Professional Documents
Culture Documents
Brochure Monteverde Update13 Sept 2021
Brochure Monteverde Update13 Sept 2021
AIRPORT
JATIASIH
TOLL EXIT
CILEUNGSI
TOLL EXIT
CIBUBUR
TOLL EXIT
AD
G TOLL RO
IS-CIBITUN
JATIKARYA
CIBUBUR TOLL EXIT
CIMANGG
LRT ST
CIMANGGIS
TOLL EXIT
Toll Road
Arteri Road
The Newest Cimanggis - Cibitung Toll
LRT Track
MARKETING GALLERY :
Jl Raya Cibubur - Cileungsi, Cileungsi 16820
All information contained in this brochure is correct and based on the situation by the time the brochure is being created. The illustration is provided to support the information given.
The developer has full rights to make any changes based on the real condition at any time without giving any announcement before.
CLUSTER LIVISTONA
CLUSTER APHANDRA
Livistona 1 (Lebar 5 - 1 Lantai)
Aphandra 1 (Lebar 10 - 2 Lantai)
Livistona 2A (Lebar 6 - 1 Lantai)
Aphandra 2 (Varian)
Livistona 2B (Lebar 6 - 1 Lantai)
Aphandra 3 (Varian)
CLUSTER ARECA
SPESIFIKASI
PONDASI : Batu Kali
STRUKTUR : Beton Bertulang PINTU KUSEN : Alumunium
DINDING : Bata Ringan diplester Pintu Utama : Engineering Door AIR BERSIH : Standar PDAM
aci, dan finish cat Pintu Kamar : Engineering Door
LANTAI : Homogeneous tile Pintu KM/WC : Engineering Door LISTRIK
Rumah 1 LT : 1300VA
LANTAI & DINDING KM/WC PLAFOND : Gypsum Board Rumah 2 LT : 2200VA
Rumah 1 LT : Keramik Rangka Atap : Baja Ringan
Rumah 2LT : Homogeneous tile SANITAIR : Closet Duduk
Penutup Atap : Genteng Beton
APHANDRA CARYOTA 2
2 2
KAVLING 10X20M KAVLING 7X15M
LB. 139 | LT. 200
TIPE A : LB. 56 | LT.105
2+1 1 1+1
600
600
600
600
175
300
1700
1700
490
150
600
275
350
160
500
500
450
450
307.5 70 422.5 327.5 222.5 250
800 800
ATTALEYA 2
KAVLING 7X17M2
caryota 5
2
KAVLING 8X17M
LB.121 | LT.136
160
300
300
300
140
2
KAVLING 6X15M KAVLING 6X10M2
135
150
300
300
LB.82 | LT.90 LB. 55 | LT. 60
1000
1000
150
265
100
100
400
300
300
300
100 200 300 115 185 300
600 600
livistona 1
2
KAVLING 5X12M
LB.30 | LT.60