Professional Documents
Culture Documents
Chapter 1-2 Group 20 Updated
Chapter 1-2 Group 20 Updated
College of Engineering
Department of Civil Engineering
A Multi-Storey Parking Building with Food Park and Energy Panel with General
Provisions of Geotechnical Engineering
Title Page....................................................................................................................................i
Table of Contents………………………………………………………………………….. ………....ii
List of Abbreviations………………………………….………………………………….…………...iii
List of Tables…………………………………………………………………………………………...iv
List of Figures……………………………………………………………………………..... ………...v
ii
LIST OF ABBREVIATIONS
Ma - Maximum moment
Mc - Factored Moment
t - thickness
iii
LIST OF TABLES
Table 2. 1 Typical Beams Initial Members Grid A-K (USD) ....................................................................... 17
Table 2. 2 Typical Beams Initial Members Grid 1-7 (USD) ....................................................................... 18
Table 2. 3 Typical Beams Initial Members Grid A-K (WSD) ...................................................................... 19
Table 2. 4 Typical Beams Initial Members Grid 1-7 (WSD) ...................................................................... 20
Table 2. 5 Typical Column Initial Members............................................................................................. 21
Table 2. 6 Typical Foundation Initial Members ....................................................................................... 22
Table 2. 7 Initial Beam Sizes (LRFD) ........................................................................................................ 24
Table 2. 8 Initial Beam Sizes (LRFD) ....................................................................................................... 25
Table 2. 9 Initial Column Sizes (LRFD) ..................................................................................................... 26
Table 2. 10 Initial Column Sizes (LRFD) ................................................................................................... 27
Table 2. 11 Initial Beam Sizes (ASD) ....................................................................................................... 29
Table 2. 12 Initial Beam Sizes (ASD) ....................................................................................................... 30
Table 2. 13 Initial Column Sizes (ASD) .................................................................................................... 31
Table 2. 14 Initial Column Sizes (ASD) .................................................................................................... 32
LIST OF FIGURES
v
CHAPTER 1: PROJECT
BACKGROUND
THE PROJECT
The multi-story parking building with a food park shall be constructed along with
Batangas, Tabangao, Lobo Rd, Batangas, it will have a lot area of approximately 2900
square meters. The parking building will be designed to provide parking for the sports
complex near the location.
The project will serve its purpose as a parking space for tourists aiming to enjoy
the beach and also to serve food and refreshments to locals and visitors alike. It can
also be parking for other vehicles that have no parking near their houses and for the
customers of the food park located on the roof deck of the parking building. The parking
building also has a food park that will be open to the public.
As an effort to reduce the total energy cost of the structure, a solar panel system
is to be placed on the building's roof deck to harvest solar energy during the day. In
addition to saving energy costs, solar power is pollution-free and causes no greenhouse
gases to be emitted after installation. It will also reduce the need for fossil fuels. The
system also harvests energy during overcast conditions. Initial installation costs would
seem high, but the return in savings, in the long run, would be greater than using
conventional power lines.
1-1
PROJECT OBJECTIVES
This project aims to design the parking building with food park that will provide a
parking space for the community of Ilijan.
Specifically, this project aims to:
• To apply modern tools such as Sketch Up, AutoCAD, Microsoft Word, Microsoft
Excel, and STAAD in structural design to provide necessary architectural and structural
plans
• To design the parking building which will comply to the requirements of the
National Structural Code of the Philippines (NSCP) 2015
• To create a structure that will help commuters to have a parking space near the
Ilijan Multi-Purpose Sports Complex.
1-2
THE CLIENT
Rosa Vilma Santos-Recto is a Filipino actress, singer and politician. She is known as
the "Star for All Seasons” for her various roles in different genres of her films and holds
the titles of Grand Slam Queen, Queen of Queens, and the Longest Reigning Box
Office Queen of Philippine Cinema. She was hailed as the Enduring Grand Dame of the
Philippine Film Industry by a foreign critic at the 2013 Toronto International Film
Festival, the first Filipina actress to be bestowed such a title. Santos is also a prominent
politician, and had served as governor of Batangas for three consecutive terms and as
mayor of Lipa for also three consecutive terms. She was elected as the Representative
for the Lone District of Lipa, Batangas in 2016
1-3
LOCATION MAP
The project is located near the sea for pure beauty of the beach and the view of
the city.
Figure 1. 3 shows the project location map from google maps with the orange
Project Name:
Location: Batangas, Tabangao, Lobo Rd, Batangas
1-4
ELEVATION MAP
Figure 1. 4 shows the elevation map of the project location from google maps’ terrain options.
1-5
PROJECT SCOPE AND LIMITATIONS
The design project will primarily focus on the Structural Analysis and Design
computation of the Parking Building. The design will consider the most economical and
appropriate material based on the constraints considered. The structural element of the
buildings such as beams, column, and slabs will only be considered in the design and
were computed and analyzed with the help of software application such as AutoCAD,
Sketch Up, STAAD, and MS Excel.
The project is only limited for:
Architectural Design; Perspective, Floor Plans and Elevation.
Structural Design; Foundation Plan and Framing Plan.
Design of Reinforced Concrete, Structural Steel, and Foundation is included.
Other Civil Engineering Context: Septic Tank, Cistern Tank, Water Supply
System, Ramp, and Shear Wall.
Construction Management
Life Cycle Assessment
The following are not covered in the design project:
1-6
CHAPTER 2:
DESIGN INPUTS
ARCHITECTURAL PLANS
Figure 2. 1 Perspective
2-1
Figure 2. 2 Vicinity Map
2-2
Fig. 2-3 Site Development Plan
2-3
Figure 2. 4 Ground Floor Plan
2-4
Figure 2. 5 Second to Third Floor Plan
2-5
Figure 2. 6 Fourth Floor Plan
2-6
Figure 2. 7 Roof Deck
2-7
Figure 2. 8 Front Elevation
2-8
Figure 2. 9 Left Elevation
2-9
Figure 2. 10 Right Elevation
2-10
Figure 2. 11 Rear Elevation
2-11
Figure 2. 12 Cross Sectional Area
2-12
Figure 2. 13 Longitudinal Area
2-13
STRUCTURAL PLANS
2-14
Figure 2. 15Column Location Plan
2-15
Figure 2. 16 Foundation Plan
2-16
Table of Initial Members (Beam, Column, Footing, etc.) Designation
2-17
Table 2. 2 Typical Beams Initial Members Grid 1-7 (USD)
2-18
Table 2. 3 Typical Beams Initial Members Grid A-K (WSD)
2-19
INITIAL SIZES OF TYPICAL BEAMS (WSD)
GRID MARK USE
1 RB-9 0.75m X 0.4m
1 B-11 0.75m X 0.4m
1 B-12 0.75m X 0.4m
1 B-13 0.75m X 0.4m
1 B-51 0.75m X 0.4m
2-20
INITIAL SIZES OF COLUMN FOR
ALL
FLOORS
GRID MARK USE
7 C1 0.5m x 0.5m
7 C2 0.5m x 0.5m
6 C3 0.6m x 0.6m
6 C4 0.5m x 0.5m
6 C5 0.5m x 0.5m
6 C6 0.5m x 0.5m
3 C7 0.6m x 0.6m
3 C8 0.5m x 0.5m
3 C9 0.5m x 0.5m
3 C10 0.5m x 0.5m
3 C11 0.5m x 0.5m
A C12 0.6m x 0.6m
B C13 0.5m x 0.5m
C C14 0.5m x 0.5m
D C15 0.5m x 0.5m
4 C16 0.5m x 0.5m
1 C17 0.6m x 0.6m
1 C18 0.5m x 0.5m
1 C19 0.5m x 0.5m
1 C20 0.5m x 0.5m
1 C21 0.5m x 0.5m
F C22 0.5m x 0.5m
3 C23 0.5m x 0.5m
2 C24 0.5m x 0.5m
F C25 0.5m x 0.5m
F C26 0.5m x 0.5m
F C27 0.5m x 0.5m
2-21
INITIAL FOOTING SIZES
MAR TYPE USE(mm x mm x
K mm)
C1 ISOLATED 2600x2600x600
C2 ISOLATED 3200x3200x800
C3 ISOLATED 3000x3000x700
C4 ISOLATED 2600x2600x600
C5 ISOLATED 3300x3300x800
C6 ISOLATED 3300x3300x800
C7 ISOLATED 3100x3100x800
C8 ISOLATED 3500x3500x800
C9 ISOLATED 3300x3300x800
C10 ISOLATED 3100x3100x800
C11 ISOLATED 3600x3600x900
C12 ISOLATED 3200x3200x800
C13 ISOLATED 3400x3400x800
C14 ISOLATED 3600x3600x900
C15 ISOLATED 3500x3500x800
C16 ISOLATED 3100x3100x800
C17 ISOLATED 3000x3000x700
C18 ISOLATED 3000x3000x700
C19 ISOLATED 2600x2600x600
C20 ISOLATED 2600x2600x600
C21 ISOLATED 2600x2600x600
C22 ISOLATED 3500x3500x800
C23 ISOLATED 3600x3600x900
C24 ISOLATED 3500x3500x800
C25 ISOLATED 3200x3200x800
C26 ISOLATED 2600x2600x600
C27 ISOLATED 3200x3200x800
2-22
SECOND FLOOR THIRD FLOOR
2-23
2B45 W18X86 3B45 W18X86
2B46 W18X86 3B46 W18X86
2-24
4B31 W18X97 RDB31 W18X97
4B32 W18X97 RDB32 W18X97
2-25
GROUND FLOOR SECOND FLOOR
COLUMN LENGTH STEEL SECTION COLUMN LENGTH STEEL SECTION
GFC1 3.2 W14X61 2C1 3 W14X61
GFC2 3.2 W14X61 2C2 3 W14X61
GFC3 3.2 W14X61 2C3 3 W14X61
GFC4 3.2 W14X61 2C4 3 W14X61
GFC5 3.2 W14X61 2C5 3 W14X61
GFC6 3.2 W14X61 2C6 3 W14X61
GFC7 3.2 W14X61 2C7 3 W14X61
GFC8 3.2 W14X61 2C8 3 W14X61
GFC9 3.2 W14X61 2C9 3 W14X61
GFC10 3.2 W14X61 2C10 3 W14X61
GFC11 3.2 W14X61 2C11 3 W14X61
GFC12 3.2 W14X61 2C12 3 W14X61
GFC13 3.2 W14X61 2C13 3 W14X61
GFC14 3.2 W14X61 2C14 3 W14X61
GFC15 3.2 W14X61 2C15 3 W14X61
GFC16 3.2 W14X61 2C16 3 W14X61
GFC17 3.2 W14X61 2C17 3 W14X61
GFC18 3.2 W14X61 2C18 3 W14X61
GFC19 3.2 W14X61 2C19 3 W14X61
GFC20 3.2 W14X61 2C20 3 W14X61
GFC21 3.2 W14X61 2C21 3 W14X61
GFC22 3.2 W14X61 2C22 3 W14X61
GFC23 3.2 W14X61 2C23 3 W14X61
GFC24 3.2 W14X61 2C24 3 W14X61
GFC25 3.2 W14X61 2C25 3 W14X61
GFC26 3.2 W14X61 2C26 3 W14X61
GFC27 3.2 W14X61 2C27 3 W14X61
2-26
THIRD FLOOR FOURTH FLOOR
COLUMN LENGTH STEEL SECTION COLUMN LENGTH STEEL SECTION
3C1 3 W14X38 4C1 3 W14X26
3C2 3 W14X38 4C2 3 W14X26
3C3 3 W14X38 4C3 3 W14X26
3C4 3 W14X38 4C4 3 W14X26
3C5 3 W14X38 4C5 3 W14X26
3C6 3 W14X38 4C6 3 W14X26
3C7 3 W14X38 4C7 3 W14X26
3C8 3 W14X38 4C8 3 W14X26
3C9 3 W14X38 4C9 3 W14X26
3C10 3 W14X38 4C10 3 W14X26
3C11 3 W14X38 4C11 3 W14X26
3C12 3 W14X38 4C12 3 W14X26
3C13 3 W14X38 4C13 3 W14X26
3C14 3 W14X38 4C14 3 W14X26
3C15 3 W14X38 4C15 3 W14X26
3C16 3 W14X38 4C16 3 W14X26
3C17 3 W14X38 4C17 3 W14X26
3C18 3 W14X38 4C18 3 W14X26
3C19 3 W14X38 4C19 3 W14X26
3C20 3 W14X38 4C20 3 W14X26
3C21 3 W14X38 4C21 3 W14X26
3C22 3 W14X38 4C22 3 W14X26
3C23 3 W14X38 4C23 3 W14X26
3C24 3 W14X38 4C24 3 W14X26
3C25 3 W14X38 4C25 3 W14X26
3C26 3 W14X38 4C26 3 W14X26
3C27 3 W14X38 4C27 3 W14X26
2-27
SECOND FLOOR THIRD FLOOR
2-28
2B46 W14X109 3B46 W14X109
2B47 W14X109 3B47 W14X109
2B48 W14X109 3B48 W14X109
2-29
4B30 W14X120 RDB30 W14X120
4B31 W14X120 RDB31 W14X120
2-30
GROUND FLOOR SECOND FLOOR
COLUMN LENGTH STEEL SECTION COLUMN LENGTH STEEL SECTION
GFC1 3.2 W14X109 2C1 3 W14X82
GFC2 3.2 W14X109 2C2 3 W14X82
GFC3 3.2 W14X109 2C3 3 W14X82
GFC4 3.2 W14X109 2C4 3 W14X82
GFC5 3.2 W14X109 2C5 3 W14X82
GFC6 3.2 W14X109 2C6 3 W14X82
GFC7 3.2 W14X109 2C7 3 W14X82
GFC8 3.2 W14X109 2C8 3 W14X82
GFC9 3.2 W14X109 2C9 3 W14X82
GFC10 3.2 W14X109 2C10 3 W14X82
GFC11 3.2 W14X109 2C11 3 W14X82
GFC12 3.2 W14X109 2C12 3 W14X82
GFC13 3.2 W14X109 2C13 3 W14X82
GFC14 3.2 W14X109 2C14 3 W14X82
GFC15 3.2 W14X109 2C15 3 W14X82
GFC16 3.2 W14X109 2C16 3 W14X82
GFC17 3.2 W14X109 2C17 3 W14X82
GFC18 3.2 W14X109 2C18 3 W14X82
GFC19 3.2 W14X109 2C19 3 W14X82
GFC20 3.2 W14X109 2C20 3 W14X82
GFC21 3.2 W14X109 2C21 3 W14X82
GFC22 3.2 W14X109 2C22 3 W14X82
GFC23 3.2 W14X109 2C23 3 W14X82
GFC24 3.2 W14X109 2C24 3 W14X82
GFC25 3.2 W14X109 2C25 3 W14X82
GFC26 3.2 W14X109 2C26 3 W14X82
GFC27 3.2 W14X109 2C27 3 W14X82
2-31
THIRD FLOOR FOURTH FLOOR
COLUMN LENGTH STEEL SECTION COLUMN LENGTH STEEL SECTION
3C1 3 W14X61 4C1 3 W14X30
3C2 3 W14X61 4C2 3 W14X30
3C3 3 W14X61 4C3 3 W14X30
3C4 3 W14X61 4C4 3 W14X30
3C5 3 W14X61 4C5 3 W14X30
3C6 3 W14X61 4C6 3 W14X30
3C7 3 W14X61 4C7 3 W14X30
3C8 3 W14X61 4C8 3 W14X30
3C9 3 W14X61 4C9 3 W14X30
3C10 3 W14X61 4C10 3 W14X30
3C11 3 W14X61 4C11 3 W14X30
3C12 3 W14X61 4C12 3 W14X30
3C13 3 W14X61 4C13 3 W14X30
3C14 3 W14X61 4C14 3 W14X30
3C15 3 W14X61 4C15 3 W14X30
3C16 3 W14X61 4C16 3 W14X30
3C17 3 W14X61 4C17 3 W14X30
3C18 3 W14X61 4C18 3 W14X30
3C19 3 W14X61 4C19 3 W14X30
3C20 3 W14X61 4C20 3 W14X30
3C21 3 W14X61 4C21 3 W14X30
3C22 3 W14X61 4C22 3 W14X30
3C23 3 W14X61 4C23 3 W14X30
3C24 3 W14X61 4C24 3 W14X30
3C25 3 W14X61 4C25 3 W14X30
3C26 3 W14X61 4C26 3 W14X30
3C27 3 W14X61 4C27 3 W14X30
2-32