TIME SCALED PERT/CPM DIAGRAM

CONTRACT ID : 21IO0036
PROJECT NAME : CONSTRUCTION OF STORM SURGE PROTECTION: CALOGCOG BACKWATER DIKE,
LEFT BANK, BRGY. BUNTAY, TANAUAN, LEYTE.

CONTRACTOR : SUNWEST CONST. AND DEV'T. CORP./L.N.R CONSTRUCTION (J.V.)

Contract Duration : 300 Calendar Days

Contract Amount : P94,857,278.32

B.14
ENVIRONMENTAL MANAGEMENT & MONITORING

B.7(2)
OCCUPATIONAL SAFETY & HEALTH PROGRAM ,

300 CD

B.4(10) 801(1)
MISC. SURVEY REMOV. OF
& STAKING STR. & OBS.
B.5, B.9 1700(3)a1
INDIVIDUAL REMOVAL
PROJECT
OF TREES
BILLBOARD,
MOBILIZATION 1700(1) 404(1)a , 1724(15)a4
B.15(1) CLEARING &
1701(1) 404(1)b , 405(1)a3 RECTANGULAR FLAP GATE, 1220mm DIA.
DETOUR/
GRUB.
UNSUITABLE
1717(5)a2 1710(2)a REINFORCING STEEL G40, STRUCTURAL CONCRETE, 20.60 MPa, 200(1) 311(1)b 500(3)b2 B.9
1 2 ACCESS RD. 3 4 6 9 10 12 13 14 15 16 17
LEGEND : CRITICAL PATH EXC, Furnishing and Driven of Steel Sht. Piles, U-type, Grade 50 GROUTED RIPRAP, ''CLASS A'' REINFORCING STEEL G60 CLASS A, 28DAYS AGGREGATE SUBBASE COURSE PCC PAVEMENT (UNREINF., 0.20M THK.) - 14DAYS LINED CANAL, V-SHAPE DEMOB

0 0 4CD 4 4 20CD 24 24 30 30 30CD 60 60 73 CD 133 133 32CD 165 165 34CD 199 199 41CD 240 240 15CD 255 255 25CD 280 280 11CD 235 235 9CD 240 240

6CD

1704(1)b
EMBANKMENT FR.
STR. EXCAVATION

1702(1)a 1712(1)
5 STRUCTURE EXC., 11 407(8)
COMMON SOIL 7 BED COURSE GRAN.
MATERIAL 8 LEAN CONCRETE

43 43 62CD 105 105 16CD 121 121 188 188 11 CD

START OF PROJECT END OF PROJECT

BAR CHART, S-CURVE

100 %

80 %

60 %

40 %

20 %

0%

PROJECT: PREPARED BY: CHECKED/SUBMITTED BY: RECOMMENDING APPROVAL : APPROVED :

PAGE 1 OF 1
GRACE JOY L. MAGDATO SANDY T. PUA NAJIB D. DILANGALEN, CEO VI NERIE D. BUENO, CESO III
Authorized Representative CHIEF , CONSTRUCTION DIVISION OIC - ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
SUNWEST CONSTRUCTION AND DEVELOPMENT CORP.