OOTB Reports - Semiconductor

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 25

TcRA OOTB Reports

Semiconductor

© Copyright
© © Copyright 2015 eQ Technologic,
2021 eQ Technologic, Inc.reserved.
Inc. All rights All rights reserved.
OOTB Reports Summary
© Copyright 2021 eQ Technologic, Inc. All rights reserved.
OOTB Reports Distribution
MRO, 10 Contract Data
Management, 6
Human
Resources, 1
Semiconductor, 8
Traceability, 4

Program
Machinery, 2
Planning, 3

Verification & Substance


Requirement, 7 Compliance, 6

Workflow, 4 RFA, 4

Structure
Management, 13

Change
Management, 22
Scheduler, 19

© Copyright 2021 eQ Technologic, Inc. All rights reserved.


Semiconductor Reports
© Copyright 2021 eQ Technologic, Inc. All rights reserved.
Semiconductor
 Types of reports covered –
– Dashboards
– Detailed List
– Metrics

 List of reports –
1. Ideation Effectivity Metric
2. Investment by Innovation Type Metric
3. NPI Cycle Time
4. NPI Project Labor Report
5. NPI Revenue - Target vs Forecast
6. OTD report for Sample Plan
7. R&D Metrics
8. Top N Project Dashboard

© Copyright 2021 eQ Technologic, Inc. All rights reserved.


Ideation Effectivity Metric
 This dashboard shows how many ideas move from idea to project planning and rest of the
project phases. It also gives a view of how ideas are distributed across various maturity phases
of NPI project based on selected criteria (timeframe) .
 Note : Ideas for which the Project events are still in progress and do not have the end
date(planned/forecast/actual end date) populated, will not be displayed in the report.

© Copyright 2021 eQ Technologic, Inc. All rights reserved.


Ideation Effectivity Metric

© Copyright 2021 eQ Technologic, Inc. All rights reserved.


Investment by Innovation Type Metric
 This dashboard shows how company investments are deployed. This report gives an idea of
innovation and breakthrough projects vs continuous improvement projects.
 The different categories are Technology Risk, Breakthrough, Replacement and Market Risk.

© Copyright 2021 eQ Technologic, Inc. All rights reserved.


Investment by Innovation Type Metric – Total Investment

© Copyright 2021 eQ Technologic, Inc. All rights reserved.


Investment by Innovation Type Metric – Active Projects Spend

© Copyright 2021 eQ Technologic, Inc. All rights reserved.


Investment by Innovation Type Metric – By Innovation Type

© Copyright 2021 eQ Technologic, Inc. All rights reserved.


NPI Cycle Time
 This Dashboard calculate the average cycle time of the selected projects as well as cycle time
by phase. This gives a good distribution of cycle time by phase as well as cycle time by month
giving a trend of cycle time based on the selected projects based on time, Business unit.
– Actual Cycle Time: Plan phase start to Pre-production phase complete
– Actual Plan phase time: Plan start to Plan complete
– Actual Development phase time: Develop start to develop complete
– Actual Proto phase time: Proto start to proto complete

 Note: This report needs EventNameMappingCube to fetch data and calculate the cycle time
correctly. If it is missing in the TcRA context, this report might not display correct data.
Importing the cube will ensure the report runs as expected.

© Copyright 2021 eQ Technologic, Inc. All rights reserved.


NPI Cycle Time

© Copyright 2021 eQ Technologic, Inc. All rights reserved.


NPI Project Labor Report
 This Dashboard calculates the total money spent for labor ( Target vs actual) based on
selected criteria ( Quarter, Business Unit, innovation type ) for all active projects by various
categories.

© Copyright 2021 eQ Technologic, Inc. All rights reserved.


NPI Project Labor Report

© Copyright 2021 eQ Technologic, Inc. All rights reserved.


NPI Revenue - Target vs Forecast
 This dashboard shows the sum of the product revenue of Target vs forecast revenue by project
innovation type for selected projects.

© Copyright 2021 eQ Technologic, Inc. All rights reserved.


NPI Revenue - Target vs Forecast – Dashboard

© Copyright 2021 eQ Technologic, Inc. All rights reserved.


NPI Revenue - Target vs Forecast – Tabular Representation

© Copyright 2021 eQ Technologic, Inc. All rights reserved.


OTD report for Sample Plan
 This Dashboard measures Delivery to the committed sample plan dates.
 For a Given month, the metric measures how many projects were sampled the first time on time
/ total number of projects due for sampling on the month. If the sample is done in a month(i)-n,
it is tracked as a count for month(i) vs if the sample is done month(i)+n , the count is 0 for the
month(i).

© Copyright 2021 eQ Technologic, Inc. All rights reserved.


OTD report for Sample Plan

© Copyright 2021 eQ Technologic, Inc. All rights reserved.


R&D Metrics
 This dashboard displays the tabbed report for the average Development Passes, Mask Set Ratio
and Days Late to Prototype Completion against the plan for a selected set of projects based on
time and Business unit.
 Sample calculations for Development Passes metrics:
Expectation or target is to have 1 for all projects
Consider Projects A1, B2, C3 are part of the BU selection in Q1 and
Project A1 had 3 pass and Project B2 had 1 pass and Project C3 had 2 pass
Hence, Average of 3 projects = 2 = ( (3+1+2)/3) for Q1
(assuming only these 3 projects completed development in Q1)
 Same holds for Mask Set Ratio:
Expectation is to have 1 mask Set/project. In other words only 1 Tapeout/project.
 Sample calculations for Days Late to Proto Complete:
Target : No project should be late, it can be early or on-time.
P1, P2, P3 were supposed to be complete proto in Q1 but
P1 on time and P2 late by 7 days and
P3 could not finish and will spill to next quarter (Using the forecast date, it is to be 26 days late)
Hence, Average = (0+7+26)=33/3= 11 days late for Q1

 Note: This report needs EventNameMappingCube to fetch data and calculate the cycle time
correctly. If it is missing in the TcRA context, this report might not display correct data. Importing
the cube will ensure the report runs as expected.
© Copyright 2021 eQ Technologic, Inc. All rights reserved.
R&D Metrics – Development Passes

© Copyright 2021 eQ Technologic, Inc. All rights reserved.


R&D Metrics – Maskset Ratio

© Copyright 2021 eQ Technologic, Inc. All rights reserved.


Top N Project Dashboard
 Default and recommended Top 10 WIP projects with the highest Net Present . The list also
includes projects which are strategic and selected by executive management.

© Copyright 2021 eQ Technologic, Inc. All rights reserved.


Top N Project Dashboard

© Copyright 2021 eQ Technologic, Inc. All rights reserved.

You might also like