LEGEND:

List of Drawings

Drawing No. Title


01 DM-U4
02 DM-U1
03 DM-U2
04 DM-N6
05 DM-N9
06 DM-N15A
07 DM-N2
08 DM-L2
09 DM-L4-1
10 DM-L4-2
11 DM-L1
12 DM-U1 SHOWPDRWING
13 DM-N1
14 DM-U6
15 DM-N17 0 1 2 3 4 5

16 DM-N12
17 PRV&DM-U5
18 PRV&DM-N5 THE HASHEMITE KINGDOM OF JORDAN
MINISTRY OF WATER & IRRIGATION
19 PRV&DM-N13 WATER AUTHORITY
WATER AUTHORITY _JORDAN

20 PRV&DM-N14
21 PRV&DM-N15B
Consuttant :
22 PRV&DM-N8 Arab Dar Engineering Co.
23 PRV&DM-N7
24 PRV&DM-N4 CONTRACTOR:

25 PRV&DM-N16A MANASRH CONTRCTING CORPORATION

26 PRV&DM-N11
Project Name
27 PRV&DM-N10
28 PRV&DM-U3 RESTRUCTRING,REHABILITATION
AND PRESSURE MANAGEMENT OF AIN AL-BASHA
29 PRV&DM-U7 TENDER NO. 21/2021/SW-FARA 4

30 PRV on pipe 300 DI


Designed By: Location :
31 PRV N2 & N3 *****
Checked By: Abdalrahman Alkhandaq AIN ALBACHA

32 PRV on pipe 100 Steel Approval By: Abdalrahman Alkhandaq Drawing Title :
Surveyor List Of Drawings
Maher Sarrar
33 PRV N9 & N6 Inspector Re-checked By:
*****
Abdalrahman Alkhandaq
Drawn By: Omar Albojok
Date : Drawing No.: Drawing Scale : Plot Scale :

06/12/2022 00 NTS 1/1


LEGEND:

2.37 Item

1
Description

Gate Valve DN100, PN25


Qty

1
2 Y strainer DN100, PN25 1
3 Dismantling Joint DN100, PN25 1
4 Electromagnetic Flow Meter DN100, PN25 1
1.97 Steel Pipe DN 100 ----
Ductile Iron Pipe DN 200 ----

OPENING
ACCESS

0.75
LADDER

1.65
1.25
1
3 0.35 4 0.30

0.20
0.30 2
0.30 0.25

0.40
0.23 0.24

SHOWPDRWING

Top View
0 1 2 3 4 5
OPENING

2.40

THE HASHEMITE KINGDOM OF JORDAN


MINISTRY OF WATER & IRRIGATION
WATER AUTHORITY

2.00 WATER AUTHORITY _JORDAN

Consuttant :

Arab Dar Engineering Co.


1.80

0.47 0.35
4
0.30 1 3
0.30 CONTRACTOR:

MANASRH CONTRCTING CORPORATION

0.30 0.25 Project Name


0.53

2 RESTRUCTRING,REHABILITATION
AND PRESSURE MANAGEMENT OF AIN AL-BASHA
TENDER NO. 21/2021/SW-FARA 4

Designed By: Location :


*****
Checked By: Abdalrahman Alkhandaq AIN ALBACHA

Approval By: Abdalrahman Alkhandaq Drawing Title :


DM-U4

Side View
Surveyor Maher Sarrar

Inspector ***** Re-checked By:


Abdalrahman Alkhandaq
Drawn By: Omar Albojok
Date : Drawing No.: Drawing Scale : Plot Scale :

06/12/2022 01 NTS 1/1


LEGEND:
2.05 Item Description Qty

1 Gate Valve DN 50, PN 25 1

1.65 2
3
Y strainer DN 50, PN 25
Dismantling Joint DN 50, PN 25
1
1
4 Electromagnetic Flow Meter DN 50, PN 25 1
Steel Pipe DN 50 ----
PE Pipe DN 125 ----

OPENING
ACCESS

1.65
LADDER

1.25
2
1 0.24 4

0.300.18 3 0.23 0.240.30

SHOWPDRWING

Top View
0 1 2 3 4 5

OPENING
THE HASHEMITE KINGDOM OF JORDAN
MINISTRY OF WATER & IRRIGATION
WATER AUTHORITY
WATER AUTHORITY _JORDAN

2.05
Consuttant :

Arab Dar Engineering Co.


1.65
CONTRACTOR:
1
1.10

4
0.30 3 0.230.20 0.30 MANASRH CONTRCTING CORPORATION

Project Name

0.180.24
0.45

RESTRUCTRING,REHABILITATION
AND PRESSURE MANAGEMENT OF AIN AL-BASHA
2
TENDER NO. 21/2021/SW-FARA 4

Designed By: Location :


*****
Checked By: Abdalrahman Alkhandaq AIN ALBACHA

Approval By: Abdalrahman Alkhandaq Drawing Title :


DM-U1

Side View Surveyor

Inspector

Drawn By:
Maher Sarrar

*****
Omar Albojok
Re-checked By:
Abdalrahman Alkhandaq

Date : Drawing No.: Drawing Scale : Plot Scale :

06/12/2022 02 NTS 1/1


LEGEND:

2.05 Item Description

Gate Valve DN 50, PN 25


Qty

1 1
2 Y strainer DN 50, PN 25 1

1.65 3
4
Dismantling Joint DN 50, PN 25

Electromagnetic Flow Meter DN 50, PN 25


1
1
Steel Pipe DN 50 ----
PE Pipe DN 125 ----

OPENING
ACCESS

1.65
LADDER

1.25
2
1 0.24 4

0.300.18 3 0.23 0.240.30

SHOWPDRWING

Top View
0 1 2 3 4 5

OPENING THE HASHEMITE KINGDOM OF JORDAN


MINISTRY OF WATER & IRRIGATION
WATER AUTHORITY
WATER AUTHORITY _JORDAN

2.05
Consuttant :

Arab Dar Engineering Co.


1.65
CONTRACTOR:
1
1.10

4
0.30 3 0.230.20 0.30
MANASRH CONTRCTING CORPORATION

Project Name

0.180.24
0.45

RESTRUCTRING,REHABILITATION
AND PRESSURE MANAGEMENT OF AIN AL-BASHA
2 TENDER NO. 21/2021/SW-FARA 4

Designed By: Location :


*****
Checked By: Abdalrahman Alkhandaq AIN ALBACHA

Approval By: Abdalrahman Alkhandaq Drawing Title :


DM-U2

Side View
Surveyor Maher Sarrar

Inspector ***** Re-checked By:


Abdalrahman Alkhandaq
Drawn By: Omar Albojok
Date : Drawing No.: Drawing Scale : Plot Scale :

06/12/2022 03 NTS 1/1


LEGEND:
Item Description Qty

1 Gate Valve DN 50, PN 25 1

1.65 2 Y strainer DN 50, PN 25


Dismantling Joint DN 50, PN 25
1
3 1
4 Electromagnetic Flow Meter DN 50, PN 25 1
Steel Pipe DN 50 ----
Steel Pipe DN 100 ----

OPENING
ACCESS
LADDER

1.65

1.25
2
1 0.24 4

0.300.18 3 0.23 0.240.30

SHOWPDRWING

Top View
0 1 2 3 4 5

OPENING
THE HASHEMITE KINGDOM OF JORDAN
MINISTRY OF WATER & IRRIGATION
WATER AUTHORITY
2.05 WATER AUTHORITY _JORDAN

Consuttant :

1.65 Arab Dar Engineering Co.

1
1.10

4 CONTRACTOR:

0.30 3 0.230.20 0.30 MANASRH CONTRCTING CORPORATION

0.180.24 Project Name


0.45

RESTRUCTRING,REHABILITATION
2 AND PRESSURE MANAGEMENT OF AIN AL-BASHA
TENDER NO. 21/2021/SW-FARA 4

Designed By: Location :


*****
Checked By: Abdalrahman Alkhandaq AIN ALBACHA

Side View
Approval By: Abdalrahman Alkhandaq Drawing Title :
Surveyor DM-N6
Maher Sarrar

Inspector ***** Re-checked By:


Abdalrahman Alkhandaq
Drawn By: Omar Albojok
Date : Drawing No.: Drawing Scale : Plot Scale :

06/12/2022 04 NTS 1/1


LEGEND:

Item Description Qty

2.40 1 Gate Valve DN100, PN25 1


2 Y strainer DN100, PN25 1
3 Dismantling Joint DN100, PN25 1
4 Electromagnetic Flow Meter DN100, PN25 1
2.00 Steel Pipe DN 100 ----
Steel Pipe DN 150 ----

OPENING
ACCESS
LADDER

1.65
0.23

1.25
1 0.24 4
0.30
0.30
3 2
0.30 0.25

SHOWPDRWING
Top View
OPENING 0 1 2 3 4 5

2.40

THE HASHEMITE KINGDOM OF JORDAN


2.00 MINISTRY OF WATER & IRRIGATION
WATER AUTHORITY
WATER AUTHORITY _JORDAN

0.30 0.23 0.35 0.30 0.25 0.30 Consuttant :

1 Arab Dar Engineering Co.


1.80

3 4
CONTRACTOR:

MANASRH CONTRCTING CORPORATION

0.24 Project Name


0.53

2
RESTRUCTRING,REHABILITATION
AND PRESSURE MANAGEMENT OF AIN AL-BASHA
TENDER NO. 21/2021/SW-FARA 4

Designed By: Location :


*****
Checked By: Abdalrahman Alkhandaq AIN ALBACHA

Side View Approval By:


Surveyor
Abdalrahman Alkhandaq

Maher Sarrar
Drawing Title :
DM-N9

Inspector ***** Re-checked By:


Abdalrahman Alkhandaq
Drawn By: Omar Albojok
Date : Drawing No.: Drawing Scale : Plot Scale :

06/12/2022 05 NTS 1/1


LEGEND:

Item Description Qty

2.15 1 Gate Valve DN 80, PN25

Y strainer DN 80, PN25


1
2 1
3 Dismantling Joint DN 80, PN25 1
4 Electromagnetic Flow Meter DN 80, PN25 1

1.75 Steel Pipe DN 80

Steel Pipe DN 100


----
----

OPENING
ACCESS
LADDER
0.24

1.65
1.25
1 3 0.31 0.20

0.30 0.20 0.20 0.30


2 4

SHOWPDRWING

Top View
2.15
0 1 2 3 4 5
OPENING

THE HASHEMITE KINGDOM OF JORDAN


MINISTRY OF WATER & IRRIGATION
WATER AUTHORITY

1.75 WATER AUTHORITY _JORDAN

Consuttant :

Arab Dar Engineering Co.


0.20 0.31
1.80

1
CONTRACTOR:

0.30 3 2 0.20 0.30


MANASRH CONTRCTING CORPORATION

Project Name
0.24 0.20
0.45

4
RESTRUCTRING,REHABILITATION
AND PRESSURE MANAGEMENT OF AIN AL-BASHA
TENDER NO. 21/2021/SW-FARA 4

Designed By: Location :


*****
Checked By: Abdalrahman Alkhandaq AIN ALBACHA

Side View Approval By:


Surveyor
Abdalrahman Alkhandaq

Maher Sarrar
Drawing Title :
DM-N15A

Inspector ***** Re-checked By:


Abdalrahman Alkhandaq
Drawn By: Omar Albojok
Date : Drawing No.: Drawing Scale : Plot Scale :

06/12/2022 06 NTS 1/1


LEGEND:

2.85 Item

1
Description

Gate Valve DN 150, PN25


Qty

1
2 Y strainer DN 150, PN25 1
3 Dismantling Joint DN 150 PN25 1
4 Electromagnetic Flow Meter DN 150, PN25 1
2.45 Steel Pipe DN 150 ----
Ductile Iron Pipe DN 200 ----

OPENING
ACCESS
LADDER

1.65

1.25
1 3 2 0.45 4

0.20
0.35
0.30 0.35
0.48

SHOWPDRWING

Top View
0 1 2 3 4 5

OPENING

THE HASHEMITE KINGDOM OF JORDAN


MINISTRY OF WATER & IRRIGATION
WATER AUTHORITY
WATER AUTHORITY _JORDAN

0.35 0.27 0.48 0.30 0.35


Consuttant :
1 Arab Dar Engineering Co.
1.80

4
3 2 0.45 CONTRACTOR:

MANASRH CONTRCTING CORPORATION

Project Name
0.51

RESTRUCTRING,REHABILITATION
AND PRESSURE MANAGEMENT OF AIN AL-BASHA
TENDER NO. 21/2021/SW-FARA 4

Designed By: Location :


*****
Checked By: Abdalrahman Alkhandaq AIN ALBACHA

Approval By: Abdalrahman Alkhandaq Drawing Title :


DM-N2

Side View
Surveyor Maher Sarrar

Inspector ***** Re-checked By:


Abdalrahman Alkhandaq
Drawn By: Omar Albojok
Date : Drawing No.: Drawing Scale : Plot Scale :

06/12/2022 07 NTS 1/1


LEGEND:

2.85 Item

1
Description

Gate Valve DN 150, PN25


Qty

1
2 Y strainer DN 150, PN25 1
3 Dismantling Joint DN 150 PN25 1
4 Electromagnetic Flow Meter DN 150, PN25 1
2.45 Steel Pipe DN 150 ----
Ductile Iron Pipe DN 200 ----

OPENING
ACCESS
LADDER

1.65

1.25
1 3 2 0.45 4

0.20
0.35
0.30 0.35
0.48

SHOWPDRWING

Top View
0 1 2 3 4 5
OPENING

THE HASHEMITE KINGDOM OF JORDAN


MINISTRY OF WATER & IRRIGATION
WATER AUTHORITY
WATER AUTHORITY _JORDAN

0.35 0.27 0.48 0.30 0.35


Consuttant :
1
Arab Dar Engineering Co.
1.80

4
3 2 0.45 CONTRACTOR:

MANASRH CONTRCTING CORPORATION

Project Name
0.51

RESTRUCTRING,REHABILITATION
AND PRESSURE MANAGEMENT OF AIN AL-BASHA
TENDER NO. 21/2021/SW-FARA 4

Designed By: Location :


*****
Checked By: Abdalrahman Alkhandaq AIN ALBACHA

Approval By: Abdalrahman Alkhandaq Drawing Title :

Side View Surveyor


Inspector

Drawn By:
Maher Sarrar

*****
Omar Albojok
DM-L2

Re-checked By:
Abdalrahman Alkhandaq

Date : Drawing No.: Drawing Scale : Plot Scale :

06/12/2022 08 NTS 1/1


LEGEND:

2.85 Item

1
Description

Gate Valve DN 150, PN25


Qty

1
2 Y strainer DN 150, PN25 1
3 Dismantling Joint DN 150 PN25 1
4 Electromagnetic Flow Meter DN 150, PN25 1
2.45 Steel Pipe DN 150 ----
Ductile Iron Pipe DN 150 ----

OPENING
ACCESS
LADDER

1.65

1.25
1 3 2 0.45 4

0.35
0.30 0.35
0.48

SHOWPDRWING

Top View
0 1 2 3 4 5

OPENING

THE HASHEMITE KINGDOM OF JORDAN


MINISTRY OF WATER & IRRIGATION
WATER AUTHORITY
WATER AUTHORITY _JORDAN

0.35 0.27 0.48 0.30 0.35


Consuttant :
1 Arab Dar Engineering Co.
1.80

4
3 2 0.45 CONTRACTOR:

MANASRH CONTRCTING CORPORATION

Project Name
0.51

RESTRUCTRING,REHABILITATION
AND PRESSURE MANAGEMENT OF AIN AL-BASHA
TENDER NO. 21/2021/SW-FARA 4

Designed By: Location :


*****
Checked By: Abdalrahman Alkhandaq AIN ALBACHA

Approval By: Abdalrahman Alkhandaq Drawing Title :


Surveyor DM-L4-1

Side View
Maher Sarrar

Inspector ***** Re-checked By:


Abdalrahman Alkhandaq
Drawn By: Omar Albojok
Date : Drawing No.: Drawing Scale : Plot Scale :

06/12/2022 09 NTS 1/1


LEGEND:

2.85 Item Description Qty

1 Gate Valve DN 150, PN25 1


2 Y strainer DN 150, PN25 1
3 Dismantling Joint DN 150 PN25 1

2.45 4 Electromagnetic Flow Meter DN 150, PN25

Steel Pipe DN 150


1
----
PE Pipe DN 180 ----

OPENING
ACCESS
LADDER

1.65

1.25
1 3 2 0.45 4

0.35
0.30 0.35
0.48

SHOWPDRWING
Top View
OPENING 0 1 2 3 4 5

THE HASHEMITE KINGDOM OF JORDAN


MINISTRY OF WATER & IRRIGATION
WATER AUTHORITY
WATER AUTHORITY _JORDAN

0.35 0.27 0.48 0.30 0.35


Consuttant :
1
Arab Dar Engineering Co.
1.80

4
3 2 0.45 CONTRACTOR:

MANASRH CONTRCTING CORPORATION

Project Name
0.51

RESTRUCTRING,REHABILITATION
AND PRESSURE MANAGEMENT OF AIN AL-BASHA
TENDER NO. 21/2021/SW-FARA 4

Designed By: Location :


*****
Checked By: Abdalrahman Alkhandaq AIN ALBACHA

Approval By: Abdalrahman Alkhandaq Drawing Title :

Side View Surveyor


Inspector

Drawn By:
Maher Sarrar

*****
Omar Albojok
DM-L4-2

Re-checked By:
Abdalrahman Alkhandaq

Date : Drawing No.: Drawing Scale : Plot Scale :

06/12/2022 10 NTS 1/1


LEGEND:

Item Description Qty


3.44 1 Butterfly Valve DN 250, PN25 1
2 Y strainer DN 250, PN25 1
3 Dismantling Joint DN 250 PN25 1
4 Electromagnetic Flow Meter DN 250, PN25 1
Steel Pipe DN 250 ----
OPENING
ACCESS Ductile Iron Pipe DN 300 ----
LADDER

2.00
0.50 0.25 0.75 0.45 0.50
1 0.73
3

0.30
2
4

Top View
SHOWPDRWING

0 1 2 3 4 5

OPENING

THE HASHEMITE KINGDOM OF JORDAN


MINISTRY OF WATER & IRRIGATION
WATER AUTHORITY
3 WATER AUTHORITY _JORDAN

Consuttant :

Arab Dar Engineering Co.

0.50 0.250.26 0.73 0.45 0.50


2.20

CONTRACTOR:
3
1
MANASRH CONTRCTING CORPORATION

Project Name
0.60

4 RESTRUCTRING,REHABILITATION
2 AND PRESSURE MANAGEMENT OF AIN AL-BASHA
TENDER NO. 21/2021/SW-FARA 4

Designed By: Location :


*****
Checked By: Abdalrahman Alkhandaq AIN ALBACHA

Side View Approval By:


Surveyor
Abdalrahman Alkhandaq

Maher Sarrar
Drawing Title :
DM-L1

Inspector ***** Re-checked By:


Abdalrahman Alkhandaq
Drawn By: Omar Albojok
Date : Drawing No.: Drawing Scale : Plot Scale :

06/12/2022 11 NTS 1/1


LEGEND:

Item Description Qty

1 Gate Valve DN 50, PN 25 1

2.05 2
3
Y strainer DN 50, PN 25

Dismantling Joint DN 50, PN 25


1
1
4 Electromagnetic Flow Meter DN 50, PN 25 1

1.65 Steel Pipe DN 50

PE Pipe DN 125
----
----

OPENING
ACCESS

1.65
LADDER

1.25
2
1 0.24 4

0.300.18 3 0.23 0.240.30

SHOWPDRWING

Top View 0 1 2 3 4 5

THE HASHEMITE KINGDOM OF JORDAN


OPENING MINISTRY OF WATER & IRRIGATION
WATER AUTHORITY
WATER AUTHORITY _JORDAN

2.05
Consuttant :

Arab Dar Engineering Co.


1.65
CONTRACTOR:
1
1.10

4
0.30 3 0.230.20 0.30
MANASRH CONTRCTING CORPORATION

Project Name

0.180.24
0.45

RESTRUCTRING,REHABILITATION
2 AND PRESSURE MANAGEMENT OF AIN AL-BASHA
TENDER NO. 21/2021/SW-FARA 4

Designed By: Location :


*****
Checked By: Abdalrahman Alkhandaq AIN ALBACHA

Approval By: Abdalrahman Alkhandaq Drawing Title :

Side View Surveyor


Inspector
Maher Sarrar

*****
DM-N3

Re-checked By:
Abdalrahman Alkhandaq
Drawn By: Omar Albojok
Date : Drawing No.: Drawing Scale : Plot Scale :

06/12/2022 12 NTS 1/1


LEGEND:

Item Description Qty

1 Gate Valve DN 50, PN 25 1


2.05 2 Y strainer DN 50, PN 25 1
3 Dismantling Joint DN 50, PN 25 1
4 Electromagnetic Flow Meter DN 50, PN 25 1
1.65 Steel Pipe DN 50 ----
PE Pipe DN 125 ----

OPENING
ACCESS

1.65
LADDER

1.25
2
1 0.24 4

0.300.18 3 0.23 0.240.30

SHOWPDRWING

Top View 0 1 2 3 4 5

OPENING THE HASHEMITE KINGDOM OF JORDAN


MINISTRY OF WATER & IRRIGATION
WATER AUTHORITY
WATER AUTHORITY _JORDAN

2.05
Consuttant :

Arab Dar Engineering Co.


1.65
CONTRACTOR:
1
1.10

4
0.30 3 0.230.20 0.30
MANASRH CONTRCTING CORPORATION

Project Name

0.180.24
0.45

RESTRUCTRING,REHABILITATION
AND PRESSURE MANAGEMENT OF AIN AL-BASHA
2
TENDER NO. 21/2021/SW-FARA 4

Designed By: Location :


*****
Checked By: Abdalrahman Alkhandaq AIN ALBACHA

Approval By: Abdalrahman Alkhandaq Drawing Title :

Side View Surveyor


Inspector
Maher Sarrar

*****
DM-N1

Re-checked By:
Abdalrahman Alkhandaq
Drawn By: Omar Albojok
Date : Drawing No.: Drawing Scale : Plot Scale :

06/12/2022 13 NTS 1/1


LEGEND:

2.05 Item

1
Description

Gate Valve DN 50, PN 25


Qty

1
2 Y strainer DN 50, PN 25 1

1.65 3
4
Dismantling Joint DN 50, PN 25

Electromagnetic Flow Meter DN 50, PN 25


1
1
Steel Pipe DN 50 ----
PE Pipe DN 125 ----

OPENING
ACCESS

1.65
LADDER

1.25
2
1 0.24 4

0.300.18 3 0.23 0.240.30

SHOWPDRWING

Top View
0 1 2 3 4 5

OPENING THE HASHEMITE KINGDOM OF JORDAN


MINISTRY OF WATER & IRRIGATION
WATER AUTHORITY
WATER AUTHORITY _JORDAN

2.05
Consuttant :

Arab Dar Engineering Co.


1.65
CONTRACTOR:
1
1.10

4
MANASRH CONTRCTING CORPORATION

0.30 3 0.230.20 0.30


Project Name

0.180.24
0.45

RESTRUCTRING,REHABILITATION
AND PRESSURE MANAGEMENT OF AIN AL-BASHA
2 TENDER NO. 21/2021/SW-FARA 4

Designed By: Location :


*****
Checked By: Abdalrahman Alkhandaq AIN ALBACHA

Approval By: Abdalrahman Alkhandaq Drawing Title :


Surveyor DM-U6

Side View
Maher Sarrar

Inspector ***** Re-checked By:


MAHER SARRAR
Abdalrahman Alkhandaq
Drawn By: Omar Albojok
Date : Drawing No.: Drawing Scale : Plot Scale :

06/12/2022 14 NTS 1/1


LEGEND:
Item Description Qty
2.05 1 Gate Valve DN 50, PN 25 1
2 Y strainer DN 50, PN 25 1
3 Dismantling Joint DN 50, PN 25 1
1.65 4 Electromagnetic Flow Meter DN 50, PN 25 1
Steel Pipe DN 50 ----
PE Pipe DN 125 ----

OPENING
ACCESS

1.65
LADDER

1.25
2
1 0.24 4

0.300.18 3 0.23 0.240.30

SHOWPDRWING

Top View
0 1 2 3 4 5

OPENING THE HASHEMITE KINGDOM OF JORDAN


MINISTRY OF WATER & IRRIGATION
WATER AUTHORITY
WATER AUTHORITY _JORDAN

2.05
Consuttant :

Arab Dar Engineering Co.


1.65
CONTRACTOR:
1
1.10

4
MANASRH CONTRCTING CORPORATION

0.30 3 0.230.20 0.30


Project Name

0.180.24
0.45

RESTRUCTRING,REHABILITATION
AND PRESSURE MANAGEMENT OF AIN AL-BASHA
2 TENDER NO. 21/2021/SW-FARA 4

Designed By: Location :


*****
Checked By: Abdalrahman Alkhandaq AIN ALBACHA

Approval By: Abdalrahman Alkhandaq Drawing Title :


Surveyor DM-N17

Side View
Maher Sarrar

Inspector ***** Re-checked By:


Abdalrahman Alkhandaq
Drawn By: Omar Albojok
Date : Drawing No.: Drawing Scale : Plot Scale :

06/12/2022 15 NTS 1/1


LEGEND:

Item Description Qty

2.05 1
2
Gate Valve DN 50, PN 25

Y strainer DN 50, PN 25
1
1
3 Dismantling Joint DN 50, PN 25 1

1.65 4 Electromagnetic Flow Meter DN 50, PN 25

Steel Pipe DN 50
1
----
PE Pipe DN 180 ----

OPENING
ACCESS

1.65
LADDER

1.25
2
1 0.24 4

0.300.18 3 0.23 0.240.30

SHOWPDRWING

Top View 0 1 2 3 4 5

OPENING THE HASHEMITE KINGDOM OF JORDAN


MINISTRY OF WATER & IRRIGATION
WATER AUTHORITY
WATER AUTHORITY _JORDAN

2.05
Consuttant :

Arab Dar Engineering Co.


1.65
CONTRACTOR:
1
1.10

4
0.30 3 0.230.20 0.30
MANASRH CONTRCTING CORPORATION

Project Name

0.180.24
0.45

RESTRUCTRING,REHABILITATION
AND PRESSURE MANAGEMENT OF AIN AL-BASHA
2
TENDER NO. 21/2021/SW-FARA 4

Designed By: Location :


*****
Checked By: Abdalrahman Alkhandaq AIN ALBACHA

Approval By: Abdalrahman Alkhandaq Drawing Title :

Side View Surveyor


Inspector
Maher Sarrar

*****
DM-N12

Re-checked By:
Abdalrahman Alkhandaq
Drawn By: Omar Albojok
Date : Drawing No.: Drawing Scale : Plot Scale :

06/12/2022 16 NTS 1/1


LEGEND:
Item Description Qty

1 1
3.57 Y strainer DN150, PN25

2 Dismantling Joint DN150, PN25 1


3 Gate Valve DN150, PN25 1
4 Pressure Reducing Valve DN80, PN25 1
5 Electromagnetic Flow Meter DN150, PN25 1
Steel Pipe DN 150 ----
OPENING PE Pipe DN 180 ----
ACCESS
LADDER

1.00
0.48 0.240.27 0.32

1.75
0.75 0.30 0.30
3
1 2 4 5

0.30

0.60
SHOWPDRWING
Top View

0 1 2 3 4 5

THE HASHEMITE KINGDOM OF JORDAN


MINISTRY OF WATER & IRRIGATION
WATER AUTHORITY

3.57 WATER AUTHORITY _JORDAN

OPENING
Consuttant :

Arab Dar Engineering Co.

CONTRACTOR:

0.30 0.48 0.240.27 0.32 MANASRH CONTRCTING CORPORATION


0.30
3 0.75
1.80

HDPE PIPE DN 180 HDPE PIPE DN 180


Project Name
4 5
1 2

RESTRUCTRING,REHABILITATION
AND PRESSURE MANAGEMENT OF AIN AL-BASHA
TENDER NO. 21/2021/SW-FARA 4
0.50

Designed By: Location :


*****
Checked By: Abdalrahman Alkhandaq AIN ALBACHA

Approval By: Abdalrahman Alkhandaq Drawing Title :


Surveyor DM&PRV-U5
Maher Sarrar

Side View Inspector

Drawn By:
*****
Omar Albojok
Re-checked By:
Abdalrahman Alkhandaq

Date : Drawing No.: Drawing Scale : Plot Scale :

06/12/2022 17 NTS 1/1


LEGEND:
Item Description Qty

1 Y strainer DN150, PN25 1


2 Dismantling Joint DN150, PN25 1
3.57 3 Gate Valve DN150, PN25 1
4 Pressure Reducing Valve DN100, PN25 1
5 Electromagnetic Flow Meter DN150, PN25 1
Steel Pipe DN 150 ----
DI Pipe DN 200 ----

OPENING
ACCESS
LADDER

1.00
0.48 0.240.27 0.40

1.75
0.75 0.30 0.30
3
1 2 4 5

0.30

0.60
Top View SHOWPDRWING

0 1 2 3 4 5

THE HASHEMITE KINGDOM OF JORDAN


MINISTRY OF WATER & IRRIGATION
3.57 WATER AUTHORITY
WATER AUTHORITY _JORDAN

OPENING

Consuttant :

Arab Dar Engineering Co.

0.30 0.48 0.240.27


0.40 0.30 CONTRACTOR:
3 0.75
1.80

4 5 MANASRH CONTRCTING CORPORATION


1 2

Project Name
0.50

RESTRUCTRING,REHABILITATION
AND PRESSURE MANAGEMENT OF AIN AL-BASHA
TENDER NO. 21/2021/SW-FARA 4

Designed By: Location :


*****
Checked By: Abdalrahman Alkhandaq AIN ALBACHA

Approval By:
Side View Drawing Title :
Abdalrahman Alkhandaq

Surveyor DM&PRV-N5
Maher Sarrar

Inspector ***** Re-checked By:


Abdalrahman Alkhandaq
Drawn By: Omar Albojok
Date : Drawing No.: Drawing Scale : Plot Scale :

06/12/2022 18 NTS 1/1


LEGEND: OK
Item Description Qty

1 Y strainer DN150, PN25 1


2 Dismantling Joint DN150, PN25 1
3 Gate Valve DN150, PN25 1
3.57 4 Pressure Reducing Valve DN100, PN25 1
5 Electromagnetic Flow Meter DN150, PN25 1
Steel Pipe DN 150 ----
DI Pipe DN 200 ----

OPENING
ACCESS
LADDER

1.00
0.48 0.240.27 0.40

1.75
0.75 0.30 0.30
3
1 2 4 5

0.30

0.60
Top View
SHOWPDRWING

0 1 2 3 4 5

THE HASHEMITE KINGDOM OF JORDAN


MINISTRY OF WATER & IRRIGATION
WATER AUTHORITY
WATER AUTHORITY _JORDAN

3.57
Consuttant :

OPENING Arab Dar Engineering Co.

CONTRACTOR:

0.30 0.48 0.240.27 0.30 MANASRH CONTRCTING CORPORATION


0.40 0.75
3
1.80

4 5 Project Name
1 2

RESTRUCTRING,REHABILITATION
AND PRESSURE MANAGEMENT OF AIN AL-BASHA
0.50

TENDER NO. 21/2021/SW-FARA 4

Designed By: Location :


*****
Checked By: Abdalrahman Alkhandaq AIN ALBACHA

Side View Approval By: Abdalrahman Alkhandaq Drawing Title :


DM&PRV-N13
Surveyor Maher Sarrar

Inspector ***** Re-checked By:


Abdalrahman Alkhandaq
Drawn By: Omar Albojok
Date : Drawing No.: Drawing Scale : Plot Scale :

06/12/2022 19 NTS 1/1


LEGEND:
Item Description Qty

1 Y strainer DN150, PN25 1


2 Dismantling Joint DN150, PN25 1
3.57 3 Gate Valve DN150, PN25 1
4 Pressure Reducing Valve DN100, PN25 1
5 Electromagnetic Flow Meter DN150, PN25 1
Steel Pipe DN 150 ----
PE Pipe DN 180 ----
OPENING
ACCESS
LADDER

1.00
HDPE PIPE DN 180 0.48 0.240.27 0.40 HDPE PIPE DN 180

1.75
0.75 0.30 0.30
3
1 2 4 5

0.30

0.60
Top View
SHOWPDRWING

0 1 2 3 4 5

THE HASHEMITE KINGDOM OF JORDAN


MINISTRY OF WATER & IRRIGATION
WATER AUTHORITY
WATER AUTHORITY _JORDAN

3.57
Consuttant :
OPENING
Arab Dar Engineering Co.

CONTRACTOR:

0.30 0.48 0.240.27


0.40 0.30 0.30 MANASRH CONTRCTING CORPORATION
3 0.75
1.80

HDPE PIPE DN 180 HDPE PIPE DN 180


4 5
1 2 Project Name

RESTRUCTRING,REHABILITATION
0.50

AND PRESSURE MANAGEMENT OF AIN AL-BASHA


TENDER NO. 21/2021/SW-FARA 4

Designed By: Location :


*****
Checked By: AIN ALBACHA
Side View Approval By:
Abdalrahman Alkhandaq

Abdalrahman Alkhandaq Drawing Title :


Surveyor DM&PRV-N14
Maher Sarrar

Inspector ***** Re-checked By:


Abdalrahman Alkhandaq
Drawn By: Omar Albojok
Date : Drawing No.: Drawing Scale : Plot Scale :

06/12/2022 20 NTS 1/1


LEGEND:
Item Description Qty
2.42 1 Y strainer DN 50, PN25 1
2 Dismantling Joint DN 50, PN25 1
3 Gate Valve DN 50, PN25 1
4 Pressure Reducing Valve DN32, PN25 1
5 Electromagnetic Flow Meter DN 50, PN25 1
Steel Pipe DN 50 ----
OPENING
ACCESS PE Pipe DN 125 ----
LADDER

1.55
0.30 3 4 0.30
1 2 5

0.50
Top View
SHOWPDRWING

0 1 2 3 4 5

THE HASHEMITE KINGDOM OF JORDAN


MINISTRY OF WATER & IRRIGATION
WATER AUTHORITY
WATER AUTHORITY _JORDAN

2.42
OPENING
Consuttant :

Arab Dar Engineering Co.

CONTRACTOR:

MANASRH CONTRCTING CORPORATION


1.60

3 Project Name
0.30 1 2 4
5 0.30
RESTRUCTRING,REHABILITATION
AND PRESSURE MANAGEMENT OF AIN AL-BASHA
TENDER NO. 21/2021/SW-FARA 4
0.50

Designed By: Location :


*****
Checked By: Abdalrahman Alkhandaq AIN ALBACHA

Approval By: Abdalrahman Alkhandaq Drawing Title :


Surveyor DM&PRV-N15B
Maher Sarrar

Side View Inspector

Drawn By:
*****
Omar Albojok
Re-checked By:
Abdalrahman Alkhandaq

Date : Drawing No.: Drawing Scale : Plot Scale :

06/12/2022 21 NTS 1/1


LEGEND:
Item Description Qty

1 Y strainer DN 50, PN25 1


2 Dismantling Joint DN 50, PN25 1
2.42 3 Gate Valve DN 50, PN25 1
4 Pressure Reducing Valve DN40, PN25 1
5 Electromagnetic Flow Meter DN 50, PN25 1
Steel Pipe DN 50 ----
PE Pipe DN 125 ----
OPENING
ACCESS
LADDER

1.55
0.24
0.30 3 4 0.25 5 0.30
1 2

0.23 0.18 0.22 0.20

0.50
Top View
SHOWPDRWING

0 1 2 3 4 5

THE HASHEMITE KINGDOM OF JORDAN


MINISTRY OF WATER & IRRIGATION
WATER AUTHORITY
WATER AUTHORITY _JORDAN

2.42
OPENING Consuttant :

Arab Dar Engineering Co.

CONTRACTOR:

MANASRH CONTRCTING CORPORATION

0.30 0.23
1.60

Project Name
0.24 0.22 0.25 5
1 2
3 0.30
RESTRUCTRING,REHABILITATION
AND PRESSURE MANAGEMENT OF AIN AL-BASHA
TENDER NO. 21/2021/SW-FARA 4
0.18
0.50

Designed By: Location :


*****
Checked By: Abdalrahman Alkhandaq AIN ALBACHA

Approval By: Abdalrahman Alkhandaq Drawing Title :


Surveyor DM&PRV-N8
Maher Sarrar

Side View Inspector

Drawn By:
*****
Omar Albojok
Re-checked By:
Abdalrahman Alkhandaq

Date : Drawing No.: Drawing Scale : Plot Scale :

06/12/2022 22 NTS 1/1


LEGEND:
Description Qty
2.42 Item

1 Y strainer DN 50, PN25 1


2 Dismantling Joint DN 50, PN25 1
3 Gate Valve DN 50, PN25 1
4 Pressure Reducing Valve DN40, PN25 1
5 Electromagnetic Flow Meter DN 50, PN25 1
OPENING Steel Pipe DN 50 ----
ACCESS
PE Pipe DN 125 ----
LADDER

0.24 0.20

1.55
0.30 3 4 0.25 0.30
1 2

0.18

0.50
0.23 0.22 5

Top View
SHOWPDRWING

0 1 2 3 4 5

THE HASHEMITE KINGDOM OF JORDAN


MINISTRY OF WATER & IRRIGATION
WATER AUTHORITY
WATER AUTHORITY _JORDAN

2.42
OPENING
Consuttant :

Arab Dar Engineering Co.

CONTRACTOR:

MANASRH CONTRCTING CORPORATION


0.24
1.60

0.23 0.18 0.22 Project Name


0.30 0.25 0.30
RESTRUCTRING,REHABILITATION
AND PRESSURE MANAGEMENT OF AIN AL-BASHA
5 0.20 TENDER NO. 21/2021/SW-FARA 4
0.50

2 3 4
1
Designed By: Location :
*****
Checked By: Abdalrahman Alkhandaq AIN ALBACHA

Approval By: Abdalrahman Alkhandaq Drawing Title :


Surveyor DM&PRV-N7
Maher Sarrar

Side View Inspector

Drawn By:
*****
Omar Albojok
Re-checked By:
Abdalrahman Alkhandaq

Date : Drawing No.: Drawing Scale : Plot Scale :

06/12/2022 23 NTS 1/1


LEGEND:
Item Description Qty

1 Y strainer DN 100, PN25 1


3.07 2 Dismantling Joint DN 100, PN25 1
3 Gate Valve DN 100, PN25 1
4 Pressure Reducing Valve DN50, PN25 1
5 Electromagnetic Flow Meter DN 100, PN25 1
Steel Pipe DN 100 ----
OPENING PE Pipe DN 180
ACCESS
----
LADDER

0.35
HDPE PIPE DN 180 0.24 0.50
1 2 3 4 5 0.30

0.30 0.23 0.25 0.25

Top View
SHOWPDRWING

0 1 2 3 4 5

THE HASHEMITE KINGDOM OF JORDAN


MINISTRY OF WATER & IRRIGATION
WATER AUTHORITY
3.06 WATER AUTHORITY _JORDAN

OPENING
Consuttant :

Arab Dar Engineering Co.

CONTRACTOR:

MANASRH CONTRCTING CORPORATION


0.35 0.24
HDPE PIPE DN 180 3
0.25 0.50 Project Name
0.30 2 5 0.30
1

RESTRUCTRING,REHABILITATION
4 AND PRESSURE MANAGEMENT OF AIN AL-BASHA
0.23 0.25
0.50

TENDER NO. 21/2021/SW-FARA 4

Designed By: Location :


*****
Checked By: Abdalrahman Alkhandaq AIN ALBACHA

Approval By: Abdalrahman Alkhandaq Drawing Title :


Surveyor DM&PRV-N4

Side View
Maher Sarrar

Inspector ***** Re-checked By:


Abdalrahman Alkhandaq
Drawn By: Omar Albojok
Date : Drawing No.: Drawing Scale : Plot Scale :

06/12/2022 24 NTS 1/1


LEGEND:

Item Description Qty

1 Y strainer DN 50, PN25 1


2 Dismantling Joint DN 50, PN25 1
2.42 3 Gate Valve DN 50, PN25 1
4 Pressure Reducing Valve DN40, PN25 1
5 Electromagnetic Flow Meter DN 50, PN25 1
Steel Pipe DN 50 ----
Steel Pipe DN 100 ----
OPENING
ACCESS
LADDER

1.55
0.24 0.25
0.30 1 3 4 0.30
2 5

0.23 0.18 0.22 0.20

0.50
Top View
SHOWPDRWING

0 1 2 3 4 5

THE HASHEMITE KINGDOM OF JORDAN


MINISTRY OF WATER & IRRIGATION
WATER AUTHORITY

2.42
WATER AUTHORITY _JORDAN

OPENING

Consuttant :

Arab Dar Engineering Co.

CONTRACTOR:

MANASRH CONTRCTING CORPORATION


1.60

0.18
0.30 0.23 4 0.25 5
0.30 Project Name
1 2

RESTRUCTRING,REHABILITATION
3 0.22 0.20
0.50

0.24 AND PRESSURE MANAGEMENT OF AIN AL-BASHA


TENDER NO. 21/2021/SW-FARA 4

Designed By: Location :


*****
Checked By: Abdalrahman Alkhandaq AIN ALBACHA

Approval By: Abdalrahman Alkhandaq Drawing Title :


DM&PRV-N16A
Side View Surveyor
Inspector
Maher Sarrar

***** Re-checked By:


Abdalrahman Alkhandaq
Drawn By: Omar Albojok
Date : Drawing No.: Drawing Scale : Plot Scale :

06/12/2022 25 NTS 1/1


LEGEND:
Item Description Qty

1 Y strainer DN 100, PN25 1

3.07 2 Dismantling Joint DN 100, PN25 1


3 Gate Valve DN 100, PN25 1
4 Pressure Reducing Valve DN80, PN25 1
5 Electromagnetic Flow Meter DN 100, PN25 1
Steel Pipe DN 100 ----
OPENING PE Pipe DN 180 ----
ACCESS
LADDER

0.35
HDPE PIPE DN 180 0.24 0.32 0.50
1 2 3 4 5 0.30

0.30 0.23 0.25

Top View SHOWPDRWING

0 1 2 3 4 5

THE HASHEMITE KINGDOM OF JORDAN


MINISTRY OF WATER & IRRIGATION
WATER AUTHORITY
WATER AUTHORITY _JORDAN

3.06

Consuttant :
OPENING
Arab Dar Engineering Co.

CONTRACTOR:

MANASRH CONTRCTING CORPORATION

0.35 0.24
Project Name
HDPE PIPE DN 180 3
0.50
4
0.30 2 5
0.30
1 RESTRUCTRING,REHABILITATION
AND PRESSURE MANAGEMENT OF AIN AL-BASHA
TENDER NO. 21/2021/SW-FARA 4
0.23 0.25
0.50

Designed By: Location :


*****
Checked By: Abdalrahman Alkhandaq AIN ALBACHA

Approval By: Abdalrahman Alkhandaq Drawing Title :


Surveyor DM&PRV-N11
Maher Sarrar

Inspector ***** Re-checked By:

Side View Drawn By:


Date :

06/12/2022
Omar Albojok
Drawing No.:
Abdalrahman Alkhandaq

Drawing Scale : Plot Scale :

26 NTS 1/1
LEGEND:
2.70 Item Description Qty

1 Y strainer DN 80, PN25 1


2 Dismantling Joint DN 80, PN25 1
3 Gate Valve DN 80, PN25 1
4 Pressure Reducing Valve DN40, PN25 1
5 Electromagnetic Flow Meter DN 80, PN25 1
Steel Pipe DN 80 ----
PE Pipe DN 125 ----
OPENING
ACCESS
LADDER

1.55
0.30 0.310.20
0.240.27 4 0.40 0.20
1

3
0.22 5 0.30
2

Top View
SHOWPDRWING

0 1 2 3 4 5

THE HASHEMITE KINGDOM OF JORDAN


MINISTRY OF WATER & IRRIGATION
WATER AUTHORITY
WATER AUTHORITY _JORDAN

2.70

OPENING Consuttant :

Arab Dar Engineering Co.

CONTRACTOR:

MANASRH CONTRCTING CORPORATION


0.30 0.31
0.20 Project Name

3
4
0.40 0.30
1 RESTRUCTRING,REHABILITATION
AND PRESSURE MANAGEMENT OF AIN AL-BASHA
TENDER NO. 21/2021/SW-FARA 4
2 0.24 0.22 5
0.50

Designed By: Location :


*****
Checked By: Abdalrahman Alkhandaq AIN ALBACHA

Approval By: Abdalrahman Alkhandaq Drawing Title :


Surveyor DM&PRV-N10
Maher Sarrar

Side View Inspector

Drawn By:
*****
Omar Albojok
Re-checked By:
Abdalrahman Alkhandaq

Date : Drawing No.: Drawing Scale : Plot Scale :

06/12/2022 27 NTS 1/1


LEGEND:
Item Description Qty
2.70 1 Y strainer DN 80, PN25 1
2 Dismantling Joint DN 80, PN25 1
3 Gate Valve DN 80, PN25 1
4 Pressure Reducing Valve DN40, PN25 1
5 Electromagnetic Flow Meter DN 80, PN25 1
Steel Pipe DN 80 ----
PE Pipe DN 180 ----

OPENING
ACCESS
LADDER

1.55
0.30 0.310.20
0.240.27 4 0.40 0.20
1

2 3
0.22 5 0.30

Top View
SHOWPDRWING

0 1 2 3 4 5

THE HASHEMITE KINGDOM OF JORDAN


MINISTRY OF WATER & IRRIGATION
WATER AUTHORITY
WATER AUTHORITY _JORDAN

2.70

Consuttant :
OPENING
Arab Dar Engineering Co.

CONTRACTOR:

MANASRH CONTRCTING CORPORATION

0.30 0.31
0.20 Project Name

3
4
0.40 0.30
1 RESTRUCTRING,REHABILITATION
AND PRESSURE MANAGEMENT OF AIN AL-BASHA
TENDER NO. 21/2021/SW-FARA 4
2 0.24 0.22 5
0.50

Designed By: Location :


*****
Checked By: Abdalrahman Alkhandaq AIN ALBACHA

Approval By: Abdalrahman Alkhandaq Drawing Title :


Surveyor DM&PRV-U3
Maher Sarrar

Inspector ***** Re-checked By:


Side View Drawn By:
Date :
Omar Albojok
Drawing No.:
Abdalrahman Alkhandaq

Drawing Scale : Plot Scale :

06/12/2022 28 NTS 1/1


LEGEND:

2.42 Item Description Qty

1 Y strainer DN 50, PN25 1


2 Dismantling Joint DN 50, PN25 1
3 Gate Valve DN 50, PN25 1
4 Pressure Reducing Valve DN40, PN25 1
5 Electromagnetic Flow Meter DN 50, PN25 1

OPENING Steel Pipe DN 50 ----


ACCESS PE Pipe DN 125 ----
LADDER

1.55
0.30 3 4 0.30
1 2 5

0.50
Top View
SHOWPDRWING

0 1 2 3 4 5

THE HASHEMITE KINGDOM OF JORDAN


MINISTRY OF WATER & IRRIGATION
WATER AUTHORITY
WATER AUTHORITY _JORDAN

2.42
OPENING
Consuttant :

Arab Dar Engineering Co.

CONTRACTOR:

MANASRH CONTRCTING CORPORATION


1.60

3 Project Name
0.30 4 0.30
1
RESTRUCTRING,REHABILITATION
AND PRESSURE MANAGEMENT OF AIN AL-BASHA
5 TENDER NO. 21/2021/SW-FARA 4
0.50

Designed By: Location :


*****
Checked By: Abdalrahman Alkhandaq AIN ALBACHA

Approval By: Abdalrahman Alkhandaq Drawing Title :


Surveyor DM&PRV-U7
Maher Sarrar

Side View Inspector

Drawn By:
*****
Omar Albojok
Re-checked By:
Abdalrahman Alkhandaq

Date : Drawing No.: Drawing Scale : Plot Scale :

06/12/2022 29 NTS 1/1


LEGEND:

Item Description Qty


3.85
1 Gate Valve DN150, PN25 3
2 Dismantling Joint DN150, PN25 3
3 Y strainer DN150, PN25 1
4 Pressure Reducing Valve DN150, PN25 1
Steel Pipe DN 150 ----
Ductile Iron Pipe DN 300 ----
0.24
1.00 1.00
1

2.32
2
0.27

0.50
0.24 0.48 0.240.27 0.30
0.30 1 4
0.30

0.30
2 3
0.45 0.47 2
1
0.27

Top View SHOWPDRWING

0 1 2 3 4 5

THE HASHEMITE KINGDOM OF JORDAN


MINISTRY OF WATER & IRRIGATION
WATER AUTHORITY
WATER AUTHORITY _JORDAN

Consuttant :

Arab Dar Engineering Co.


3.85

CONTRACTOR:

MANASRH CONTRCTING CORPORATION

Project Name

1 0.24 1
0.48 0.45 RESTRUCTRING,REHABILITATION
1.70

0.30 4
0.30
2 3 2 AND PRESSURE MANAGEMENT OF AIN AL-BASHA
0.30

0.30
TENDER NO. 21/2021/SW-FARA 4

0.47 0.27
0.32 0.24
0.50

Designed By: Location :


*****
Checked By: Abdalrahman Alkhandaq AIN ALBACHA

Approval By: Abdalrahman Alkhandaq Drawing Title :


Surveyor Maher Sarrar PRV ON DI PIPE DN300

Inspector ***** Re-checked By:

Side View
Abdalrahman Alkhandaq
Drawn By: Omar Albojok
Date : Drawing No.: Drawing Scale : Plot Scale :

06/12/2022 30 NTS 1/1


LEGEND:

Item Description Qty

1 Gate Valve DN100, PN25 3


3.37 Dismantling Joint DN100, PN25
2 3
3 Y strainer DN100, PN25 1
4 Pressure Reducing Valve DN100, PN25 1
Steel Pipe DN 100 ----
Ductile Iron Pipe DN 200 ----
OPENING
ACCESS

0.75
LADDER

0.90 1 0.24
0.90

1.80
0.23

0.30

0.30
2
0.30 1 0.24 3
0.40 0.24 1 0.30
0.20

0.20
0.23 0.35 0.32

0.40
2 4 2 0.23

SHOWPDRWING

Top View
0 1 2 3 4 5

THE HASHEMITE KINGDOM OF JORDAN


MINISTRY OF WATER & IRRIGATION
3.37 WATER AUTHORITY
WATER AUTHORITY _JORDAN

OPENING

Consuttant :

Arab Dar Engineering Co.

CONTRACTOR:

1 1 MANASRH CONTRCTING CORPORATION


1.60

0.30 0.24 0.35 0.32 0.40 0.24 0.30 Project Name


0.20

0.20
RESTRUCTRING,REHABILITATION
0.23 2
4
2
0.23 AND PRESSURE MANAGEMENT OF AIN AL-BASHA
3 TENDER NO. 21/2021/SW-FARA 4

Designed By: Location :


*****
Checked By: Abdalrahman Alkhandaq AIN ALBACHA

Approval By: Abdalrahman Alkhandaq Drawing Title :


Surveyor Maher Sarrar
PRV N2 , N3

Inspector ***** Re-checked By:

Side View Drawn By:


Date :

06/12/2022
Omar Albojok
Drawing No.:

31 NTS
Abdalrahman Alkhandaq

Drawing Scale : Plot Scale :

1/1
LEGEND:

2.65 Item Description Qty

1 Gate Valve DN65, PN25 3


2 Dismantling Joint DN65, PN25 3
3 Y strainer DN65, PN25 1
4 Pressure Reducing Valve DN165, PN25 1
OPENING Steel Pipe DN 65 ----
ACCESS
LADDER

0.60
Steel Pipe DN 100 ----

0.65 0.18 0.65

1.60
1 0.24 2

0.35
1
0.24 0.15 0.22
0.30 3

0.18 0.23 0.28 0.18 0.30

0.40
2 4

Top View SHOWPDRWING

0 1 2 3 4 5

THE HASHEMITE KINGDOM OF JORDAN


MINISTRY OF WATER & IRRIGATION
WATER AUTHORITY
WATER AUTHORITY _JORDAN

2.65
OPENING
Consuttant :

Arab Dar Engineering Co.

CONTRACTOR:

MANASRH CONTRCTING CORPORATION

Project Name
1.50

1 4 2 1
0.24 3
0.15 0.24
0.30 RESTRUCTRING,REHABILITATION
AND PRESSURE MANAGEMENT OF AIN AL-BASHA

0.18 0.23 0.28 0.18 0.30 TENDER NO. 21/2021/SW-FARA 4


0.40

2
Designed By: Location :
*****
Checked By: Abdalrahman Alkhandaq AIN ALBACHA

Approval By: Abdalrahman Alkhandaq Drawing Title :


Surveyor Maher Sarrar ON STEEL PIPE DN100

Inspector

Side View ***** Re-checked By:


Abdalrahman Alkhandaq
Drawn By: Omar Albojok
Date : Drawing No.: Drawing Scale : Plot Scale :

06/12/2022 32 NTS 1/1


LEGEND:

Item Description Qty

1 Gate Valve DN80, PN25 3


2 Dismantling Joint DN80, PN25 3
3 Y strainer DN80, PN25 1
OPENING 4 Pressure Reducing Valve DN80, PN25 1
ACCESS
LADDER

0.60
Steel Pipe DN 80 ----
PE Pipe DN 180 ----
0.78 0.24 0.78

1.65
1 2
0.20

0.35

0.35
0.30 1 0.24 0.32 0.24 1
0.30
3

0.31 0.25

0.40
0.20 2 0.20
2 4

Top View
SHOWPDRWING

0 1 2 3 4 5

THE HASHEMITE KINGDOM OF JORDAN


MINISTRY OF WATER & IRRIGATION
WATER AUTHORITY
WATER AUTHORITY _JORDAN

3.00
OPENING

Consuttant :

Arab Dar Engineering Co.

CONTRACTOR:

MANASRH CONTRCTING CORPORATION

0.20
1.60

1 Project Name

0.24 0.31 0.32 0.30


0.30 3
2
RESTRUCTRING,REHABILITATION
AND PRESSURE MANAGEMENT OF AIN AL-BASHA
TENDER NO. 21/2021/SW-FARA 4
0.40

0.20 2 0.25 4 0.24 1

Designed By: Location :


*****
Checked By: Abdalrahman Alkhandaq AIN ALBACHA

Approval By: Abdalrahman Alkhandaq Drawing Title :


Surveyor PRV N9 & N6

Side View
Maher Sarrar

Inspector ***** Re-checked By:


Abdalrahman Alkhandaq
Drawn By: Omar Albojok
Date : Drawing No.: Drawing Scale : Plot Scale :

06/12/2022 33 NTS 1/1