001-AU-PKU-PRO-PSHP-IX-2021 - NDE Procedure & NDE Personel Certificate
001-AU-PKU-PRO-PSHP-IX-2021 - NDE Procedure & NDE Personel Certificate
001-AU-PKU-PRO-PSHP-IX-2021 - NDE Procedure & NDE Personel Certificate
1. Purpose 2
2. Scope 2
3. Reference Documents 2
4. Definitions 2
5. Information Required prior to Examination 3
6. Extent of Examination 3
7. Personnel Qualification 3
8. Procedure Qualification 4
9. Penetrant Materials & Equipment 5
10. Safety Precaution 5
11. Surface Preparation 6
12. Precleaning 6
13. Penetrant Application 6
14. Removal of Excess Penetrant 7
15. Drying after Excess Penetrant Removal 7
16. Application of Developer 7
17. Illumination 8
18. Interpretation and Evaluation of Indications 8
19. Acceptance Criteria 9
20. Recording of Indications 10
21. Post Examination Cleaning 10
22. Defect Repair 10
23. Reporting 10
2. SCOPE 2. RUANGLINGKUP
2.1. This written procedure is applicable for 2.1. Prosedur ini dipakai untuk sistem pengujian
color contrast (Type II), solvent removable cairan penetrant color contrast (Tipe II), yang
(Method C) penetrant system. dibersihkan dengan solvent (Metoda C).
2.2. This written procedure is applicable for 2.2. Prosedur tertulis ini dipakai untuk pengujian
liquid penetrant examination performed on cairan penetrant yang dilakukan pada
surface where the temperature is within permukaan material yang suhunya antara 20oC
20oC to 50oC throughout the examination hingga 50oC sepanjang pemeriksaan
period. berlangsung.
3. REFERENCEDOCUMENTS 3. DOKUMEN-DOKUMENREFERENSI
3.1. ASME Boiler & Pressure Vessel Code 3.1. ASME Boiler & Pressure Vessel Code Section I
Section I – Appendix A270, 2015 Edition, – Appendix A270, 2015 Edition, 2016 Addenda.
2016 Addenda.
3.2. ASME Boiler & Pressure Vessel Code 3.2. ASME Boiler & Pressure Vessel Code Section V
Section V - Article 6 & 24 (SE 165) 2015 - Article 6, & 24 (SE 165) 2015 Edition.
Edition.
3.3. ASME Boiler & Pressure Vessel Code Section
3.3. ASME Boiler & Pressure Vessel Code VIII Div. 1 – App. 8, 2016 Edition,
Section VIII Div. 1 – App. 8, 2016 Edition, .
3.4. ASME B31.3, Process Piping –,2016 Edition. 3.4. ASME B31.3, Process Piping– par.,2016 Edition.
3.5. PT. Indotimas Syifa Perkasa’s written 3.5. Written practice PT. Indotimas Syifa Perkasa
practice no. 01/ISyP/WP/V/2016, Rev. 00 nomor 01/ISyP/WP/V/2016, Rev. 00.
4. DEFINITIONS 4. DEFINISI-DEFINISI
4.1. Discontinuity: lack of continuity or uninten- 4.1. Diskontinuitas: ketidaksempurnaan atau gang-
tional interruption in the physical structure guan struktur fisik atau konfigurasi dari sebuah
or configuration of a material or component. material atau komponen.
4.2. Penetrant: a solution or suspension of a 4.2. Penetrant: suatu larutan atau suspensi
dye. pewarna.
6. EXTENTOFEXAMINATION 6. CAKUPANPENGUJIAN
6.1. The shape and size of the examined object, 6.1. Bentuk dan ukuran obyek yang diuji, dan
and extent of the examination shall be cakupan pengujiannya harus didasarkan pada
based on the appropriate drawing or gambar kerja atau dokumen kontrak yang ada.
contract document.
6.2. All welds shall be 100% visually examined 6.2. Semua sambungan las harus diperiksa visual
prior to liquid penetrant tested. 100% sebelum diuji penetrant.
7. PERSONNELQUALIFICATION 7. KUALIFIKASIPERSONIL
7.1. Qualification and certification of the NDT 7.1. Kualifikasi dan sertifikasi personil NDT harus
personnel shall be in accordance with PT. mengacu pada written practice PT. Indotimas
Indotimas Syifa Perkasa’s written Syifa Perkasa no . 01/ISyP/WP/V/2016, Rev.
practice no. 01/ISyP/WP/V/2016, Rev. 00. 00.
7.2. Personnel performing testing and deter- 7.2. Personil yang melakukan pengujian dan me-
mining the acceptability to the requirement nentukan penerimaan terhadap persyaratan
of this written procedure shall be qualified dari prosedur tertulis ini harus dikualifikasi dan
and certified as PT Level II or Level III. disertifikasi sebagai PT Level II atau Level III.
Essential Non-essential
Requirements Par. Reference
Variable Variable
Identification of and any change in type or family group of
X - 9.2, 9.3
penetrant materials including developers, emulsifiers, etc.
Surface preparation (finishing and cleaning, including type of
X - 11, 12
cleaning solvent)
Method of applying penetrant X - 13.2
Method of removing excess surface penetrant X - 14
Method of applying developer X - 16.3
Minimum and maximum time periods between steps and drying
X - 15
aids
Decrease in penetrant dwell time X - 13.3
Increase in interpretation time X - 18.2
Minimum light intensity X - 17.1
Surface temperature outside 20°C to 50°C or as previously
X - 13.1
qualified
Performance demonstration, when required X - Deleted
Personnel qualification requirements - X 7
Materials, shapes, or sizes to be examined and the extent of
- X 1.2, 6.1
examination
Post-examination cleaning technique - X 21
Penetrant SKL-SP2
Magnaflux Cleaner/remover SKC-S
Developer SKD-S2
9.4. A calibrated light meter shall be used to 9.4. Sebuah light meter yang terkalibrasi harus
check light intensity of the surface being dipakai untuk memeriksa intensitas cahaya
examined. pada permukaan benda uji.
NDT Certification
This is to certify that :
Uus Nurpadi
By virtue of work experience has completed 40 hours training of theory, practical and successfully
passed the examination according to the requirements of the ASNT recommended Practice
No. SNT – TC – 1A, 2001 edition is certified as
EXAMINATION RESULT
GRADE %
EXAMINATION PASSING ACTUAL STATUS
GENERAL 70 80 PASSED
SPECIFIC 70 80 PASSED
PRACTICAL 70 85 PASSED
COMPOSITE 80 85 PASSED
Spesific Code/Standard : ASME Sect. V ASME Sect. VIII and AWS D1.1