Training Requirements:
Daily tool box meeting briefing.
Use ofexcavation Awarenessbriefing .
Use offireextinguishersbriefing
Equipment Requirements:
PPE– highvisibilityvest
PPE– glovesand safetyboots.
PPE– gogglesorweldingmask.
Barricading Around working area.
Fireextinguisher ( ABC type dryChemical powder ( minimum 5 Kg 1 EA must available in vehicle
)
Document Requirements:
Check validity of the cold work permit.
Copy of the work permit must be placed into PTW folder at site
Copyoftheriskassessmentandmethodof statementforthetaskbeingcarriedout.
Alloftheabovedocumentsmustbeshownuponrequestbyanauthorizedperson.
1. Check that authorization has been given by the SECL and that the excavation area has been
checked for underground services or overhead utilities
2. Carry out Tool Box Meeting
3. Job preparation and planning prior to fitting off plumbing components
4. Select the right components to be fitted
5. Manual handling issues when handling and fitting-off plumbing components
6. Personnel protective equipments to be worn all the time
7. Ensure that housekeeping is done after the work
Safety Boots Gloves Eye Protection Respiratory Hard Hats Hearing PPE Face Shield
Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No