TOTAl FINISHED
SL .NO DESCRIPTION OF WORK QAUNITY 8/4/2023 9/4/2023
QAUNTITY
18 nos 18 nos
450 NOS
330 NOS
100 M
18 nos 18 nos
80 M 50 m 50 m 180 m
250 m 500 m 150 m 50
PROJECT : PLANTATION & IRRIGATION AT NIMR
SITE : MAC 3
DAILY PROGRESS REPORT
TOTAl
FINISHED
SL .NO DESCRIPTION OF WORK QAUNITY 8/4/2023
QAUNTITY
1 excavataion of native tree 2196 nos 1800
2 excavataion of plam tree 62 nos 26 18
3 excavataion of lemon tree 122 nos 20
4 fence excavation 150 nos 42 nos
5 installation of fence foundation 150 nos 15 35
6 backfilling of native tree 2196 nos 1800
7 manual excavation native tree 2196 nos 1230
8 marking for native tree excvavation 2196 nos 1800
9 road crossing pipe line excavation 8m 8m(finished)
10 trench excavation for 3" pipe line 550 m 160 m
11 3" hdpe roll pipe made straight (4x150m) 600 m
12 installation of 3" hdpe pipe 550 m
13 backfilling of plam tree 62 nos
14 fertilzer filling for native tree 2196 NOS
15
16
17
9/4/2023 10/4/2023 11/4/2023 12/4/2023 13/5/2023
85 100 90
18
10 30 62
31 nos 25
12 18
25 m
400 m 150 M
30 nos 32
240 270 240 186