Download as pdf or txt
Download as pdf or txt
You are on page 1of 45

TECHNOLOGICAL INSTITUTE OF THE PHILIPPINES

1338 Arlegui St., Quiapo, Manila

College of Engineering
Department of Civil Engineering

A Capstone Design (CE 509 CE Projects 2)


Presented to the faculty of Civil Engineering

In Partial Fulfilment of Requirements for the Degree of


Bachelor of Science in Civil Engineering

A Multi-Storey Parking Building with Food Park and Energy Panel with General
Provisions of Geotechnical Engineering

Capili, Michael Joshua


Casanguan, Krishna Yshrael
Manahan, Alexson
Manese, Christopher
Table of Contents

Title Page....................................................................................................................................i
Table of Contents………………………………………………………………………….. ………....ii
List of Abbreviations………………………………….………………………………….…………...iii
List of Tables…………………………………………………………………………………………...iv
List of Figures……………………………………………………………………………..... ………...v

CHAPTER 1: PROJECT BACKGROUND


CHAPTER I: PROJECT BACKGROUND ........................................................................ 1-1
THE PROJECT ....................................................................................................................... 1-1
PROJECT OBJECTIVES ........................................................................................................ 1-2
THE CLIENT ........................................................................................................................... 1-3
LOCATION MAP ..................................................................................................................... 1-4
ELEVATION MAP ................................................................................................................... 1-5
PROJECT SCOPE AND LIMITATIONS .................................................................................. 1-6
Chapter 2: ....................................................................................................................... 2-1
Design Inputs ................................................................................................................. 2-1
Architectural Plans .................................................................................................................. 2-1
Structural Plans..................................................................................................................... 2-14
Table of Initial Members (Beam, Column, Footing, etc.) Designation .................................... 2-17

ii
LIST OF ABBREVIATIONS

a - Depth of equivalent rectangular stress block

A - Column cross-sectional area, m2

As - Loaded area of the concrete, mm2

Ac - Area of Concrete, mm2

Ma - Maximum moment

Mc - Factored Moment

Md - Moment due to dead load

Mn - Nominal Moment in strength

Mu - Factored moment at section

Pb - Nominal axial load strength at balanced strain condition

Pn - Nominal axial load strength at given eccentricity

t - thickness

Vu - factored shear at section

ACI - American Concrete Institute

ASD - Allowable Strength Design

ASEP - Association of Structural Engineers of the Philippines

LRFD - Load Factor and Resistance Design

NSCP - National Structural Code of the Philippines

RCD - Reinforced Concrete Design

USD - Ultimate Strength Design

SSD - Structural Steel Design

WSD - Work Stress Design

iii
LIST OF TABLES
Table 2. 1 Typical Beams Initial Members Grid A-K (USD) ....................................................................... 17
Table 2. 2 Typical Beams Initial Members Grid 1-7 (USD) ....................................................................... 18
Table 2. 3 Typical Beams Initial Members Grid A-K (WSD) ...................................................................... 19
Table 2. 4 Typical Beams Initial Members Grid 1-7 (WSD) ...................................................................... 20
Table 2. 5 Typical Column Initial Members............................................................................................. 21
Table 2. 6 Typical Foundation Initial Members ....................................................................................... 22
Table 2. 7 Initial Beam Sizes (LRFD) ........................................................................................................ 24
Table 2. 8 Initial Beam Sizes (LRFD) ....................................................................................................... 25
Table 2. 9 Initial Column Sizes (LRFD) ..................................................................................................... 26
Table 2. 10 Initial Column Sizes (LRFD) ................................................................................................... 27
Table 2. 11 Initial Beam Sizes (ASD) ....................................................................................................... 29
Table 2. 12 Initial Beam Sizes (ASD) ....................................................................................................... 30
Table 2. 13 Initial Column Sizes (ASD) .................................................................................................... 31
Table 2. 14 Initial Column Sizes (ASD) .................................................................................................... 32
LIST OF FIGURES

Figure 1. 1 Official Seal of the Province of Batangas............................................................... 1-3


Figure 1. 2 Hon. Rosa Vilma Santos - Recto ........................................................................... 1-3
Figure 1. 3 shows the project location map from google maps with the orange ....................... 1-4
Figure 1. 4 shows the elevation map of the project location from google maps’ terrain options1-5

Figure 2. 1 Perspective ........................................................................................................... 2-1


Figure 2. 2 Vicinity Map........................................................................................................... 2-2
Figure 2. 3Site Development Plan ........................................................................................... 2-3
Figure 2. 4 Ground Floor Plan ................................................................................................. 2-4
Figure 2. 5 Second to Third Floor Plan .................................................................................... 2-5
Figure 2. 6 Fourth Floor Plan .................................................................................................. 2-6
Figure 2. 7 Roof Deck ............................................................................................................. 2-7
Figure 2. 8 Front Elevation ...................................................................................................... 2-8
Figure 2. 9 Left Elevation ........................................................................................................ 2-9
Figure 2. 10 Right Elevation .................................................................................................. 2-10
Figure 2. 11 Rear Elevation................................................................................................... 2-11
Figure 2. 12 Cross Sectional Area......................................................................................... 2-12
Figure 2. 13 Longitudinal Area .............................................................................................. 2-13
Figure 2. 14 Typical 2nd to Roof Deck Framing Plan ............................................................ 2-14
Figure 2. 15Column Location Plan ........................................................................................ 2-15
Figure 2. 16 Foundation Plan ................................................................................................ 2-16

v
CHAPTER 1: PROJECT
BACKGROUND
THE PROJECT
The multi-story parking building with a food park shall be constructed along with
Batangas, Tabangao, Lobo Rd, Batangas, it will have a lot area of approximately 2900
square meters. The parking building will be designed to provide parking for the sports
complex near the location.
The project will serve its purpose as a parking space for tourists aiming to enjoy
the beach and also to serve food and refreshments to locals and visitors alike. It can
also be parking for other vehicles that have no parking near their houses and for the
customers of the food park located on the roof deck of the parking building. The parking
building also has a food park that will be open to the public.
As an effort to reduce the total energy cost of the structure, a solar panel system
is to be placed on the building's roof deck to harvest solar energy during the day. In
addition to saving energy costs, solar power is pollution-free and causes no greenhouse
gases to be emitted after installation. It will also reduce the need for fossil fuels. The
system also harvests energy during overcast conditions. Initial installation costs would
seem high, but the return in savings, in the long run, would be greater than using
conventional power lines.

1-1
PROJECT OBJECTIVES
This project aims to design the parking building with food park that will provide a
parking space for the community of Ilijan.
Specifically, this project aims to:
• To apply modern tools such as Sketch Up, AutoCAD, Microsoft Word, Microsoft
Excel, and STAAD in structural design to provide necessary architectural and structural
plans

• To design the parking building which will comply to the requirements of the
National Structural Code of the Philippines (NSCP) 2015

• To create a structure that will help commuters to have a parking space near the
Ilijan Multi-Purpose Sports Complex.

1-2
THE CLIENT

Figure 1. 1 Official Seal of the Province


Figure 1. 2 Hon. Rosa Vilma Santos - Recto
of Batangas

Rosa Vilma Santos-Recto is a Filipino actress, singer and politician. She is known as
the "Star for All Seasons” for her various roles in different genres of her films and holds
the titles of Grand Slam Queen, Queen of Queens, and the Longest Reigning Box
Office Queen of Philippine Cinema. She was hailed as the Enduring Grand Dame of the
Philippine Film Industry by a foreign critic at the 2013 Toronto International Film
Festival, the first Filipina actress to be bestowed such a title. Santos is also a prominent
politician, and had served as governor of Batangas for three consecutive terms and as
mayor of Lipa for also three consecutive terms. She was elected as the Representative
for the Lone District of Lipa, Batangas in 2016

1-3
LOCATION MAP
The project is located near the sea for pure beauty of the beach and the view of
the city.

Figure 1. 3 shows the project location map from google maps with the orange

rectangular portion as the lot area for the proposed project.

Project Name:
Location: Batangas, Tabangao, Lobo Rd, Batangas

1-4
ELEVATION MAP

Figure 1. 4 shows the elevation map of the project location from google maps’ terrain options.

Location: Philippines > Calabarzon > Batangas > Ilijan


Longitude: 121.07099
Latitute: 13.63184
Elevation: 8m / 26feet
Barometer Pressure: 101KPa

1-5
PROJECT SCOPE AND LIMITATIONS
The design project will primarily focus on the Structural Analysis and Design
computation of the Parking Building. The design will consider the most economical and
appropriate material based on the constraints considered. The structural element of the
buildings such as beams, column, and slabs will only be considered in the design and
were computed and analyzed with the help of software application such as AutoCAD,
Sketch Up, STAAD, and MS Excel.
The project is only limited for:
 Architectural Design; Perspective, Floor Plans and Elevation.
 Structural Design; Foundation Plan and Framing Plan.
 Design of Reinforced Concrete, Structural Steel, and Foundation is included.
 Other Civil Engineering Context: Septic Tank, Cistern Tank, Water Supply
System, Ramp, and Shear Wall.
 Construction Management
 Life Cycle Assessment
The following are not covered in the design project:

 Cost Estimates for Plumbing, Electrical and Mechanical

1-6
CHAPTER 2:
DESIGN INPUTS
ARCHITECTURAL PLANS

Figure 2. 1 Perspective

2-1
Figure 2. 2 Vicinity Map

2-2
Fig. 2-3 Site Development Plan

Figure 2. 3Site Development Plan

2-3
Figure 2. 4 Ground Floor Plan

2-4
Figure 2. 5 Second to Third Floor Plan

2-5
Figure 2. 6 Fourth Floor Plan

2-6
Figure 2. 7 Roof Deck

2-7
Figure 2. 8 Front Elevation

2-8
Figure 2. 9 Left Elevation

2-9
Figure 2. 10 Right Elevation

2-10
Figure 2. 11 Rear Elevation

2-11
Figure 2. 12 Cross Sectional Area

2-12
Figure 2. 13 Longitudinal Area

2-13
STRUCTURAL PLANS

Figure 2. 14 Typical 2nd to Roof Deck Framing Plan

2-14
Figure 2. 15Column Location Plan

2-15
Figure 2. 16 Foundation Plan

2-16
Table of Initial Members (Beam, Column, Footing, etc.) Designation

Table 2. 1 Typical Beams Initial Members Grid A-K (USD)

2-17
Table 2. 2 Typical Beams Initial Members Grid 1-7 (USD)

2-18
Table 2. 3 Typical Beams Initial Members Grid A-K (WSD)

2-19
INITIAL SIZES OF TYPICAL BEAMS (WSD)
GRID MARK USE
1 RB-9 0.75m X 0.4m
1 B-11 0.75m X 0.4m
1 B-12 0.75m X 0.4m
1 B-13 0.75m X 0.4m
1 B-51 0.75m X 0.4m

GRID MARK USE


2_5 RB-5 0.75m X 0.4m
2_5 B-10 0.75m X 0.4m
2_5 B-14 0.75m X 0.4m
2_5 B-15 750X400
2_5 B-52 750X400

GRID MARK USE


3_4 B-16 0.75m X 0.4m
3_4 B-17 0.75m X 0.4m
3_4 B-18 0.75m X 0.4m
3_4 RB-19 0.75m X 0.4m
3_4 B-53 0.75m X 0.4m

GRID MARK USE


6 B-6 0.75m X 0.4m
6 B-7 0.75m X 0.4m
6 B-8 0.75m X 0.4m
6 RB-9 0.75m X 0.4m

GRID MARK USE


7 B-1 0.75m X 0.4m
7 B-2 0.75m X 0.4m
7 B-3 0.75m X 0.4m
7 B-4 0.75m X 0.4m
7 B-54 0.75m X 0.4m
7 B-55 0.75m X 0.4m

Table 2. 4 Typical Beams Initial Members Grid 1-7 (WSD)

2-20
INITIAL SIZES OF COLUMN FOR
ALL
FLOORS
GRID MARK USE
7 C1 0.5m x 0.5m
7 C2 0.5m x 0.5m
6 C3 0.6m x 0.6m
6 C4 0.5m x 0.5m
6 C5 0.5m x 0.5m
6 C6 0.5m x 0.5m
3 C7 0.6m x 0.6m
3 C8 0.5m x 0.5m
3 C9 0.5m x 0.5m
3 C10 0.5m x 0.5m
3 C11 0.5m x 0.5m
A C12 0.6m x 0.6m
B C13 0.5m x 0.5m
C C14 0.5m x 0.5m
D C15 0.5m x 0.5m
4 C16 0.5m x 0.5m
1 C17 0.6m x 0.6m
1 C18 0.5m x 0.5m
1 C19 0.5m x 0.5m
1 C20 0.5m x 0.5m
1 C21 0.5m x 0.5m
F C22 0.5m x 0.5m
3 C23 0.5m x 0.5m
2 C24 0.5m x 0.5m
F C25 0.5m x 0.5m
F C26 0.5m x 0.5m
F C27 0.5m x 0.5m

Table 2. 5 Typical Column Initial Members

2-21
INITIAL FOOTING SIZES
MAR TYPE USE(mm x mm x
K mm)
C1 ISOLATED 2600x2600x600
C2 ISOLATED 3200x3200x800
C3 ISOLATED 3000x3000x700
C4 ISOLATED 2600x2600x600
C5 ISOLATED 3300x3300x800
C6 ISOLATED 3300x3300x800
C7 ISOLATED 3100x3100x800
C8 ISOLATED 3500x3500x800
C9 ISOLATED 3300x3300x800
C10 ISOLATED 3100x3100x800
C11 ISOLATED 3600x3600x900
C12 ISOLATED 3200x3200x800
C13 ISOLATED 3400x3400x800
C14 ISOLATED 3600x3600x900
C15 ISOLATED 3500x3500x800
C16 ISOLATED 3100x3100x800
C17 ISOLATED 3000x3000x700
C18 ISOLATED 3000x3000x700
C19 ISOLATED 2600x2600x600
C20 ISOLATED 2600x2600x600
C21 ISOLATED 2600x2600x600
C22 ISOLATED 3500x3500x800
C23 ISOLATED 3600x3600x900
C24 ISOLATED 3500x3500x800
C25 ISOLATED 3200x3200x800
C26 ISOLATED 2600x2600x600
C27 ISOLATED 3200x3200x800

Table 2. 6 Typical Foundation Initial Members

2-22
SECOND FLOOR THIRD FLOOR

BEAM STEEL BEAM STEEL


SECTION SECTION
2B1 W18X86 3B1 W18X86
2B2 W18X86 3B2 W18X86
2B3 W18X86 3B3 W18X86
2B4 W18X86 3B4 W18X86
2B5 W18X86 3B5 W18X86

2B6 W18X86 3B6 W18X86


2B7 W18X86 3B7 W18X86
2B8 W18X86 3B8 W18X86
2B9 W18X86 3B9 W18X86
2B10 W18X86 3B10 W18X86
2B11 W18X86 3B11 W18X86
2B12 W18X86 3B12 W18X86
2B13 W18X86 3B13 W18X86
2B14 W18X86 3B14 W18X86
2B15 W18X86 3B15 W18X86
2B16 W18X86 3B16 W18X86
2B17 W18X86 3B17 W18X86
2B18 W18X86 3B18 W18X86
2B19 W18X86 3B19 W18X86

2B20 W18X86 3B20 W18X86


2B21 W18X86 3B21 W18X86
2B22 W18X86 3B22 W18X86

2B23 W18X86 3B23 W18X86


2B24 W18X86 3B24 W18X86
2B25 W18X86 3B25 W18X86
2B26 W18X86 3B26 W18X86

2B27 W18X86 3B27 W18X86


2B28 W18X86 3B28 W18X86
2B29 W18X86 3B29 W18X86
2B30 W18X86 3B30 W18X86
2B31 W18X86 3B31 W18X86
2B32 W18X86 3B32 W18X86
2B33 W18X86 3B33 W18X86

2B34 W18X86 3B34 W18X86


2B35 W18X86 3B35 W18X86
2B36 W18X86 3B36 W18X86

2B37 W18X86 3B37 W18X86


2B38 W18X86 3B38 W18X86
2B39 W18X86 3B39 W18X86
2B40 W18X86 3B40 W18X86

2B41 W18X86 3B41 W18X86


2B42 W18X86 3B42 W18X86
2B43 W18X86 3B43 W18X86
2B44 W18X86 3B44 W18X86

2-23
2B45 W18X86 3B45 W18X86
2B46 W18X86 3B46 W18X86

2B47 W18X86 3B47 W18X86


2B48 W18X86 3B48 W18X86
2B49 W18X86 3B49 W18X86

2B50 W18X86 3B50 W18X86


2B51 W18X86 3B51 W18X86
2B52 W18X86 3B52 W18X86
2B53 W18X86 3B53 W18X86

2B54 W18X86 3B54 W18X86


2B55 W18X86 3B55 W18X86

Table 2. 7 Initial Beam Sizes (LRFD)


FOURTH FLOOR ROOFDECK

BEAM STEEL BEAM STEEL


SECTION SECTION
4B1 W18X97 RDB1 W18X97
4B2 W18X97 RDB2 W18X97
4B3 W18X97 RDB3 W18X97
4B4 W18X97 RDB4 W18X97
4B5 W18X97 RDB5 W18X97
4B6 W18X97 RDB6 W18X97
4B7 W18X97 RDB7 W18X97
4B8 W18X97 RDB8 W18X97
4B9 W18X97 RDB9 W18X97
4B10 W18X97 RDB10 W18X97

4B11 W18X97 RDB11 W18X97


4B12 W18X97 RDB12 W18X97
4B13 W18X97 RDB13 W18X97

4B14 W18X97 RDB14 W18X97


4B15 W18X97 RDB15 W18X97
4B16 W18X97 RDB16 W18X97

4B17 W18X97 RDB17 W18X97


4B18 W18X97 RDB18 W18X97
4B19 W18X97 RDB19 W18X97
4B20 W18X97 RDB20 W18X97

4B21 W18X97 RDB21 W18X97


4B22 W18X97 RDB22 W18X97
4B23 W18X97 RDB23 W18X97
4B24 W18X97 RDB24 W18X97
4B25 W18X97 RDB25 W18X97
4B26 W18X97 RDB26 W18X97
4B27 W18X97 RDB27 W18X97
4B28 W18X97 RDB28 W18X97
4B29 W18X97 RDB29 W18X97
4B30 W18X97 RDB30 W18X97

2-24
4B31 W18X97 RDB31 W18X97
4B32 W18X97 RDB32 W18X97

4B33 W18X97 RDB33 W18X97


4B34 W18X97 RDB34 W18X97
4B35 W18X97 RDB35 W18X97

4B36 W18X97 RDB36 W18X97


4B37 W18X97 RDB37 W18X97
4B38 W18X97 RDB38 W18X97
4B39 W18X97 RDB39 W18X97

4B40 W18X97 RDB40 W18X97


4B41 W18X97 RDB41 W18X97
4B42 W18X97 RDB42 W18X97
4B43 W18X97 RDB43 W18X97
4B44 W18X97 RDB44 W18X97
4B45 W18X97 RDB45 W18X97

4B46 W18X97 RDB46 W18X97


4B47 W18X97 RDB47 W18X97
4B48 W18X97 RDB48 W18X97
4B49 W18X97 RDB49 W18X97

4B50 W18X97 RDB50 W18X97


4B51 W18X97 RDB51 W18X97
4B52 W18X97 RDB52 W18X97

4B53 W18X97 RDB53 W18X97


4B54 W18X97 RDB54 W18X97
4B55 W18X97 RDB55 W18X97

Table 2. 8 Initial Beam Sizes (LRFD)

2-25
GROUND FLOOR SECOND FLOOR
COLUMN LENGTH STEEL SECTION COLUMN LENGTH STEEL SECTION
GFC1 3.2 W14X61 2C1 3 W14X61
GFC2 3.2 W14X61 2C2 3 W14X61
GFC3 3.2 W14X61 2C3 3 W14X61
GFC4 3.2 W14X61 2C4 3 W14X61
GFC5 3.2 W14X61 2C5 3 W14X61
GFC6 3.2 W14X61 2C6 3 W14X61
GFC7 3.2 W14X61 2C7 3 W14X61
GFC8 3.2 W14X61 2C8 3 W14X61
GFC9 3.2 W14X61 2C9 3 W14X61
GFC10 3.2 W14X61 2C10 3 W14X61
GFC11 3.2 W14X61 2C11 3 W14X61
GFC12 3.2 W14X61 2C12 3 W14X61
GFC13 3.2 W14X61 2C13 3 W14X61
GFC14 3.2 W14X61 2C14 3 W14X61
GFC15 3.2 W14X61 2C15 3 W14X61
GFC16 3.2 W14X61 2C16 3 W14X61
GFC17 3.2 W14X61 2C17 3 W14X61
GFC18 3.2 W14X61 2C18 3 W14X61
GFC19 3.2 W14X61 2C19 3 W14X61
GFC20 3.2 W14X61 2C20 3 W14X61
GFC21 3.2 W14X61 2C21 3 W14X61
GFC22 3.2 W14X61 2C22 3 W14X61
GFC23 3.2 W14X61 2C23 3 W14X61
GFC24 3.2 W14X61 2C24 3 W14X61
GFC25 3.2 W14X61 2C25 3 W14X61
GFC26 3.2 W14X61 2C26 3 W14X61
GFC27 3.2 W14X61 2C27 3 W14X61

Table 2. 9 Initial Column Sizes (LRFD)

2-26
THIRD FLOOR FOURTH FLOOR
COLUMN LENGTH STEEL SECTION COLUMN LENGTH STEEL SECTION
3C1 3 W14X38 4C1 3 W14X26
3C2 3 W14X38 4C2 3 W14X26
3C3 3 W14X38 4C3 3 W14X26
3C4 3 W14X38 4C4 3 W14X26
3C5 3 W14X38 4C5 3 W14X26
3C6 3 W14X38 4C6 3 W14X26
3C7 3 W14X38 4C7 3 W14X26
3C8 3 W14X38 4C8 3 W14X26
3C9 3 W14X38 4C9 3 W14X26
3C10 3 W14X38 4C10 3 W14X26
3C11 3 W14X38 4C11 3 W14X26
3C12 3 W14X38 4C12 3 W14X26
3C13 3 W14X38 4C13 3 W14X26
3C14 3 W14X38 4C14 3 W14X26
3C15 3 W14X38 4C15 3 W14X26
3C16 3 W14X38 4C16 3 W14X26
3C17 3 W14X38 4C17 3 W14X26
3C18 3 W14X38 4C18 3 W14X26
3C19 3 W14X38 4C19 3 W14X26
3C20 3 W14X38 4C20 3 W14X26
3C21 3 W14X38 4C21 3 W14X26
3C22 3 W14X38 4C22 3 W14X26
3C23 3 W14X38 4C23 3 W14X26
3C24 3 W14X38 4C24 3 W14X26
3C25 3 W14X38 4C25 3 W14X26
3C26 3 W14X38 4C26 3 W14X26
3C27 3 W14X38 4C27 3 W14X26

Table 2. 10 Initial Column Sizes (LRFD)

2-27
SECOND FLOOR THIRD FLOOR

BEAM STEEL BEAM STEEL


SECTION SECTION
2B1 W14X109 3B1 W14X109

2B2 W14X109 3B2 W14X109


2B3 W14X109 3B3 W14X109
2B4 W14X109 3B4 W14X109
2B5 W14X109 3B5 W14X109
2B6 W14X109 3B6 W14X109
2B7 W14X109 3B7 W14X109

2B8 W14X109 3B8 W14X109


2B9 W14X109 3B9 W14X109
2B10 W14X109 3B10 W14X109

2B11 W14X109 3B11 W14X109


2B12 W14X109 3B12 W14X109
2B13 W14X109 3B13 W14X109

2B14 W14X109 3B14 W14X109


2B15 W14X109 3B15 W14X109
2B16 W14X109 3B16 W14X109
2B17 W14X109 3B17 W14X109
2B18 W14X109 3B18 W14X109
2B19 W14X109 3B19 W14X109
2B20 W14X109 3B20 W14X109
2B21 W14X109 3B21 W14X109
2B22 W14X109 3B22 W14X109
2B23 W14X109 3B23 W14X109

2B24 W14X109 3B24 W14X109


2B25 W14X109 3B25 W14X109
2B26 W14X109 3B26 W14X109
2B27 W14X109 3B27 W14X109
2B28 W14X109 3B28 W14X109
2B29 W14X109 3B29 W14X109
2B30 W14X109 3B30 W14X109
2B31 W14X109 3B31 W14X109

2B32 W14X109 3B32 W14X109


2B33 W14X109 3B33 W14X109
2B34 W14X109 3B34 W14X109
2B35 W14X109 3B35 W14X109
2B36 W14X109 3B36 W14X109
2B37 W14X109 3B37 W14X109
2B38 W14X109 3B38 W14X109
2B39 W14X109 3B39 W14X109
2B40 W14X109 3B40 W14X109
2B41 W14X109 3B41 W14X109
2B42 W14X109 3B42 W14X109

2B43 W14X109 3B43 W14X109


2B44 W14X109 3B44 W14X109
2B45 W14X109 3B45 W14X109

2-28
2B46 W14X109 3B46 W14X109
2B47 W14X109 3B47 W14X109
2B48 W14X109 3B48 W14X109

2B49 W14X109 3B49 W14X109


2B50 W14X109 3B50 W14X109
2B51 W14X109 3B51 W14X109
2B52 W14X109 3B52 W14X109
2B53 W14X109 3B53 W14X109
2B54 W14X109 3B54 W14X109
2B55 W14X109 3B55 W14X109

Table 2. 11 Initial Beam Sizes (ASD)

FOURTH FLOOR ROOFDECK

BEAM STEEL BEAM STEEL


SECTION SECTION
4B1 W14X120 RDB1 W14X120
4B2 W14X120 RDB2 W14X120
4B3 W14X120 RDB3 W14X120

4B4 W14X120 RDB4 W14X120


4B5 W14X120 RDB5 W14X120
4B6 W14X120 RDB6 W14X120
4B7 W14X120 RDB7 W14X120

4B8 W14X120 RDB8 W14X120


4B9 W14X120 RDB9 W14X120
4B10 W14X120 RDB10 W14X120
4B11 W14X120 RDB11 W14X120
4B12 W14X120 RDB12 W14X120
4B13 W14X120 RDB13 W14X120
4B14 W14X120 RDB14 W14X120
4B15 W14X120 RDB15 W14X120
4B16 W14X120 RDB16 W14X120
4B17 W14X120 RDB17 W14X120
4B18 W14X120 RDB18 W14X120
4B19 W14X120 RDB19 W14X120
4B20 W14X120 RDB20 W14X120
4B21 W14X120 RDB21 W14X120
4B22 W14X120 RDB22 W14X120
4B23 W14X120 RDB23 W14X120

4B24 W14X120 RDB24 W14X120


4B25 W14X120 RDB25 W14X120
4B26 W14X120 RDB26 W14X120
4B27 W14X120 RDB27 W14X120

4B28 W14X120 RDB28 W14X120


4B29 W14X120 RDB29 W14X120

2-29
4B30 W14X120 RDB30 W14X120
4B31 W14X120 RDB31 W14X120

4B32 W14X120 RDB32 W14X120


4B33 W14X120 RDB33 W14X120
4B34 W14X120 RDB34 W14X120
4B35 W14X120 RDB35 W14X120
4B36 W14X120 RDB36 W14X120
4B37 W14X120 RDB37 W14X120
4B38 W14X120 RDB38 W14X120
4B39 W14X120 RDB39 W14X120

4B40 W14X120 RDB40 W14X120


4B41 W14X120 RDB41 W14X120
4B42 W14X120 RDB42 W14X120
4B43 W14X120 RDB43 W14X120

4B44 W14X120 RDB44 W14X120


4B45 W14X120 RDB45 W14X120
4B46 W14X120 RDB46 W14X120

4B47 W14X120 RDB47 W14X120


4B48 W14X120 RDB48 W14X120
4B49 W14X120 RDB49 W14X120

4B50 W14X120 RDB50 W14X120


4B51 W14X120 RDB51 W14X120
4B52 W14X120 RDB52 W14X120
4B53 W14X120 RDB53 W14X120

4B54 W14X120 RDB54 W14X120


4B55 W14X120 RDB55 W14X120

Table 2. 12 Initial Beam Sizes (ASD)

2-30
GROUND FLOOR SECOND FLOOR
COLUMN LENGTH STEEL SECTION COLUMN LENGTH STEEL SECTION
GFC1 3.2 W14X109 2C1 3 W14X82
GFC2 3.2 W14X109 2C2 3 W14X82
GFC3 3.2 W14X109 2C3 3 W14X82
GFC4 3.2 W14X109 2C4 3 W14X82
GFC5 3.2 W14X109 2C5 3 W14X82
GFC6 3.2 W14X109 2C6 3 W14X82
GFC7 3.2 W14X109 2C7 3 W14X82
GFC8 3.2 W14X109 2C8 3 W14X82
GFC9 3.2 W14X109 2C9 3 W14X82
GFC10 3.2 W14X109 2C10 3 W14X82
GFC11 3.2 W14X109 2C11 3 W14X82
GFC12 3.2 W14X109 2C12 3 W14X82
GFC13 3.2 W14X109 2C13 3 W14X82
GFC14 3.2 W14X109 2C14 3 W14X82
GFC15 3.2 W14X109 2C15 3 W14X82
GFC16 3.2 W14X109 2C16 3 W14X82
GFC17 3.2 W14X109 2C17 3 W14X82
GFC18 3.2 W14X109 2C18 3 W14X82
GFC19 3.2 W14X109 2C19 3 W14X82
GFC20 3.2 W14X109 2C20 3 W14X82
GFC21 3.2 W14X109 2C21 3 W14X82
GFC22 3.2 W14X109 2C22 3 W14X82
GFC23 3.2 W14X109 2C23 3 W14X82
GFC24 3.2 W14X109 2C24 3 W14X82
GFC25 3.2 W14X109 2C25 3 W14X82
GFC26 3.2 W14X109 2C26 3 W14X82
GFC27 3.2 W14X109 2C27 3 W14X82

Table 2. 13 Initial Column Sizes (ASD)

2-31
THIRD FLOOR FOURTH FLOOR
COLUMN LENGTH STEEL SECTION COLUMN LENGTH STEEL SECTION
3C1 3 W14X61 4C1 3 W14X30
3C2 3 W14X61 4C2 3 W14X30
3C3 3 W14X61 4C3 3 W14X30
3C4 3 W14X61 4C4 3 W14X30
3C5 3 W14X61 4C5 3 W14X30
3C6 3 W14X61 4C6 3 W14X30
3C7 3 W14X61 4C7 3 W14X30
3C8 3 W14X61 4C8 3 W14X30
3C9 3 W14X61 4C9 3 W14X30
3C10 3 W14X61 4C10 3 W14X30
3C11 3 W14X61 4C11 3 W14X30
3C12 3 W14X61 4C12 3 W14X30
3C13 3 W14X61 4C13 3 W14X30
3C14 3 W14X61 4C14 3 W14X30
3C15 3 W14X61 4C15 3 W14X30
3C16 3 W14X61 4C16 3 W14X30
3C17 3 W14X61 4C17 3 W14X30
3C18 3 W14X61 4C18 3 W14X30
3C19 3 W14X61 4C19 3 W14X30
3C20 3 W14X61 4C20 3 W14X30
3C21 3 W14X61 4C21 3 W14X30
3C22 3 W14X61 4C22 3 W14X30
3C23 3 W14X61 4C23 3 W14X30
3C24 3 W14X61 4C24 3 W14X30
3C25 3 W14X61 4C25 3 W14X30
3C26 3 W14X61 4C26 3 W14X30
3C27 3 W14X61 4C27 3 W14X30

Table 2. 14 Initial Column Sizes (ASD)

2-32