INSTRUCTION
V.1 1
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
6.5 Adjustment ring inclines……………………………………………………………………..… 31
6.6 Distribute plate bolt break…………………………………………………………………..… 32
6.7 Bowl loose……………………………………..………………………………………………... 32
6.8 Wear on undersurface of socket……………………………………….………………..…….. 32
6.9 Frozen countershaft……………………………………………………………………...…..… 33
6.10 Main shaft break……………………………………………………………………………… 33
6.11 The electric current excessively is high…………………………………………………..… 33
6.12 The crusher throw oil……………………………………………………………………….… 34
6.13The countershaft frame leak oil ……………………………………………………….…..… 35
6.15 Crusher stalling……………………………………………………………………………..… 36
6.16 The stuck of bowl…………………………………………………………………………...… 37
6.17 The crusher excessive vibration…………………………………………………………..… 37
6.18 Wear on head or bowl seating surface……………………………….…………………..… 38
6.19 The rotational speed of head is high ……………………………………………………..… 38
7 Maintenance………………………………………………………………………………...…..… 39
8 Electric system…………………………………………………………………………………… 40
PKY series 90KW single plane control cabinet operating instructions…………………..……. 40
8.1 Usage………………………………………………………………………………………….… 40
8.2 The condition of use…………………………………………………………………………… 40
8.3 Technical performance and protection characteristic………………………………………. 40
8.4 Product installment and use notice………………………………………………………....… 40
8.5 Operation procedure and electrical control principle explanation………………………… 41
9. Recommendation spare parts detailed list……………………………………..………….. 46
V.1 2
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
Preface
This installment instruction adopted for the new workers; to the experienced workers, using the
manual to make you more familiar with your machinery. Please read and research it carefully, and
carry it with you.
The explanation and illustration can help you to check, startup and operate the crusher and the
assistant equipment correctly.
These operating skills introduced here are the most basic. These and other skills will be generally
mastered as operators are deeply familiar with crusher and its technique.
The contents in this instruction are suitable to the condition when it is adapted, the manufacturer
has the right to stop producing some model crusher, change the technical data and product structure
at any time, not only not inform specially but also not assume any responsibility.
At any time,the question about the crusher and its instruction, please consult us, you will obtain
some new and useful information.
Be safety
The safety of the operators and other workers depends on their own carefulness and judgment
ability in the work. The careful operators can ensure the safety and avoid the accident.
Almost every accident mainly results from the insufficient observations and the half-hearted
precaution measurements. To most accidents, if we strength the recognition to the damages, and then
take corresponding precautions measurements, all of these are avoided.
Though we have carefully considered the safety problems when the machine is designed and
manufactured, there is still situation that can not be safe thoroughly in those places where do not
influence to reasonably approach and effectively operate. We have emphasized these situations by
marked black word in the instruction.
The contents in the instruction are suitable to the situation when it is adapted, the manufacturer
has the right to stop producing some model crusher, change the technical data and product structure
at any time, not only not inform specially but also not assume any responsibility.
SMH120
Model
coarse secondary fine
Max feed opening size(mm) 180 150 70
Recommends max feed size(mm) 160 130 50
Closed side setting size(mm) 22-32 13-26 9-19
Capacity(t/h) 100-160 60-130 40-110
Motor power(kW) 75-90
Motor rotation(r/min) 1440
Motor voltage(V) 380
Weight(include motor) (t) 12.5
SMH250
Model
coarse secondary fine
Max feed opening size(mm) 235 180 70
Recommends max feed size(mm) 210 160 63
Closed side setting size(mm) 25-51 16-38 10-25
Capacity(t/h) 260-380 145-280 120-250
Motor power(kW) 160-185
Motor rotation(r/min) 980
Motor voltage(V) 380
Weight(include motor) (t) 25
V.1 1
FIG1
V.1 2
the socket liner and the dust ring two round cambered surfaces.
3.3 Every two working days you should inspect closed side setting
3.5 It’s very important of oil temperature for cone, see page21~23.
V.1 3
The safety record shows that most accidents result from ignoring safety. Do remember at every
moment: safety is the first! Before you doing your work, you must ask clearly manager the rules and
regulations of operation and safety.
Is your dressed keep with the task requirement?
In order to your personal safety, you must know whether need safety cat, safety shoes, safety
glasses, protect eye glasses, protection gloves, protection ear device and so on, and wear the
necessary labor protections.
The clothes can not too large lest been drawn into the machinery inside; you should button your
wristband, wear the necessary labor insurance thing, not only keep warm, but also not restrict your
operation field. The watch and bracelet possibly lead to danger do not put these things which are
easily dropped out.
Do you understand the machinery capacity?
V.1 4
The unprepared machine is not the safe one; please examine carefully when you accept the work.
If you have found the problems, but you also decide to keep the present situation, you should consider
it over and over again. Even the small machinery fault can also lead to personal injury, and equipment
accident.
1. Without approval operators can not to operate.
2. Make sure all guard and protection devices order, safe, without damage.
3. Check the oil conduit system: If the level is normal, and if exist leakage.
4. Check all oil drain plugs, valves, joints and be sure their safe and reliable.
5. Pressure losses produced by the low oil location can lead to serious hydraulic accidents.
6. The one of reasons of crusher shaft block accidents is short of lubricant.
7. Do not absolutely to get higher work pressure by adjusting the safety valve pressure, the
pressure data introduced by the factory is the longest date in the safest situation.
8. Do not absolutely to move the safety measurements freely.
9. Check through the visible fault of the crusher, such as: Leakage, wearing,
10. Check the machines according to the work manual book and the manager instructions
11. You should walk one time around the machine before starting, make sure there is not person at
the side, the below, the up of the machine. Please remind surrounded people before you starting.
Do notify every accident to manager.
Safe remind:
1. Check the machine as warning sign.
2. Do start according to the procedure illustrated by the instruction.
V.1 5
Hang out the warning sign can avoid the accident in the following cases:
V.1 6
V.1 7
Crane
It is as same as other machine, if you want to get the best economic benefit from the crusher,
please do usual and period maintenance to it. To mostly crushers, the worst security violating actions
are insufficient hang ability and the unsafe crane. Though the crusher does not like the revolving part
of motor engine so precise, but the crushing pieces must be installed and uninstalled by the crane. The
crane should have the features of up and down steadily and slow speed. When operating the crane,
V.1 8
Automobile crane
When operating the steam crane, you must operate it in stipulated weight limit in order to avoid
deforming the crane arm or turning over. But weight is on the basic of the crane works on the firm and
level ground. The supporting frame should overlong properly, should low as soon as possible. Do not
quickly resolve, raise or brake suddenly, otherwise it will make overload, do not suspend the big and
heavy things in strong wind.
You should firstly examine the bridge whether it able to stand up the crane weight before it cross
the bridge. You should also examine the spatial situation under the bridge when you through the
aperture of bridge, such as whether there are electric wire or others.
Before lifting heavy things, you should make sure there are not obstructions surrounding the hang
things. Make sure the connection between the crane and the heavy thing is reliable.
Welding equipment
Gas cutting gun is one of the most used tools in crusher. When welding and cutting, the crusher
equipped with hydraulic device, should uninstall its all hydraulic parts and cover a fireproof material lid
on it, in order to against fire stars or welding splash broking them.
The belt conveyor
You must not to take the belt as passage. There should have sidewalk beside the belt conveyor,
as an additional safety measurement, you should set handrail along the thoroughfare.
The mobile crushing station
If the station is composed of mobile machines, it is to say to install the crushing and screening
machines on the trailer, then the foundation or frame are very important to manufacture. The machines
should install on the firm and level foundation. Using the crossties to front the trailer, in order to make
its wheels leave the ground according to requirements. Each screw jack is put in the trailer four
corners or their besides, the distance four jacks to the two sides of the corner must be equal.
The trailer across the bridge, do examine whether the bridge is able to stand up the machines
weights. Do examine the spatial situation under the bridge when through the aperture of bridge, such
as electric wire or others. Absolutely forbid the equipment which weight is near to the bridge loading
ability across the bridge, you should examine the local regulation, especially the weight limit.
The noise of the station
Each crushing machine has noise. Especially the supporting equipments such as slit, transferring
station, and screen and so on, their noise is worse. If the noise exceeds the law limit, the worker
should use the earmuff device. If the device does not solve the problem, you should consider reducing
the stay time of the workers or repairers that is to shorten of work time.
Though it is not workable from the economic opinion by changing the machine itself to reduce the
noise, many operators have found that building a cheap work room can reduce the noise. In the room,
the operator can see the machine which is working, but the against sound wall, double window and air
conditioner and so on can protect them against noise. The work facility must result in machine working
more effectively and reducing the potential noise damage.
Many operators in factory have found that build an operation tower above equipments, not only
can reduce noise harm, but also can raise the work efficiency.
V.1 9
There are many unexpected matters, such as: power off, suddenly increase feedings, etc., this can
lead to pile. The material hangar is possible potential resource of a serious accident.
In past, if you want to restart crusher, the only method is that workers take out materials in the
crushing cavity.
No wonder, the most dangerous work is eliminating iron block in chamber. It once happened many
serious accidents when doing it, it often make workers disabled.
This machine has enabled the work become extremely relaxed work, by releases cylinder to
instead of your dangerous and laborious work
Common maintenance work
Some works have to do when operating, the following is crusher normal operation rules, it appoints
out what you should do, what should not do.
1. You can not do maintenance on operating machine. The work concludes pour lubricating grease
into crusher parts.
2. You can not put your hand or leg on the release cylinder when the crusher is operating. These
release cylinders is utilized to protect the crusher when iron through crusher.
3. You must overhaul these machines according to the period stipulated by the manufacturer. This
overhaul can avoid damage the equipment and hurt workers.
4. Absolutely avoid stone in the crusher splash to their around, the phenomenon is because there
are big stone and pebble and so on. The works must guarantee there is not stone splashing, since
these stone will hurt the workers who pass by.
5. When the crusher is operating, if you do not take any protection measurement, you can’t look
into the cavity.
The instruction just concludes the special installation instruction of the machine, others you can
refer the general installation regulation of common machine.
V.1 10
Right wrong
The result of providing material averagely The result of providing material non-averagely
Displays the machine the biggest working ability Reduces the machine the working ability
The product size is even The product size is oversize
The release cylinder load is smallest The release cylinder load is oversized
The energy consumption is smallest The energy consumption is large
Copper bushing damage
V.1 11
V.1 12
5.3 Operation
5.3.1 Preparation before the crusher starts up
It is very useful for perennial well-running of crusher to have a benign check-up habit. Not only
restart depending on memory and the normal maintain once, but also do follow work before starting
and making exact note is needed to prolong life-span of crusher.
Preparation needed before the crusher starts up is as follows:
1.Firstly, check up whether the lubrication oil is correctly used and whether the lubrication system
is correctly installed.
Running the Oil pump firstly
2.Open the oil box and Check up whether the oil in the circling tube is circling. The oil drained
should account for half of total pipe at least, when it is running
3.At last, check up whether there are some appliances, facility obstacles and leak-oil in the
crusher, all the tie-in and fasten part have been tightened, and if exist factors disturbing start-up of the
crusher.
4.Turning the countershaft and check up whether the mantle and concave intervene in each other
and other obstacles.
5.Start up the crusher according to the procedure after all those check-up above.
The rotate speed of countershaft
The rotate speed of countershaft is very important to a normally running crusher. The size of
driven wheel is designed according to situation of full load. So, the rotate speed of countershaft without
load is a little higher than full load. It has been proved: when the countershaft is running at correct
rotate speed, we can get the most output and the even granularity of output.
The direction of the countershaft
The amount of crushed-stuff and the times of the stuff passing through the crusher are determined
by the rotate speed of countershaft. If the crusher can’t run at design speed, you must let crusher
run at a higher speed(within 5% more than designed speed) because the cumulate stuff in crusher
can lead crusher anchoring if the rotate speed of countershaft is very lower than design speed.
The direction of the countershaft is counter-clockwise.
V.1 13
V.1 14
V.1 15
V.1 16
Basic condition
The thin oil lubricating equipment, uses the gear pump, the actuating medium viscosity rank is N22
~ N220, the chiller cooling capacity is when enters the oil temperature is 50 ℃, lubricating oil
temperature reduce 5 ~ 8 ℃.
a Equipment composition
The oil lubrication system is mainly composed of fuel tank, the electric heater, the oil pump
installment, the filter, the cooler, the oil discharge magnetism (grid) the net filtrating equipment, the oil
stream receiver, the function valve (cone-way valve, safety valve, switch valve) and the pipeline,
controls the part (pressure controller, differential pressure controller, temperature controller, fluid
V.1 17
b Principle of work
When at work, the ration pump oil from the fuel tank, the absorbed oil increased pressure by ration
pump, and then through one-way valve, flitter, water-cooler, functional valve and pipe sent to the
lubrication part. After the liquid oil lubricating and cooling the lubrication part then along the pipe
enter the oil tank, the oil in the oil tank is flittered then enters into the next cycle.
c Part function
1. Fuel tank
The fuel tank main function is gathers oil, but also concurrently makes radiation and precipitation.
2. Heater
The heater’s function is heating up oil in tank, when in the fuel tank oil temperature is lower than
the lower limit value, the electric heater automatically carries on heats up, in the heating process the
oil pump cannot start. When the in the fuel tank oil temperature reach upper limiting value, the electric
heater automatically stops.
3. The oil pump installs
The thin oil lubricating equipment has a table oil pump-unit, extracts the lubricating oil from the
fuel tank, and transports oil to lubrication part.
4. Filter
When the work filter element pressure achieved the definite value, the differential pressure
controller sends out alarm, the filter element can be allowed to disassemble and clean.
5. cooler
Cooler function’s is cool down oil, when oil temperature reached 35 degrees. Artificially adjust the
cooling valve opening, then cooling the oil.
6. Oil discharge magnetism (grid) net filter equipment
The oil discharge magnetism (grid) the net filtrating equipment is installed in the discharge cavity
of fuel tank, the main function is filter for ferromagnetism which returns from crusher.
7. Safety value
Its function is to insure the highest working pressure isn’t over the setting number, when the
system pressure reaching this setting value, safety value opened, liquid oil flow into box.
8. Oil stream receiver ⑨
The oil stream receiver’s function is that it can observe the condition of flowing oil and it can sent
out signals about shorting of oil or cut off oil ,thereby realize monitor or control from long distance .
9. Meter
The measuring appliance function is in the display system the different spot temperature, the
pressure, the fluid position value; in order to direct-viewing know the system condition.
10. Control component and electric control cabinet.
The measuring appliance’s function is checking the system‘s temperature pressure
Differential pressure, fluid position and Parameter so on,
When reaching the setting value, sent out information to the electronic control cabinet, then the
main component of the electronic control work make out alarming signal .the function of electronic
control cabinet is to communicate between the operation of system component and the electronic
V.1 18
V.1 19
a Classification of Equipment
The oil lubricating Equipment is an integral type.
b The installment standard
YBJ207-85 related specification and the instruction book content in the <<Hydraulic pressure, Air
operated, Lubrication system Construction and Approval Standard>>
c the installment of integral type thin oil lubricating equipment.
All parts of Integral-type oil lubricating Composite to be a rigid body, after the installment it does
not need to be tighten by the foot bolt; To smaller oil lubricating utensils, when installment, only
steadily place it on level cement ground which horizontal plane is slightly 20mm bigger compared with
equipment length and width,
d Only After interior installs of oil lubricating utensils, the scene pipeline could be installed.
V.1 20
V.1 21
1. Any time to a refueling system, it should be used oil filter, oil filter accuracy not less than
0.12mm.
V.1 22
V.1 23
Motor electrifying driven by rotary pump, in import form negative pressure, pump is inhaling oil
under the atmospheric pressure, after by the discharge of oil from direction change valve and overflow
valve on role of work part, after complete condition it unloading flowed to tank.
a.Determine whether short of oil before startup, the joint leak oil , motor test whether the reverse
operation, pumps and avoid drying damage;
b.Before cone crusher, opening Cover, inspect if system pressure between 14-16MPa, At this
point should be at a "manual" block positions, such as pressure below 143Mpa, by "release cylinder
lock" button for compensate pressure
c .The Auto / Manual switch to the "automatic" block, after adjust pressure
d. After shut off cone crusher, authorities Auto / Manual switch to "Manual" block.
e.The cone crusher meets the iron in the course of working case, and it may lead to stop, this time
operates as the following process:
e1. Cut off the cone crusher power
e2. Press manual / automatic switch revolve to "manual"
e3. Hydraulic station controller by the shop "- clean" button, Raising bowl;
e4. Remove iron or other things
e5. Hydraulic station controller by shop “release cylinder lock” button, till pump automatically shut
down, locks sets of bowl;
e6. Make manual / automatic switch to "automatic" block.
f. When needs to adjust closed side setting according to the following process:
f1. Cut off cone crusher power
f2. Loose lock key of adjust rod.
f3. Make manual / automatic switch to "manual".
f4. Hydraulic station controller by shop "to promote pull cylinder forward" button, promote cylinder
fork out;
f5. Hydraulic station controller by shop "to promote pull cylinder backward" button to promote
cylinder fork retreat;
f6. If demand to adjusting closed setting, manually rotating cylinder to promote, promote cylinder
fork contacts adjustment cap reinforcement plate, repeat f.3. f4 process;
f7. Lock key tightly
f8. Make manual / automatic switch to "automatic" block.
5.3.14.3 Instruction
a. The valve is aside expert pipe for relieving pressurel before repair, forbidden to open this valve
when cone crusher running
b. Don’t do any operation in crushing process;
V.1 24
5.3.14.5 Maintenance
V.1 25
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
5.3.14.6 Equipment installment chart
V.1 26
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
V.1
power light
stop ungency
manual\automatic
clean chamber
M
电动机 outer to lock
montor
outer to lock
27
TERMINAL CHART 端子说明
低压控制器SP1接至(3、15)
ITEM PRINCIPLE CHART
高压控制器SP2接至(3、25)
1 3 超高压控制器SP3接至(3、28)
外报警接至(28、2)
2 3 清腔电磁阀YV1接至(29、2)
3 锁紧电磁阀YV2接至(31、2)
3
推动缸进电磁阀YV3接至(33、2)
4 15 推动缸退电磁阀YV4接至(35、2)
过铁外接连锁接至(39、41)
5 过铁外接连锁接至(43、45)
25
6 28 主机运行连锁接至(3、31)
7
29 TERMINAL SPECIFICATION
8 31 lower pressure controllerSP1 connect to(3、15)
higher pressure controllerSP2 connect to(3、25)
9 33 excessive higher pressure controllerSP3 connect to(3、18)
10 outer alarm connect to(28、2)
35
clean electromagnetism value YV1 connect to(29、2)
11 39 lock electromagnetism value YV2 connect to(31、2)
push cylinder foreward electromagnetism value YV3 connect to(33、2)
12 push cylinder backward electromagnetism value YV4 connect to(35、2)
41
pass iron outer locked connect to(39、41)
13
43 pass iron outer locked connect to(39、41)
14 crusher running locked connect to(3、31)
45
15 2
16 2
17 2
18 2
V.1 28
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
6 Breakdown analysis
1.The abrasion of oil pump-oil is in short 1.To check whether the currency of oil flow is right
supply. in drain lines.
2.There is not enough running clearance 2.To check the abrasive condition of the socket liner
between the main shaft and the eccentric and the head surface bases on the bottom of socket
bushing. liner. The head surface should be smooth without
any visible step.
3.Oil can not be drained normally. 3.Checking the drain pipe tilt from crusher to oil
tank (minimum 1:12) Cleaning air breather on side
of countershaft frame.
4.To use inappropriate crusher liner. 4.Excessive material is crushed at lower of crusher
cavity, which leads to extremely high power
consumption.
5.Hot or hard feed causes crusher overheating. 5.To install oil cooler according to actual situation.
6.There is no sufficient clearance between top 6.To keep the correct clearance between the socket
surface of eccentric part and underside surface and eccentric. It is easy to cause local hot point
of socket. when the distance between the eccentric bushing
and main shafts is minimum.(requiring the
clearance between 3-8mm )
7.Oil is in short supply. 7.Checking whether the safety valve is abrasion,
the metal chips or the stuck spring. Lubrication oil
flows into the oil tank bypass. Checking whether oil
level of oil tank is correct.
8.Driven V-belt tensioned tightly. 8.To adjust the tense degree of the V-belt again.
9.The inappropriate use of lubrication oil. 9.To use suitable lubrication oil. Suggest using
extreme pressure lubrication oil.
10. The output of crusher is too high. 10. Usually due to improper feed, too many small
mines or crushing setting be adjusted too small.
11. The closed side setting is too small. 11. The crushing setting not smaller than the
minimum recommending.
12. There is no adequate clearance between 12. The Oil trapped between the main frame
top of main frame bushing and bottom of the bushing and the eccentric. The main frame bushing
gear. must be kept even with the main frame.
13. The washer between bottom plate and 13. Don’t use the washer which is thinner than
bottom cover of main frame is quite thin, so “the 0.8mm.
rim” moves toward centre oil hole and
lubrication oil for eccentric bushing is reduced.
14. The hole of lubrication in main shaft or head 14 The vertical and horizontal hole of main shaft,
is blocked up by dirt or something else. holes of head should use high-pressure air to clean.
15. Main frame bushing gets stuck in the hole 15 Mainframe hole must keep its original diameter,
of main frame or top of inner hole of main frame through the machine can also be manually grinding.
sinks. Grinding manual required 6-8 hours to complete
V.1 29
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
The eccentric bushing sinks on the top of and is confined to a limited extent, is rough and
eccentric’s brim. (This brim is just irregular. But this is really solving the rack "collapse"
corresponding with the gear key.) part of an effective method.
16. Artificial grind eccentric sets aside the "collapse"
location, so close the bottom of frame bushing
inside the hole on the main frame. But not forcibly
mainframe bushing in place.
V.1 30
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
6.3 Gear and pinion tooth wear
V.1 31
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
6.6 Distribute plate bolt break
The Possibility of Coming into Breakdown Solution
V.1 32
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
6.9 Frozen or break countershaft
V.1 33
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
6.12 The crusher throwing oil
The breakdown produces possibility Solution
1. socket liners surfaces wear (head normal spin 1. Head spin are too fast, regrinds socket liners or
rotation speed 0~20 /minute) replaces new socket liners, guarantees head
and socket liners contact in the outer edge of
socket liner.
2. Socket seal was jammed, it causes head lift 2. As only one of the key is usually act at cocked
upward away from socket liners. location, excessive dust accumulate at spring and
spring ring around hole , chamber has been
filled with broken materials, so push up seal
ring. Crushers must disassemble and clean
socket liner thoroughly.
3. The oil pressure is too high. 3. Oil pressure is excessively high lifts head to
socket liners. The main reason is running crusher
in cold day, the oil excessively cold or the safety
valve adjusted improperly.
4. The main shaft inserts excessively much in 4. Usual performance is head spin excessively
main shaft bushing, causes revolution gap to be fast, generally because socket liners wears or the
improper, because great friction force on the main crusher is excessively hot.
shaft.
5. Distribute plate wears too seriously. 5. The replacement distributes plate or with welds
several steel plates on distributes plate, provide
suitable balance.
6. Slabby feed being trapped under distribute 6. Reduces the size of feed.
plate, cocking head.
7. The oil is too cold. 7. Heats up oil to 27 degree Celsius.
8. the loading of crackers is too little 8. Increasing feeding under the load condition,
socket liners contact on outer edge; Under light
load, socket liners inside edge contact. Grinds or
replace socket liners, simultaneously, the head
spherical surface possibly also needs re- process.
9. The shaft drive speed is excessively high (rpm). 9. Inspection drive shaft rotational speed (rpm).
10 Used improper oil. The oil too sticks. 10. Changes to right oil.
11. The air breather is not good. 11. Cleaning up breather installation aside
countershaft housing. Blows with compressed air
on the long core hole of breather.
12. Socket oil hole and the air vent stop up, cause 12. Disassembling and cleaning up oil draining
oil drain obstruction. pipe and air vent of socket and socket liners
13. Drainage pipes have contamination or other 13. Replacement of oil hose and discharge on
sundry. sharp bends.
14. In addition, meets a drainage pipe toward oil
tank.
15. Inspects drainage pipe, when necessarily
cleans.
V.1 34
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
6.13 oil leak at pulley
The breakdown produces possibility Solution
1.The crushers ventilates not well. 1. Cleaning up breather aside countershaft
2.Shaft housing between cover seal wear. housing. Blows with high compressed air on the
long cored hole of countershaft housing.
2. Replace of seal if necessary, re-processing.
V.1 35
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
6.15 Crusher stalling
V.1 36
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
6.16 Bowl struck
1. Due to wear parts weight changes. 1 excessive wear distribute plate, add weight or
replace worn-out parts.。
2. Head spin too quickly. (> 20 rpm) 2. As the Bushing and the main shaft occurred
seize, that the head moving with eccentric.
3. Gear interfere with pinion at top。 3. Tip clearance is small size than normal, gear
meshing not good, raise Eccentric up by
shimming.
4. Bent countershaft. 4. Shaft replacement
5. Crushers Pulley serious imbalance 5. Remove accumulated dust from wheel.
6. If the Crushers in a mobile vehicle, stack or 6. Stacks of plates and check soil
plates soil is not suitable.
7. Ground support capacity is insufficient 7 Foundation or ground inspection
8. Mantle loosening 8. Disassembling the mantle, re-installation
9 Shaft turn at high speed(rpm)。 9. Shaft Speed check(rpm)。
10. Uneven or excessive feeding. 10. Improve feeding.
V.1 37
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
6.18. Wear on surface of head or bowl seating
The breakdown produces possibility Solution
1.Mantle and concave loose, but crusher still 1. Mantle and concave associated component are
working 。 to be placed in appropriate operation. Main shaft
2. Mantle and concave are excessively worn, but nut must be held tightly before operation.
crushing is still running. 2. Mantle and concave be thin shape, accelerate
3. Mantle concave completely worn out broken, wearing on surface of head or surface of bowl.
crushing happen at head or at bowl. 3 See Note 2.。
4. Mantle and concave exist cracks 4 See Note 2.。
V.1 38
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
7. Maintenance and Repair
After crusher installation and normal operation,Conventional regular maintenance is the best way
to maintain the crusher good operating condition Overhaul Crushers regularly, before accident, you
should replace worn parts. Periodic inspection and maintenance items listed in the periodic table for
inspection and maintenance. These maintenance projects are for users. Users must be based on
specific and reduce or extend maintenance cycle. According to types of materials, climatic conditions,
to decide work conditions frequency of maintenance.
Crushers should be kept clean, paint intact. Using a careful, better maintenance, clean machinery
may be long span service than which be neglected or abused.
Eight hours Forty hours Two hundred hours Two thousand hours
1. Check the level of oil in 1. Check V-belt for 1. Loose bowls from 1. Check the thrust bearing
oil tank. tension wear and crushing position plate wear.
2. Oil temperature check. breaks. and turning back and 2.check main shaft bushing
3. Inspect the Hydraulic 2. Check oil leak in forth. and mainframe bushing
oil flow and pressure. pipeline and crusher. . 2. Check whether wear
4. Check power draw on 3. Inspect mantle, any dirt and sludge 3. Inspect big, small gear
motor. concave fastening in lubricants, as wear, and check backlash
5. Examine and adjust case. necessary and root clearances.
tightness of taper keys at 4. Check crusher replacement.
adjustment cap.. setting. 3. Check whether oil 4. Check wearing of socket
6. Check the tightness of 5. Clean breathers of strainer for metal liner.
connections or fasteners. countershaft and tank. chips, occasionally 5.check wearing of
7. To check whether there 6. Bowl Position at some small mental sealing ring and spring hole
is any unusual noise, crushing, it is flak is normal .A and the spring effective
wear signs of excessive lubricated by add large quantity of pressure of the sealing ring
deformation on crusher grease through fitting chips may indicate
parts. at supporting ring. excessive pressure 6.inspect main shaft head
8. When the liner wears 7. Examine on bearing surfaces and wear
close to the limit, they adjustment cap seals or possible bearing 7. Examine thread of bowl
should check every day. against bowl hopper. failure. and adjustment ring wear.
9. Check two flows back 8. Check movement of 4. Check mantle and 8.check the wear of roll
into the oil tank, from the the release cylinder or concave wear. Bearing
safety valve and from adjustment ring. 5. Check hopper and 9. Check if washer, ring,
crushers. 9. Inspect pulley dust distribute wearing. "O" ring and the seal ring
10. Inspect the alarm deposition, cracked 6. Replace the leak.
System is function. spoke and shaft horizontal shaft: 10.check the Oil collar gear
After stopping, Inspect fasten. change lubricants and oil pump gear wear
whether Crusher in 10. Check fastening into the breathing 11. Check main frame liner
"floating status" to easy situation of distribute hole, thus oil from wear.
stop. plate bolt. the oil plug holes 12.check whether there are
Check feed Distribution is through. Oil position cracks in weld inspection
properly. must meet side hole 13.replace the lubricating
Check if crusher has free location. oil in tank
discharge.
V.1 39
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
8. Electric appliance system
The introduction of 90kw single controller
8.1 Application
The AAA of pky -22 court of homes is product of electric equipment which prove cone crusher
produce smoothly
V.1 40
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
c) Whether the communication or cut is correct, whether the assist joint’s communication is
reliable and correct.
d) Whether the way of inputting circuit and output circuit is fit requirement of electric principle.
e) Whether the safeguard grounding system is fit the technology requirement.
f) The resistance does not lower than 1MQ with the 500v block for checking, the insulation voltage
of equipment over 60-660v.
g) The repairing man should follow connection chart of one time loop circuit and double loop
circuit, and connect outside equipment (electrical heater, temperature controller coil, locking
device with crusher) to the respective terminal; the correspondence load motor is connected to
one time loop circuit.
When it does work well after checking out, then it can operate with supplied electricity.
control principle.
The power source indicate HD red light, when power on, and when the ammeter indicates the
line-v, it can check out whether the three-phase electric power voltage working well.
1. When the oil pump working well, press the starting button of crusher, SD1 red light will be on,
when the crusher is in star starting style .after about 60s, SD1 green light on, the crusher is in triangle
style.
2.When in operating, it appears pressure at low limit, oil temperature at upper limit, oil level in oil
tank at upper limit, low limit, exceed pressure difference, through KA3 relief contact close,HD2 light
bright on at same time, buzzer set out alarm, inform need take safety measurement.
3. When pressure is lower, or oil currency is lower, or the temperature of oil is higher, KA4 closed
contact open, crusher stop work, SD2 red light bright,
4. When the crusher is overloading, the crusher hot relay FR1 closed contact will open, the reliefed
jcontact will close, the crusher dose not work, meanwhile the red light of the sd2 is bright . outside alert
light alarm.
In the main engine a KM3 auxiliary contact (101-103) directs to terminal, (provides main crusher
work signal) for the external circuit interconnection.
This explanation according to normal interconnection operating control. If the user under specific
environment and condition, may adjust according to the practical application situation, or explained in
order.
If there have breakdown in operating, you should first shut off two times control loop circuit power,
then shut off one time QF of control loop circuit power source. And after confirm safe correct, carry on
service operation by specialized serviceman again.
V.1 41
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
FU3
R3
heater
9 KW
FU2
R2
FU1
R1
KM2
oil pump
2.2 KW
KM1
FR1
V.1 42
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
V.1
FU3 L1 L11
131
133
121
113
125
135
123
137
SD1
FR2
crusher running
power cancel alarm pass iron
indication (red light starting,) small facult alarm heavy facult
indication
(green light working)
43
V.1
L11
KA0
1 lower
SB3(locked)
P SP
limit S T2
SB1
2 22
lower upper
36 37 38 39 40
limit limit
KM2
23 24 26
SB2
SB4
KM1 KA2 KA3 KA4
KA5 KA6
54 55 56 57 58
WJ1 WJ2 KA1 KM2
3 KM2 HD1 HD2
FR1 LD1 21 25 36 37 38 39 40
LD2
N
KM1 KM2 KA0 KA1 KA2 KA3 KA4 KA5 KA6
44
V.1
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
+2 -2 L11 39 +1 -1 22 26
T2 upper
limit
1 2 3 4 5 6 7 1 2 3 4 5 6 7
高 总 低 地 中 相 高 总 低 地 中 相
lower
oil supply expert oil limit
temperature N L11 22 24 N L11
controller circuit
45
9 Recommendation spare parts detailed list
You should prepare for the following parts for short stopping time.
concave
mantle
Oil pump:
Thrust bearing washer (a set)
Socket seal (a set)
Spring housing
Releases the cylinder (a set)
High-pressure oil pipe JB1885.2-8ⅢX0450, JB1885.1-8ⅢX1000 (a set SMH120), JB1885.1-8Ⅲ
X1700 (a set SMH250), JB1885.2-8ⅢX12000 (a set)
The upper spare parts are low limited. If the crusher installs in the remote district or simultaneously
is loaded with several crushers, prepares the number of spare part to be supposed. Therefore, about
yours peculiar circumstance ask factory for spare part detail list.
Concave
mantle
V.1 46
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
Thrust bearing washer
Spring housing
Socket seal
V.1 47
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn
Releases the cylinder
V.1 48
PDF 文件使用 "pdfFactory Pro" 试用版本创建 www.fineprint.cn