Professional Documents
Culture Documents
(Email-Comdtord@Bsf - Nic. In) (Fax: 011-24367683) : - W 3Ttr C4 3Mch U - RFLFCTT/ FCTC CTT T ?
(Email-Comdtord@Bsf - Nic. In) (Fax: 011-24367683) : - W 3Ttr C4 3Mch U - RFLFCTT/ FCTC CTT T ?
(Email-Comdtord@Bsf - Nic. In) (Fax: 011-24367683) : - W 3Ttr C4 3Mch U - RFLFCTT/ FCTC CTT T ?
R R R 'H'icbN, ^
R £lPl<^'[TR R # R T RRSTT Ret
( t r r P i ^ iM ii: s n ^ r ^ f R R 3 c r)
3. y fc lR b R I RR 3TRRfR f^ R T TRTcTT t |
Government of India
Ministry of Home Affairs
Directorate General Border Security Force
(Prov Dte: Mod Cell)
Block No.10, CGO Complex, Lodhi Road, New Delhi-03
(Fax: 011-24367683, Email-comdtord@bsf.nic.in)
1. The draft QRs/TDs of following items are attached as Appendix ‘A’ to ‘F\ The
OEMs/Vendors are requested to forward information of the product, which they can
offer and also forward correct specifications of their system against each parameter.
Only complied or not complied remarks will not be accepted. The firms are also
requested to furnish the following details:-
fcRtWf d^ vTd R Jd IRT d ? Pl^Rld f^JT ddT t % ddxT 4,41444? 3TTdddd?c[T d>T 3Tf^p tdcTT dRFf cfr feP? ^ Hdldd Vd #4T TJTSTT ddt d?t
td R lfd dd fMdT3fi/WRf d^ ^ §M dTVT d?Wf t g 15 f^Tt cfr fvtV STTcTHg % R RTV I
d te - dPft fadRT3Tt/dRf df f^T d d t f% 3144 d ^ lc fi d> RTST f^ P R f^ te 4?HM!d VTRH dR f - ^ c t RTT comdtocd(»bsf.nic.in dd *fdFT dd 4 4
dR-
12. Test Chamber Door The test chamber shall be completely shield by a door i.e. BOO will check physically. OEM/Firm
hinged on the left and opens fully for easy access. It shall be should submit the Lab Test certificate
made of corrosion resistance stainless steel plate and equipped from NABL accredited Lab for the same.
with high quality insulation.
13. Control and Monitoring Microprocessor based humidity control and monitoring system
System shall be provided and have following features;
1. Provision for interface with computer
SI. SPECIFICATION TRAIL DIRECTIVE Complied/ Not
No Complied
2. Password protection provided
3. Graphical representation of set point and actual value
4. Digital display of set point and actual value of humidity
5. Digital input of humidity in manual and automatic
operation
6 . Fault and diagnosis system
7. Equipped with PLC & HMI have features like DATA logging BOO will check physically.
8. Chart Recording
9. USB Port
10. Printer Facility
11. 50 Programs setting with SV & PV & maintenance free
electronic humidity sensor.
14. Temperature/ Humidity Machine should be designed with customized temperature and BOO will check physically.
humidity range for accurate results,
• High humidity with high temperature range
• Low humidity with low temperature range
• Uniform temperature with variable humidity range
• Uniform humidity with variable temperature range
15. Noise <76 db at a distance of 1mtr BOO will check physically. OEM/Firm
should submit the Lab Test certificate
from NABL accredited Lab for the same.
16. Ingress Protection IP 32 for the switch and cabinet OEM/Firm should submit the Lab Test
certificate from NABL accredited Lab for
the same.
17. Construction Interior chamber made with complete SS 304 & exterior can be BOO will check physically. OEM/Firm
MS powder coated or rust free SS 304 for long life. Heavy duty should submit the Lab Test certificate
rugged designed steel wire adjustable shelves with easy from NABL accredited Lab for the
maintenance. Outer door comes with glass window, lockable
handle, glass wool insulation, silicon gasket and heating tube
for moisture removal. Should be mounted on four caster wheels
with two lockable wheels for easy mobility.
18. Heating System Should provide uniform heating inside the chamber BOO will check physically.
19. Humidity System Inbuilt stainless steel water tank with water heater to generate BOO will check physically. OEM/Firm
humidity inside the chamber. Water heater used in the tank should submit the Lab Test certificate
should be according to international standard for proper from NABL accredited Lab for the same.
Si. SPECIFICATION TRAIL DIRECTIVE Complied/ Not
No Complied
heating and moisture generation with quality low water cut off.
The system should also have an overflow valve facility in case
of self-filling of water from the source.
20 . Air Circulation System Suitable motor with impeller for uniform temperature and BOO will check physically.
humidity system
21. Computer Interface RS 232/RS 485 for computer connectivity and data storage BOO will check physically.
USB port for data transfer
22 . Safety Features Circuit Breaker BOO will check physically.
Over Temperature Protection
Door Opening Alarm
High Temperature and low Temperature Alarm
23. Power Supply The chamber shall work on 415 Volt, 50 Hz and 2 Phase main BOO will check physically.
supply
24. Installation All installation will be carried out by the firm. Under taking in this regard must be
obtain from firm.
dcfr'flcfft fc| ^1q 51) c£ \jc f g K I 'JT? Pl^Fdd fchdl '•N l t? 1% vi<+d JJ>U11cl -H<^> ^|c )^i|c h d l cf>t 3tf£|cf} sf??R s R l^ ^ fd q /p? ^ d l d d V4 /fN l Tj/STT
ifR ^ ^RTT fz 4R 1 ^ c T T 3 ff/ 1RFff 4> R pT4 PTTRT 4RRT 15 f M 4> 3 N d W f^RTT R fR I
3. Temperature Range -50 Deg C to +180 Deg C BOO will check physically.
4. Temperature Regulation Better than -0.5 Deg C BOO will check physically.
5. Average Heating Rate Better than 3 Deg C per minute in the entire range of BOO will check physically.
temperature
6. Average Cooling Range Better than 2 Deg C per minute in the entire range of BOO will check physically.
temperature
7. Test Space Dimension Width = Approx 1000 mm min. BOO will check physically.
(Interior Dimension) Depth = Approx 1000 mm min.
Height = Approx 1000 mm min.
8. Housing 1. The chamber must be of mono-block construction
which compromise all system necessary for BOO will check physically. OEM
operation. Certificate should be submitted by the
2. The outer housing shall be made from light weight, firm /Supplier.
self-supporting galvanized sheet-steel of 14 swg
gauge (approx 2 mm) and outside primed and
painted to standard finish with high quality material.
3. The exterior surface shall have corrosion-resistance
and high wear resistance.
9. Insulation The insulation between the test chamber and exterior BOO will check physically .OEM
housing must be of environmental friendly and Certificate should be submitted by the
guarantees best insulation value and minimum operating firm /Supplier.
cost. The insulation shall be of multi layered with double
vapour barrier. Asbestos free mineral fiber insulation is
preferred.
10. Door 1. The door must be of lockable type with hinges on
right hand side and self-open fully for easy access
SI. No SPECIFICATION TRAIL DIRECTIVE Complied/Nof
complied
and must be provide with high quality insulation.
2. The exterior of the door shall be made of galvanized
sheet-steel of 14 SWG gauge (approx 2 mm) and BOO will check physically. OEM
outside primed and painted to a standard finish with Certificate should be submitted by the
high quality materials. firm /Supplier.
3. The inner side of the door shall be made of 19 SWG
gauge thickness (approx 1 mm) nonmagnetic
stainless steel.
4. The door must be provided with double continuous
seal rings of silicon rubber material.
5. The door is to be provided with a multipane
toughened glass inspection window with built in
heaters. The size of window shall be 450 x 600 mm
or larger.
11. Illumination /lighting of The chamber must be provide with a light and a switch BOO will check physically.
test space to illuminate the test space during the test to help visual
inspection
12. Shelf The chamber must be provided with 05 adjustable BOO will check physically.
shelves which is easily removable and adjustable to any
height.
13. Ports The chamber must be provided with a port of minimum BOO will check physically.
125 mm diameter on the right side and 50 mm dia on the
left hand side of the test space. The port must be
centrally locked on the sides. Suitable rubber cap are to
be provided to close the port air tight.
14. Casters The test chamber shall be moved easily to different BOO will check physically.
location using 4 castor wheels and of which 2 are
preferably fitted with brakes.
15. Chamber Regulation and The chamber shall be provided with PC based control
Programming and monitoring systems with following features; BOO will check physically.
1. Selection of manual and automatic modes.
2. Shall be possible to create temperature programme
with immediate graphical check programming.
3. Integrated programme with a programming memory
for 99 test programme minimum.
SI. No SPECIFICATION TRAIL DIRECTIVE Complied/Not
complied
4. Built in capability to restart the test chamber after
failure.
5. RS 232/RS 422/RS 485 interface for
communication with computer
6 . Provision t print any test report in text format and
graphical format.
7. The display and control panel should be in the front
side of the chamber.
16. Safety and Protection The over temperature protection for test specimen. A BOO will check physically.
steady state over heating safety thermostat shall be
installed that automatically switches off the heater if the
chamber temperature range is exceeded.
17. Power Supply The chamber shall work on 415 Volt, 50 Hz and 2 Phase BOO will check physically.
main supply
18. Installation All installation will be carried out by the firm. Under taking in this regard must be
obtain from firm.
f M w f 4> 7T>^ £T7T f^Tff%RT f^TT w if e ^4 tT f l M W 3T1^TWT c|>r 3Tf£t4> t?cTR ^HFl 4> feH? ^ H'STeTO Tjcf ^ffpRT 7J?STT sfeT
$4*11j g 47 fM rT T 3#/W ^ 4T4T 4>7^ #d, 15 f^ ff ^ feT^ m effs f%4T ^ I
- RPft f^ T T ^ ff/^ R t 71 Pl^kH t f% 34F1 ^ujcff efr 71T2T PTHfelRfkT 444444 W F f 47 f-^eT 44T comdtord@bsf.nic.in 47 i|4T^ 44 44
4>7:—
754 cuhi^
A ppendix-‘D’
Draft QRs/TDs of Shock Test Station
SL. SPECIFICATIONS TRAIL DIRECTIVE Complied/
NO Not complied
1. General Description:- Shock Test Machine is a versatile test equipment to carry out shock tests in accordance with various National
& International Standards e.g. IEC 60068-2-27, IS 9000 Pt VII - 1979, JSS 55555 & MIL STD-810G, standards.
2. Table Size 750 mm x 750 mm min. BOO will check physically.
5. Max Payload Size 750 mm x 750 mm min. BOO will check physically.
8. Velocity Change (no load) 10 m/s Firm should submit the Lab Test certificate
from NABL accredited Lab for the same.
9. Velocity change (full load) 8 m/s
10. Pulse Shape Half Sine BOO will check physically.
Optional
Saw tooth, Square Wave, Trapezoidal wave form
11. Shock Rate 1-8 Shocks/min BOO will check physically.
RtR -RT»ft ftRfRTRTT/RFff Rl f^TRR t f% 3RFf RpTRf ^ RTTR PlMfaRsId R>HMId RTRFR RR? f-^fef RRT comdtord<g>bsf.nic.in RR ^fRFf
RR RR Rf^:—
g)
h) Armature Dia 440 mm BOO will check physically.
k) Insert Pattern on Armature No. of Inserts (Total - 17) BOO will check physically.
(*> Centre 1
(* 200 mm - 08 Nos
(® 400 mm - 08 Nos
1) Shaker Cooling System Forced Air BOO will check physically.
n) Body Suspension Natural Less than 2.5Hz BOO will check physically.
Frequency(Thrust Axis)
SL DESCRIPITION SPECIFICATION TRIAL DIRECTIVE Complied/
NO Not complied
o) Shaker mounting Air isolated, Trunion rotation assembly to orient the shaker BOO will check physically.
for vertical and horizontal operation with Head expander &
Slip table respectively.
P) Testing Axis All three (x, y and z) BOO will check physically.
3, Cooling Blower
a) Type Switching type air cooled, should be matched with shaker to BOO will check physically.
achieve the rated Sine, Random and Shock testing
capabilities. Amplifier shall be compatible with ail standard
controllers
b) Variable field control Amplifier should accommodate the Field power supply BOO will check physically.
transformer and related circuits. Field power supply system
should incorporate easily variable controlled field supply
c) Rated output Capacity 48 kVA Minimum OEM Certificate should be
submitted by the firm /Supplier.
d) Signal-to-noise Ratio > 70 dB NABL Certificate should be
submitted by the firm /Supplier.
e) Signal to Noise Ratio 60dB 60dB Minimum NABL Certificate should be
Minimum submitted by the firm /Supplier.
f) Amplifier Efficiency 90% Minimum OEM Certificate should be
submitted by the firm /Supplier.
g) Power Module The power module should have independent cooling unit BOO will check physically.
and RFI Filters
h) Power Loss Protection The amplifier should have synchronized loss protection BOO will check physically.
facility to have a smooth shut down in the event of power
amplifier
0 System Interface The amplifier should have Microprocessor based user BOO will check physically.
interfaces which improves reliability and fault diagnosis of
the system
SL DESCRIPITION SPECIFICATION TRIAL DIRECTIVE Complied/
NO Not complied
j) Protection Integral protection to prevent output devices from working BOO will check physically.
outside their specified limits
k) Power Supply Wiring suitable for 415 VAC - 10%, 50 Hz - 2 FHz, 3 Phase, BOO will check physically.
4 Wire supply.
5, Digital Vibration Controller
0 Built in power source Built in power source for IEPE type accelerometers. BOO will check physically.
g) Fault indicators & safety Control signal checks for input over load, open loop, loss of BOO will check physically.
features control signal, incorrect conditioning, transducer cable
break indication etc.
h) Emergency shut-down Abort button for emergency shutdown. BOO will check physically.
i) Test documentation Provision for taking the print out of the signal plots, test data BOO will check physically.
set up parameters, test parameters, drive spectrum, last
control etc.
j) Power supply 220V - 10 %, 50 - 2 Hz, Electric supply with Indian socket BOO will check physically.
will be provided at HAL site. Adaptor & necessary cable (if
any) to be provided to suite above.
6. Software for Vibration Controller
Sweep Rate:
b) Definition of any segment by: Acceleration, Velocity, BOO will check physically.
Displacement, Sloped Acceleration.
c) Individual Alarm & Abort level definition for each BOO will check physically.
segment.
d) Importing of reference spectrum from a stored file. BOO will check physically.
a) Provision should exist for multiple Dwell frequency BOO will check physically.
definition within a single test.
b) Configurable wrt:
Number of spectral lines: User selectable from 100 to 3200. BOO will check physically.
Output signal:
a) True Gaussian with minimum 3-sigma control. BOO will check physically.
b) Provision for Drive clipping with the following user BOO will check physically.
definable parameter:
i) Sigma level between 2 to 6 . or BOO will check physically.
a) Number of Break points or segments > 50. BOO will check physically.
c) Scaling of the spectrum by defining overall g RMS level. BOO will check physically.
d) Individual alarm/abort level definition for each BOO will check physically.
segment.
e) Importing of reference spectrum from a stored file. BOO will check physically.
a) Power Spectral Density function of a given channel. BOO will check physically.
SL DESCRIPITION SPECIFICATION TRIAL DIRECTIVE Complied/
NO Not complied
b) Transmissibility - Amplitude and phase transfer function BOO will check physically.
of a channel with respect to another channel.
c) Along with the display of the plot of the select channel, BOO will check physically.
statistical parameters to be displayed like Test Time, g RMS,
Maximum & Minimum Amplitude with frequency.
8. Horizontal Slip Table Assembly
a) Type Oil film guided with linear/ hydrostatic bearing BOO will check physically.
b) Slip Plate Dimension Minimum 800 mm x 800 mm BOO will check physically.
0 Coupling / Drive Bar Magnesium Alloy Drive bar type for vibrator coupling. NABL Certificate should be
submitted by the firm /Supplier
g) Cross Axis Sensitivity <5% BOO will check physically.
h) Slip table mounting On a combined base with Shaker. BOO will check physically.
i) Railing Guard Around Slip Table Bed for safety BOO will check physically.
j) Power Supply Wiring suitable for 415 VAC - 10%, 50 Hz - 2 Hz, 3 Phase, BOO will check physically.
4 Wire supply.
9. Head Expander
e) Railing Guard Around Head Expander for safety BOO will check physically.
0 Bolts 04 Set of suitable bolts to be supplied to attach head BOO will check physically.
expander with shaker plate.
SL DESCRIPITION SPECIFICATION TRIAL DIRECTIVE Complied/
NO Not complied
10. Miniature single axis IEPE mode Features:
Accelerometer
a) Quantity: 04 nos. BOO will check physically.
d) Mounting: Flat mounting surface for adhesive mount. BOO will check physically.
m) Genuine Licensed copy of Windows 10 or higher, 64 bit BOO will check physically.
operating system.
12. Printer Network ready multifunction Laser Colour Printer required BOO will check physically.
for plotting test profiles with Temperature and Vibration
plots in different colours.
SL DESCRIPITION SPECIFICATION TRIAL DIRECTIVE Complied/
NO Not complied
13. Air Compressor Air Supply Capacity 8 Bar (Minimum) BOO will check physically.
Interlock and System Level Indication Amplifier should have all standard safety interlocks and
Protection monitoring.
a) Interlocks:
F fe - f ^ ? T T 3 l t / X R f f F t P l^ k H t f % 3 T F l F ^ R T t F> W T P i H f e l f e d c b H M I d F e T R F R f - x l c T W c tord@bsf.nic.in xr
*RRt FT FF F>/:—
1. \5?TR F?t c|K-dPlcb ftFWT ^Rdcbl |
2. M K F?T FT% fcfF FFFT FT ^ T T I
3. JJ>ulldH'+> 31|c|^i|cbdl3ft F> R IR oqTXTF f^ R X jM I
C.
vHT F F f t
Appendix-‘F’
Draft QRs/TDs of Bump Test Station
18. Accelerometer with Standard one No Piezo-electric accelerometer. BOO will check physically and Firm should
cable submit the Lab Test certificate
From NABL accredited Lab for the same.
19. Elastomeric Pads To achieve desired pulse duration vendor should provide BOO will check physically.
suitable elastomeric pads and lift mechanism control.
20 . Safety Interlocks Main input BOO will check physically.
Over & Under Voltage
Phase Drop
Programmer Pad Change Protection
Over Travel
Safe Brake
21. Installation All installation will be carried out by the firm. Under taking in this regard must be obtain
from firm.
M w f efr RV sTRT RF f^RfacT f^TT TRT t 1% R3R J,U11 H<+> 3MWRTT ST^FF %FcF? iRFl cfc fcfTJ ^JF W ^ #TT ^fSTT Wet
ts R T I^ F? f^ T T 3 ff/F R t ^ VJ5M H M ^F F f t g 15 f M ^ fe R 3TFRT5 fcfFTT R R |
cfT^:—