Download as pdf or txt
Download as pdf or txt
You are on page 1of 8

HOW TO ACTIVATE PEAK LOAD

SHIFTING

ATC GH Power Department


Prepared and reviewed by:
Fred A. Darko
Abdul Armah
Emmanuel Quarshie
Feb 2021

PROPERTY OF ATC GHANA. STRICTLY NOT FOR SALE.


NCU (M830B) - PEAK LOAD SHIFTING ACTIVATION

Go to Settings -> Battery Charge -> Scroll down and Enable Peak Load Shift Enable ->
Set Peak Load Shift Voltage (1.5V added to DG start voltage) -> Set Peak Load Period 1
start time to 3AM and Period 1 stop to 3PM
PROPERTY OF ATC GHANA. STRICTLY NOT FOR SALE. 2
ORION – PEAK LOAD SHIFTING ACTIVATION

To enable peak load


shifting on the Orion
controller;

1. Click on control.
2. Click on RS Latch.
3. Trigger “L.S. Enable”

PROPERTY OF ATC GHANA. STRICTLY NOT FOR SALE. 3


ORION - PEAK LOAD SHIFTING VOLTAGE

Next, set the peak


load shifting voltage;

1. Click on
Configuration.
2. Click on Battery.
3. Click on Event
controlled charge.
4. Click on Edit as
indicated

PROPERTY OF ATC GHANA. STRICTLY NOT FOR SALE. 4


ORION - PEAK LOAD SHIFTING VOLTAGE

Input the Peak load


shifting voltage
which is 1.5V added
to the DG start
voltage.

Next, Click on accept


changes.

PROPERTY OF ATC GHANA. STRICTLY NOT FOR SALE. 5


ORION - PEAK LOAD SHIFTING TIME

Select Configuration -> Signal Processing Engine -> Event Processing ->
Scroll down to L.S. Timer -> Select Edit
PROPERTY OF ATC GHANA. STRICTLY NOT FOR SALE. 6
ORION - PEAK LOAD SHIFTING TIME

Set the Start Time at 3AM and End Time at 3PM. Make sure all the days are selected.
Finally, click on Change Definition.
PROPERTY OF ATC GHANA. STRICTLY NOT FOR SALE. 7
Thank You
8