mixing tank wash, working properly
9 H2S Level flag Not Available ---

54
FINAL WELL REPORT
KAR COMPANY
DRILLING NEW WELLS
KHURMALA DOME FIELD
WELL NO: KDN-16 (K-442)
FIELD DIVISION
WELL LOCATION (SX)
Recommendations:
 Provide night shift reflective coveralls for KAR staff, to prevent accidents at night.
 Schedule fire extinguishers check every 6 months, should be sent to an expert company.
 Should provide enough breathing apparatuses, for all the staff.
 H2S detector for the crew.
 Should put more HSE warning signs around the location.
6.3. Observation and Cases:

Table 6.2: HSE Observations and Cases at well site

Item Case Condition Notes

H2S Unsolved There was no rescue team and lack of H2S drill
1
Water and mud pits, The pits were barricaded by a barricading tape,
2 were not properly Unsolved while it should have been barricaded by a suitable
barricaded fence, that protect the crew from falling into them
Not enough warning there were few warning signs, but they were not
3 Unsolved
signs enough
Each location need special pit for dumping waste
Dumping pit Unsolved
4 contaminated liquids

5 Each location need checkpoint for control POB


checkpoint unsolved
and secure location

6.4. Hygiene and environmental health:


Every day checking on personal and location hygiene, offices, bed rooms, and restaurant, we always
inducted the crew to keep the location clean, and throw garbage in the trash bins, every day a truck
came to collect trashes.
Spilled dangerous and slippery materials such as oil, diesel, and chemicals, were instructed to be
cleaned immediately, as it is dangerous and may cause accident and injuries.
Toilets were not in good situations.

6.5. Confined spaces:


Dealing with confined spaces, such as cleaning or welding tanks, is one of the jobs that requires
permission before starting, as it is dangerous and may contain toxic gases, or lacks for oxygen, we
always checked before letting anyone start the job, using multi-gas detector, to make sure there is toxic
gases, and there is enough oxygen percentage.

55
FINAL WELL REPORT
KAR COMPANY
DRILLING NEW WELLS
KHURMALA DOME FIELD
WELL NO: KDN-16 (K-442)
FIELD DIVISION
WELL LOCATION (SX)

6.6. Hazardous jobs:


 Loading, and unloading equipment and materials: requires work permission, after checking
driver license, forklift and crane inspection, and lifting cables check, keep monitoring the
lifting job, and prevent anyone from standing under or above the lifted weight, to prevent injury
incase weight falling.
 High pressure test: safety meeting before test pressure test job, explaining to crew the hazards
of the jobs, and instruct them not to go near the high pressure area, barricading the area to
prevent anyone from entering the area, and check pressure pipes and make sure it had protection
line between every joint.
 Perforation job: safety meeting before job to explain the hazards of job, instruct them turn off
any electronic device, that uses radio signals, as it may trigger the explosives used during job,
also barricading the area to prevent anyone from going near the place.

6.7. Hazardous incidents:


 There was accident one of the GYP' Crew was bitten by dog, and immediately
took the person to the hospital.
6.8. Safety drills and inductions:
 H2S induction was given to all KAR and GYP staffs, by GYP' H2S engineer, explaining to
them H2S properties and hazards, and how to act and use the breathing apparatus, in case the
gas released.
 H2S drills were performed at the location.

56
FINAL WELL REPORT
KAR COMPANY
DRILLING NEW WELLS
KHURMALA DOME FIELD
WELL NO: KDN-16 (K-442)
FIELD DIVISION
WELL LOCATION (SX)

7. Appendices:
7.1. Appendix P (Casing Tallies)

Legend of Special Symbols

Stop Collar © Centralizer Ѫ


7.1.1. 13 3/8" Casing Tally

Table P.1: 13 3/8" Casing Tally

13 3/8" J55-Casing (54.5 ppf) ID OF J55 (54.5 ppf) = 12.615 Capacity of J55 Casing (bbl/ft) = 0.15459

Thread Net Length Total Upper End


Serial Centralizer/ Length
Casing No. Length (W/Out Length Of Casing
No Cement Basket (m)
(m) Thread) (m) (m) (m)
FS 0.56 0.56 406.44
1 1 11.30 0.122 11.18 11.74 395.26
FC 0.49 12.23 394.77
2 3 11.43 0.122 11.31 23.54 383.46
3 4 © 11.62 0.122 11.50 35.03 371.97
4 5 11.63 0.122 11.51 46.54 360.46
5 6 © 11.64 0.122 11.52 58.06 348.94
6 7 11.68 0.122 11.56 69.62 337.38
7 8 11.35 0.122 11.23 80.85 326.15
8 9 11.59 0.122 11.47 92.31 314.69
9 10 11.48 0.122 11.36 103.67 303.33
10 11 11.42 0.122 11.30 114.97 292.03
11 12 © 11.67 0.122 11.55 126.52 280.48
12 13 11.19 0.122 11.07 137.59 269.41
13 14 11.19 0.122 11.07 148.65 258.35
14 15 11.59 0.122 11.47 160.12 246.88
15 16 11.29 0.122 11.17 171.29 235.71
16 17 11.63 0.122 11.51 182.80 224.20
17 18 11.35 0.122 11.23 194.03 212.97
18 19 © 11.38 0.122 11.26 205.28 201.72
19 20 11.53 0.122 11.41 216.69 190.31
20 21 11.44 0.122 11.32 228.01 178.99
21 22 11.62 0.122 11.50 239.51 167.49
22 23 11.03 0.122 10.91 250.42 156.58
23 24 11.40 0.122 11.28 261.69 145.31
24 25 11.40 0.122 11.28 272.97 134.03
25 26 11.43 0.122 11.31 284.28 122.72
26 27 © 11.36 0.122 11.24 295.52 111.48
27 28 11.04 0.122 10.92 306.44 100.56
28 29 11.63 0.122 11.51 317.94 89.06
29 30 11.05 0.122 10.93 328.87 78.13
30 31 11.48 0.122 11.36 340.23 66.77
31 32 11.52 0.122 11.40 351.63 55.37
32 33 © 11.05 0.122 10.93 362.56 44.44
33 34 11.45 0.122 11.33 373.88 33.12
34 35 11.48 0.122 11.36 385.24 21.76
35 36 © 11.28 0.122 11.16 396.40 10.60
36 2 11.71 0.122 11.59 407.99 -0.99

57
FINAL WELL REPORT
KAR COMPANY
DRILLING NEW WELLS
KHURMALA DOME FIELD
WELL NO: KDN-16 (K-442)
FIELD DIVISION
WELL LOCATION (SX)
7.1.2. 9 5/8" Casing Tally:

Table P.2: 9 5/8" Casing Tally

Well K-442 (KDN-16) TD = 887 FS (m) = 884.5


Date 03/08/2017 Rate H (m) = 2.5
9 5/8'' J55-Casing 40 ppf 9 5/8" L80-Casing 43.5 ppf
ID = 8.835'' Capacity (bbl/ft) = 0.0758 ID = 8.755'' Capacity (bbl/ft) = 0.074
Burst(psi) = 3950 Collapse(psi) = 2514 Burst(psi) = 6327 Collapse(psi) = 3809
Net Length Total Upper
Serial Casing Centralizer/ Length Thread
Grade (w/out Length End of
No. No. Cement Basket (m) Length (m)
Thread) (m) (m) Casing (m)
FS 0.57 0.57 883.93
1 1 © Ѫ L-80 11.49 0.122 11.37 11.94 872.56
FC 0.50 12.44 872.06
2 2 L-80 11.17 0.122 11.05 23.49 861.01
3 3
© L-80 11.43 0.122 11.31 34.79 849.71
4 4 L-80 11.39 0.122 11.27 46.06 838.44
5 5
© L-80 11.24 0.122 11.12 57.18 827.32
6 6 L-80 11.35 0.122 11.23 68.41 816.09
7 7 L-80 11.05 0.122 10.93 79.34 805.16
8 8 L-80 11.72 0.122 11.60 90.93 793.57
9 9 L-80 11.51 0.122 11.39 102.32 782.18
10 10 L-80 10.65 0.122 10.53 112.85 771.65
11 11
© L-80 11.55 0.122 11.43 124.28 760.22
12 12 L-80 11.50 0.122 11.38 135.66 748.84
13 13 L-80 11.70 0.122 11.58 147.23 737.27
14 14 L-80 11.21 0.122 11.09 158.32 726.18
15 15 L-80 11.60 0.122 11.48 169.80 714.70
16 16 L-80 11.34 0.122 11.22 181.02 703.48
17 17 L-80 11.65 0.122 11.53 192.55 691.95
18 18
© L-80 11.50 0.122 11.38 203.92 680.58
19 19 L-80 11.44 0.122 11.32 215.24 669.26
20 20 L-80 11.56 0.122 11.44 226.68 657.82
21 21 L-80 11.70 0.122 11.58 238.26 646.24
22 22 L-80 11.65 0.122 11.53 249.79 634.71
23 23 L-80 11.72 0.122 11.60 261.38 623.12
24 24 L-80 11.58 0.122 11.46 272.84 611.66
25 25 L-80 11.54 0.122 11.42 284.26 600.24
26 26
© L-80 11.44 0.122 11.32 295.58 588.92
27 27 L-80 11.58 0.122 11.46 307.04 577.46
28 28 L-80 11.61 0.122 11.49 318.52 565.98
29 29 L-80 11.51 0.122 11.39 329.91 554.59
30 30 L-80 11.65 0.122 11.53 341.44 543.06
31 31 L-80 11.52 0.122 11.40 352.84 531.66
32 32
© L-80 11.40 0.122 11.28 364.12 520.38

58
FINAL WELL REPORT
KAR COMPANY
DRILLING NEW WELLS
KHURMALA DOME FIELD
WELL NO: KDN-16 (K-442)
FIELD DIVISION
WELL LOCATION (SX)
33 33 L-80 11.66 0.122 11.54 375.65 508.85
34 34 L-80 11.51 0.122 11.39 387.04 497.46
35 35 L-80 11.46 0.122 11.34 398.38 486.12
36 36 L-80 11.67 0.122 11.55 409.93 474.57
37 37 L-80 11.73 0.122 11.61 421.54 462.96
38 38 J-55 11.71 0.122 11.59 433.12 451.38
39 39 J-55 11.69 0.122 11.57 444.69 439.81
40 40 J-55 11.62 0.122 11.50 456.19 428.31
41 41 J-55 11.69 0.122 11.57 467.76 416.74
42 42 J-55 11.69 0.122 11.57 479.33 405.17
43 43
© J-55 11.43 0.122 11.31 490.63 393.87
44 44 J-55 11.63 0.122 11.51 502.14 382.36
45 45 J-55 11.57 0.122 11.45 513.59 370.91
46 46 J-55 11.46 0.122 11.34 524.93 359.57
47 47 J-55 11.57 0.122 11.45 536.38 348.12
48 48 J-55 11.63 0.122 11.51 547.88 336.62
49 49 J-55 11.63 0.122 11.51 559.39 325.11
50 50 J-55 11.58 0.122 11.46 570.85 313.65
51 51 J-55 11.62 0.122 11.50 582.35 302.15
52 52
© J-55 11.63 0.122 11.51 593.86 290.64
53 53 J-55 11.52 0.122 11.40 605.25 279.25
54 54 J-55 11.62 0.122 11.50 616.75 267.75
55 78 J-55 11.72 0.122 11.60 628.35 256.15
56 56 J-55 11.56 0.122 11.44 639.79 244.71
57 57 J-55 11.51 0.122 11.39 651.18 233.32
58 58 J-55 11.43 0.122 11.31 662.48 222.02
59 59 J-55 11.40 0.122 11.28 673.76 210.74
60 60 J-55 11.55 0.122 11.43 685.19 199.31
61 61 J-55 11.62 0.122 11.50 696.69 187.81
62 62 J-55 11.10 0.122 10.98 707.67 176.83
63 63
© J-55 11.63 0.122 11.51 719.17 165.33
64 64 J-55 11.63 0.122 11.51 730.68 153.82
65 65 J-55 11.71 0.122 11.59 742.27 142.23
66 66 J-55 11.70 0.122 11.58 753.85 130.65
67 67 J-55 11.61 0.122 11.49 765.34 119.16
68 68 J-55 11.55 0.122 11.43 776.76 107.74
69 69
© J-55 11.57 0.122 11.45 788.21 96.29
70 70 J-55 11.64 0.122 11.52 799.73 84.77
71 71 J-55 11.62 0.122 11.50 811.23 73.27
72 72 J-55 11.53 0.122 11.41 822.64 61.86
73 73 J-55 11.54 0.122 11.42 834.05 50.45
74 74
© J-55 11.49 0.122 11.37 845.42 39.08
75 75 J-55 11.62 0.122 11.50 856.92 27.58
76 76
© J-55 11.40 0.122 11.28 868.20 16.30
77 77 J-55 11.73 0.122 11.61 879.81 4.69
78 Pup-Joint J-55 5.97 0.122 5.85 885.65 -1.15

59
FINAL WELL REPORT
KAR COMPANY
DRILLING NEW WELLS
KHURMALA DOME FIELD
WELL NO: KDN-16 (K-442)
FIELD DIVISION
WELL LOCATION (SX)
7.1.3. 7" Casing tally

Table P.3: 7" Casing Tally

Well K-442 (KDN-16) TD = 1089 FS (m) = 1085.5


Date 05/09/2017 Rate H (m) = 3.5
7" L-80 26 PPF
ID = 6.276" Capacity (bbl/ft) = 0.12552 Burst(psi) = 7240 Collapse(psi) = 5410
Net
From Total Upper End
Run Centralizer/Cement Length Thread Length
Bottom Length Of Casing
# Basket (m) Length (m) (w/out
To Top (m) (m)
thread) (m)
FS 0.47 0.47 1085.03
1 95 © 11.42 0.115 11.31 11.78 1073.73
2 94 © 11.52 0.115 11.41 23.18 1062.32
FC 0.40 23.58 1061.92
3 93 11.53 0.115 11.42 35.00 1050.51
4 92 © 11.48 0.115 11.37 46.36 1039.14
5 91 11.42 0.115 11.31 57.67 1027.84
6 90 11.47 0.115 11.36 69.02 1016.48
7 89 © 11.43 0.115 11.32 80.34 1005.17
8 88 11.45 0.115 11.34 91.67 993.83
9 87 11.52 0.115 11.41 103.08 982.43
10 86 11.36 0.115 11.25 114.32 971.18
11 85 © 11.52 0.115 11.41 125.73 959.78
12 84 Cement Basket 11.52 0.115 11.41 137.13 948.37
13 83 11.30 0.115 11.19 148.32 937.19
14 82 11.46 0.115 11.35 159.66 925.84
15 81 11.42 0.115 11.31 170.97 914.54
16 80 11.41 0.115 11.30 182.26 903.24
17 79 11.18 0.115 11.07 193.33 892.18
18 78 © 11.43 0.115 11.32 204.64 880.86
19 77 11.33 0.115 11.22 215.86 869.65
20 76 11.77 0.115 11.66 227.51 857.99
21 75 © 11.81 0.115 11.70 239.21 846.30
ACP 5.08 5.08 244.29 841.22
DV 0.69 0.69 244.98 840.53
22 74 © 11.79 0.115 11.67 256.65 828.86
23 73 11.52 0.115 11.41 268.05 817.45
24 72 11.43 0.115 11.32 279.37 806.14
25 71 11.46 0.115 11.35 290.71 794.79
26 70 © 11.50 0.115 11.39 302.10 783.41
27 69 11.43 0.115 11.32 313.41 772.09
28 68 11.53 0.115 11.42 324.83 760.68
29 67 11.52 0.115 11.41 336.23 749.27
30 66 11.51 0.115 11.40 347.63 737.88
31 65 11.51 0.115 11.40 359.02 726.48
32 64 11.45 0.115 11.34 370.36 715.15
33 63 11.45 0.115 11.34 381.69 703.81
34 62 © 11.32 0.115 11.21 392.90 692.61
35 61 11.51 0.115 11.40 404.29 681.21
36 60 11.50 0.115 11.39 415.68 669.83
37 59 11.41 0.115 11.30 426.97 658.53
38 58 11.89 0.115 11.78 438.75 646.76

60
FINAL WELL REPORT
KAR COMPANY
DRILLING NEW WELLS
KHURMALA DOME FIELD
WELL NO: KDN-16 (K-442)
FIELD DIVISION
WELL LOCATION (SX)
39 57 11.91 0.115 11.80 450.54 634.96
40 56 11.72 0.115 11.61 462.15 623.36
41 55 11.80 0.115 11.69 473.83 611.67
42 54 11.81 0.115 11.70 485.53 599.98
43 53 © 11.79 0.115 11.68 497.20 588.30
44 52 11.26 0.115 11.15 508.35 577.16
45 51 11.51 0.115 11.40 519.74 565.76
46 50 11.48 0.115 11.37 531.11 554.40
47 49 11.51 0.115 11.40 542.50 543.00
48 48 11.42 0.115 11.31 553.81 531.70
49 47 11.52 0.115 11.41 565.21 520.29
50 46 11.24 0.115 11.13 576.34 509.17
51 45 11.51 0.115 11.40 587.73 497.77
52 44 © 11.52 0.115 11.41 599.14 486.37
53 43 11.22 0.115 11.11 610.24 475.26
54 42 11.32 0.115 11.21 621.45 464.06
55 41 11.42 0.115 11.31 632.75 452.75
56 40 11.46 0.115 11.35 644.10 441.41
57 39 11.53 0.115 11.42 655.51 429.99
58 38 11.45 0.115 11.34 666.85 418.66
59 37 11.32 0.115 11.21 678.05 407.45
60 36 11.52 0.115 11.41 689.46 396.05
61 35 11.48 0.115 11.37 700.82 384.68
62 34 11.37 0.115 11.26 712.08 373.43
63 33 © 11.50 0.115 11.39 723.46 362.04
64 32 11.43 0.115 11.32 734.78 350.73
65 31 11.46 0.115 11.35 746.12 339.38
66 30 11.43 0.115 11.32 757.44 328.07
67 29 11.46 0.115 11.35 768.78 316.72
68 28 11.32 0.115 11.21 779.99 305.52
69 27 © 11.52 0.115 11.41 791.39 294.11
70 26 11.52 0.115 11.41 802.80 282.71
71 25 11.47 0.115 11.36 814.15 271.35
72 24 11.43 0.115 11.32 825.47 260.04
73 23 11.44 0.115 11.33 836.79 248.71
74 22 © 11.42 0.115 11.31 848.10 237.41
75 21 11.41 0.115 11.30 859.39 226.11
76 20 © 11.43 0.115 11.32 870.71 214.80
77 19 11.17 0.115 11.06 881.76 203.74
78 18 11.42 0.115 11.31 893.07 192.44
79 17 11.45 0.115 11.34 904.40 181.10
80 16 11.52 0.115 11.41 915.81 169.70
81 15 11.51 0.115 11.40 927.20 158.30
82 14 11.51 0.115 11.40 938.60 146.91
83 13 11.43 0.115 11.32 949.91 135.59
84 12 11.52 0.115 11.41 961.32 124.19
85 11 11.53 0.115 11.42 972.73 112.77
86 10 11.72 0.115 11.61 984.34 101.17
87 9 11.67 0.115 11.56 995.89 89.61
88 8 11.90 0.115 11.79 1007.68 77.82
89 7 11.47 0.115 11.36 1019.03 66.47
90 6 11.42 0.115 11.31 1030.34 55.16
91 5 11.46 0.115 11.35 1041.68 43.82
92 4 11.42 0.115 11.31 1052.99 32.51
93 3 11.52 0.115 11.41 1064.39 21.11
94 2 11.42 0.115 11.31 1075.70 9.80
95 1 11.32 0.115 11.21 1086.90 -1.40
(Stick Up)

61
FINAL WELL REPORT
KAR COMPANY
DRILLING NEW WELLS
KHURMALA DOME FIELD
WELL NO: KDN-16 (K-442)
FIELD DIVISION
WELL LOCATION (SX)
7.1.4. 4 1/2" TBG Tally

Table P.4: 4 1/2" TBG Tally

Packer Depth: Top @ 964.23 m & Bottom @ 966.08 m


Top Perforation depth @ 993 m Date: 09 Oct 2017
RTKB Elevation = 9.26 m Completion Eng.: Salih Turay
RTKB to TH Fingers = 9.26 m Well No: K-442 (KDN-16)
Joint Net Depth
Depth
Item Description Marked Length From
in Well
No. (m) ORKB
1 BHA Well Completion Depth 984.060 0.000
2 WL Re-Entry guide joint 0.300 983.760 0.300
3 4 1/2" Vam Top - L-80 , 11.6 Tubing Pup Joint 2.15 981.610 2.450
4 4 1/2" WXN Nipple Vam Top P x B 0.36 981.250 2.810
5 4 1/2" Vam Top 11.6 Perforated Joint 3.14 978.110 5.950
6 4 1/2" WX Nipple Vam Top P x B 0.53 977.580 6.480
7 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 1 9 968.580 15.480
8 4 1/2" Vam Top - L-80 , 11.6 Tubing Pup Joint 2.14 966.440 17.620
9 XO (4-1/2" Vam Top Pin x New Vam Box) 0.36 966.080 17.980
10 7" Black Cat TH Packer 1.85 964.230 19.830
11 XO (4-1/2" New Vam Pin x Vam Top Box) 0.36 963.870 20.190
12 4 1/2" Vam Top - L-80 , 11.6 Tubing Pup Joint 3.14 960.730 23.330
13 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 2 9.07 951.660 32.400
14 Sliding Side Door SSD 1.20 950.460 33.600
15 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 3 9.07 941.390 42.670
16 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 4 8.93 932.460 51.600
17 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 5 8.97 923.490 60.570
18 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 6 9.11 914.380 69.680
19 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 7 8.99 905.390 78.670
20 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 8 9.1 896.290 87.770
21 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 9 9.11 887.180 96.880
22 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 10 8.99 878.190 105.870
23 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 11 9.01 869.180 114.880
24 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 12 9.08 860.100 123.960
25 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 13 9.01 851.090 132.970
26 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 14 9.05 842.040 142.020
27 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 15 9.04 833.000 151.060
28 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 16 9.12 823.880 160.180
29 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 17 8.92 814.960 169.100
30 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 18 9.08 805.880 178.180
31 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 19 9.18 796.700 187.360
32 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 20 9.12 787.580 196.480
33 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 21 9.32 778.260 205.800
34 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 22 9.18 769.080 214.980
35 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 23 9.16 759.920 224.140
36 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 24 9.11 750.810 233.250
37 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 25 8.74 742.070 241.990

62
FINAL WELL REPORT
KAR COMPANY
DRILLING NEW WELLS
KHURMALA DOME FIELD
WELL NO: KDN-16 (K-442)
FIELD DIVISION
WELL LOCATION (SX)
38 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 26 9.07 733.000 251.060
39 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 27 9.13 723.870 260.190
40 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 28 9.18 714.690 269.370
41 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 29 8.92 705.770 278.290
42 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 30 8.82 696.950 287.110
43 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 31 8.73 688.220 295.840
44 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 32 9.17 679.050 305.010
45 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 33 8.94 670.110 313.950
46 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 34 9.09 661.020 323.040
47 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 35 8.69 652.330 331.730
48 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 36 9.07 643.260 340.800
49 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 37 8.93 634.330 349.730
50 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 38 9.18 625.150 358.910
51 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 39 9.09 616.060 368.000
52 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 40 9.06 607.000 377.060
53 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 41 9.25 597.750 386.310
54 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 42 9.17 588.580 395.480
55 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 43 9.08 579.500 404.560
56 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 44 9.13 570.370 413.690
57 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 45 8.94 561.430 422.630
58 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 46 9.15 552.280 431.780
59 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 47 9.1 543.180 440.880
60 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 48 8.57 534.610 449.450
61 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 49 8.95 525.660 458.400
62 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 50 8.91 516.750 467.310
63 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 51 9.11 507.640 476.420
64 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 52 9.01 498.630 485.430
65 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 53 9.02 489.610 494.450
66 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 54 8.9 480.710 503.350
67 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 55 8.93 471.780 512.280
68 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 56 8.94 462.840 521.220
69 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 57 9.1 453.740 530.320
70 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 58 9 444.740 539.320
71 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 59 8.98 435.760 548.300
72 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 60 8.97 426.790 557.270
73 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 61 8.98 417.810 566.250
74 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 62 8.96 408.850 575.210
75 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 63 8.65 400.200 583.860
76 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 64 9 391.200 592.860
77 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 65 8.93 382.270 601.790
78 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 66 8.94 373.330 610.730
79 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 67 9.02 364.310 619.750
80 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 68 8.94 355.370 628.690
81 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 69 9.05 346.320 637.740
82 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 70 9.08 337.240 646.820
83 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 71 9.05 328.190 655.870
84 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 72 8.96 319.230 664.830
85 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 73 9.17 310.060 674.000

63
FINAL WELL REPORT
KAR COMPANY
DRILLING NEW WELLS
KHURMALA DOME FIELD
WELL NO: KDN-16 (K-442)
FIELD DIVISION
WELL LOCATION (SX)
86 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 74 9.12 300.940 683.120
87 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 75 9.2 291.740 692.320
88 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 76 9.19 282.550 701.510
89 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 77 8.94 273.610 710.450
90 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 78 9.08 264.530 719.530
91 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 79 9.14 255.390 728.670
92 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 80 9.13 246.260 737.800
93 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 81 9.08 237.180 746.880
94 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 82 9.09 228.090 755.970
95 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 83 8.93 219.160 764.900
96 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 84 8.75 210.410 773.650
97 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 85 9.13 201.280 782.780
98 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 86 8.83 192.450 791.610
99 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 87 8.99 183.460 800.600
100 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 88 9.09 174.370 809.690
101 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 89 8.98 165.390 818.670
102 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 90 9.12 156.270 827.790
103 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 91 9.09 147.180 836.880
104 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 92 9.14 138.040 846.020
105 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 93 9.1 128.940 855.120
106 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 94 8.97 119.970 864.090
107 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 95 9.05 110.920 873.140
108 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 96 9 101.920 882.140
109 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 97 9.1 92.820 891.240
110 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 98 9.09 83.730 900.330
111 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 99 9 74.730 909.330
112 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 100 8.94 65.790 918.270
113 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 101 9.11 56.680 927.380
114 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 102 9.12 47.560 936.500
115 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 103 9.07 38.490 945.570
116 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 104 9.06 29.430 954.630
117 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 105 8.85 20.580 963.480
118 4 1/2" Vam Top - L-80 , 11.6 Tubing Joint 106 9.19 11.390 972.670
4 1/2" Vam Top - L-80 , 11.6 Tubing Pup
119 2.13 9.260 974.800
Joint
120 Tubing Hanger Body 9.260 974.800
121 RTKB To Tubing hanger fingers landing 9.26 0.000 984.060

64
FINAL WELL REPORT
KAR COMPANY
DRILLING NEW WELLS
KHURMALA DOME FIELD
WELL NO: KDN-16 (K-442)
FIELD DIVISION
WELL LOCATION (SX)

7.2. Appendix F
7.2.1. CPI for OH 8.5"

65
FINAL WELL REPORT
KAR COMPANY
DRILLING NEW WELLS
KHURMALA DOME FIELD
WELL NO: KDN-16 (K-442)
FIELD DIVISION
WELL LOCATION (SX)

7.3. Appendix G
7.3.1. Master Log

66
FINAL WELL REPORT
KAR COMPANY
DRILLING NEW WELLS
KHURMALA DOME FIELD
WELL NO: KDN-16 (K-442)
FIELD DIVISION
WELL LOCATION (SX)

67
FINAL WELL REPORT
KAR COMPANY
DRILLING NEW WELLS
KHURMALA DOME FIELD
WELL NO: KDN-16 (K-442)
FIELD DIVISION
WELL LOCATION (SX)

68
FINAL WELL REPORT
KAR COMPANY
DRILLING NEW WELLS
KHURMALA DOME FIELD
WELL NO: KDN-16 (K-442)
FIELD DIVISION
WELL LOCATION (SX)

69
FINAL WELL REPORT
KAR COMPANY
DRILLING NEW WELLS
KHURMALA DOME FIELD
WELL NO: KDN-16 (K-442)
FIELD DIVISION
WELL LOCATION (SX)

70
FINAL WELL REPORT
KAR COMPANY
DRILLING NEW WELLS
KHURMALA DOME FIELD
WELL NO: KDN-16 (K-442)
FIELD DIVISION
WELL LOCATION (SX)

71
FINAL WELL REPORT
KAR COMPANY
DRILLING NEW WELLS
KHURMALA DOME FIELD
WELL NO: KDN-16 (K-442)
FIELD DIVISION
WELL LOCATION (SX)

72