Professional Documents
Culture Documents
OOTB Reports - Semiconductor
OOTB Reports - Semiconductor
OOTB Reports - Semiconductor
Semiconductor
© Copyright
© © Copyright 2015 eQ Technologic,
2021 eQ Technologic, Inc.reserved.
Inc. All rights All rights reserved.
OOTB Reports Summary
© Copyright 2021 eQ Technologic, Inc. All rights reserved.
OOTB Reports Distribution
MRO, 10 Contract Data
Management, 6
Human
Resources, 1
Semiconductor, 8
Traceability, 4
Program
Machinery, 2
Planning, 3
Workflow, 4 RFA, 4
Structure
Management, 13
Change
Management, 22
Scheduler, 19
List of reports –
1. Ideation Effectivity Metric
2. Investment by Innovation Type Metric
3. NPI Cycle Time
4. NPI Project Labor Report
5. NPI Revenue - Target vs Forecast
6. OTD report for Sample Plan
7. R&D Metrics
8. Top N Project Dashboard
Note: This report needs EventNameMappingCube to fetch data and calculate the cycle time
correctly. If it is missing in the TcRA context, this report might not display correct data.
Importing the cube will ensure the report runs as expected.
Note: This report needs EventNameMappingCube to fetch data and calculate the cycle time
correctly. If it is missing in the TcRA context, this report might not display correct data. Importing
the cube will ensure the report runs as expected.
© Copyright 2021 eQ Technologic, Inc. All rights reserved.
R&D Metrics – Development Passes