Professional Documents
Culture Documents
PARKING ALLOCATION 2023 - 5th
PARKING ALLOCATION 2023 - 5th
PARKING ALLOCATION 2023 - 5th
36.35 METERS
0.80 5.60 5.73 3.11 2.83 2.65 4.24 2.35 2.55 6.42 0.075
A-26
0.80
4 S.71°48'E.36.35 M. 1
7'
2.05
7
RAMPWAY (6.00 M.)
3.12
6.00
33 RAMP UP
1.20 M. WALL
RAMP DN
MFD
PIPE CHASE
9
0.803.12
( L.43.45 M.)
L
6'
AL
32 1
3.17
.W
PC
2.50
M
34
1.86
20
1.
E
6 MFD
STAIR-2
4 DN
2.80
2.65
2.43
2 31 2
(6.00 M. WIDE)
13
(6.00 M. WIDE)
UP
DRIVEWAY
A-26 PC
DRIVEWAY
5''
SERVICE
0.802.65
SERVICE
2.43
3.30
30 LOBBY ELEVATOR 14 3
EL. 43.45 M.)
(
2.43
15
2.47
PASSENGER PASSENGER
2.47
29 ELEVATOR ELEVATOR 4
5'
1.77
AFSD
HIGH-ZONE 8 DN
LIFT LOBBY
2.47
28 (3.00 M. WIDE) 5
2.29
AFSD EL. 37.25 M.)
(
5.73
4 STAIR-6
S.18°12'W.49.25 M.
N.18°12'E.49.25 M.
LOWER 5TH
2.47
4
(
DRIVER'S
LOUNGE
2.63
AFSD
STAIR-7
LOW-ZONE
2.10
3
LIFT LOBBY
2.37
25 8
EL. 43.45 M.) AFSD
(
DN
3' 8
3.15
PC
2.37
24 MFD
PASSENGER PASSENGER
2.80
ELEVATOR ELEVATOR 4 9
STAIR-1
DN UP
(6.00 M. WIDE)
(6.00 M. WIDE)
1.20
PARKING
DRIVEWAY
3
DRIVEWAY
NO
2.62
20
2.51
23 10
6.00
16
2.62
8.41
19
2.51
22 PC 11
2.50
2.51
18 17 12
21
RAMP DN
2 1.20 M. WALL
RAMP UP
2.60
2'
PROPERTY LINE
0.89 1.71
1
3 N.71°48'W.36.35 M. 2
1a
A-29