ELKHOMRA PROJECT

METHOD OF STATEMENT

Wooden Doors works

Table of contents
PURPOSE 

SCOPE 

RESPONSIBILITY 

MANPOWER 

TOOL & EQUIPMENT 

METHODS / PROCEDURES 

SAFETY PRECAUTION 

Attachment 
ELKHOMRA PROJECT

 - PURPOSE
This Method Statement of Wooden Door defines the installation
process, quality control, and safety requirements, as well as the
equipment to be used to perform the tasks according to the project
specifications.

 - SCOPE

wood door installation Method of Statement includes the following;


• Non-fire rated semi-solid-core wood door.
• Non-fire-rated semi-slid-core custom-fabricated wood door access
doors.
• Wood veneer, solid hardwood raised panels and stained varnish

 - RESPONSIBILITY

A full and detailed description of roles and responsibilities of all staff is included within
the project quality plan . for the works as covered this method statement , the following
personnel have specific duti es

Technical Officer Engineer: Specific responsibilities include:


- Responsible for ensuring that the various submitting are timely undertaken (materials,
method statements, workshop drawings, subcontractor’s issues, technical issues).
- Responsible for quotations as required (materials, subcontractors).

- Responsible for ensuring RFI’s are timely undertaken on behalf of contractor.


- Responsible for the distribution of documents within contractor site personnel.

Site Engineer(s). Specific responsibilities include:


- Ensuring that the project is managed in a safe manner and meets the requirements
Of the project documentation
- Ensuring that subcontractors and suppliers achieve the on-site required
Standards
ELKHOMRA PROJECT
.
- Ensuring the Client is satisfied with our performance .
- Ensuring performance measurable are delivered.

- Shall refer to the QA/QC Department and the HSE Department for advice and
guidance when required.

- Shall ensure that operatives comply with the relevant method statements, Toolbox
Talks and general site briefings.

HSE Site Representative(s). Specific responsibilities include:


- Assisting in the production of any health, safety, and environmental documents.
- Monitoring the implementation of health, safety, and environmental
Requirement
- Undertaking audits and ensuring that corrective and preventive actions are
- Taken where required Liaison with the senior site staff on health, safety, and
Environmental related matters

QA/QC Site Representative(s). Specific responsibilities include:


- Carrying out phased inspections as required.
- Ensuring that completed works are offered for inspection/approval to external

companies within specific dates/programmers.


- Preparation of the ITP.
- Ensuring that all required tests are performed and follow appropriate
specifications etc.
- Reviewing and ensuring that all shop drawings and material submitting are
presented to the appropriate bodies with adequate supporting information.
-Ensuring that materials are inspected when delivered to ensure they comply with the
various specifications

-Maintaining a record of all QA/QC activities on site.


- Controlling and ensuring all measuring and test equipment on site is properly calibrated.
ELKHOMRA PROJECT
-Controlling all non-conforming products or
workmanship and implementing the required preventive actions.
-Ensuring that corrective and preventive actions are taken when required.

-Ensuring that the required testing is undertaken by approved independent laboratories,


and that all test results are reviewed.

-Undertake audits to ensure conformance to agreed Standards, Legislation, and project


specific requirements.
-Ensuring that staffs are aware of their responsibilities in respect of quality issues.

-Assisting and reporting to the QA/QC Manager as required.

Supervisor(s). Specific responsibilities include:


-To ensure that all operatives and appropriate subcontractors have been briefed as to the
content of the method statement and the works.

-To adequately control the works as required.

-To ensure the works are undertaken in a safe manner.


- To ensure all operatives are adequately training in their respective works.

-Reporting any UN-safe practices on site to the site team.

Subcontractors. Specific responsibilities include:


-To undertake their works as specified.

-To work in a safe manner.


-To ensure all operatives are adequately training in their respective works.
-Report any UN-safe practices on site to the site team.
ELKHOMRA PROJECT

 - MANPOWER
The Civil Supervisor shall control the overall activities at site and he will be directly
reporting to the Site Superintendent. The basic manpower under him shall consist
but not limited to the following:
 Lead Pre-Commissioning Engineer
 Testing Engineer
 Civil Lead Man
 Senior Technicians
 Technician
 Vendor Represented (if need)
 QC Engineer / Inspector
 Safety Engineer
 Company Representative

 - TOOLS & EQUIPMENTS

1- Leveling tools
2- measuring tape
3 – Drilling machine
4 – Screwdriver machine
5 – Plumb
6 – Hammer

 Materials :-

1 – Wooden doors as approved sample


2 – Wooden doors frame as approved sample
3 – Hinges as approved
4 – screw
5 – Handle towel bolts as approved
6 – Doors stopper as approved
7 – Architrave as approved sample
8 – Door foam

 - METHODS / PROCEDURES
ELKHOMRA PROJECT
A. Store Doors in clean dry ventilated area. Stack doors flat
and off floors, supported to prevent wharfing. No other materials to be place on top of
stacked doors.
B. All doors will be packed with plastic, cardboard protection to edges.
C. Store flat over level surface above floor on wood blocks.
D. Each doors and frames tagged with sticker with door number and location.
E. All doors and frames delivered with finish factory painting final touch will be at site
before handing over.
F. Check the tagged each door and locate as per the approved shop drawing and door
schedule.
G. Verify opening dimension and angles and levels from finish floor line reference to
ensure that frames fit the openings. Align and fit the door in frame to each desired
location and elevation.

H. Fix door frames by Foam injection as per shop drawings and to be fill for 3 frame
direction ( left side +right side + up )
I. Install, align and fit the doors in frames with uniform clearance and bevel to provide
3mm at heads, jambs and between pairs of doors, bottom of door to top of decorative
floor finish or covering as per approved shop drawings.
J. Architraves’ will be fixed by nail and to be covered by stain and color . All surrounding
gaps will be filled with silicone.
K. Completed wood doors shall operate freely and smoothly without rattle or bound
condition.
L. Clean stains and traces of cleaning fluid.

 - SAFETY PRECAUTION

-Safety requirements will be addressed in accordance with the project General


safety plan .

-Tools and equipment will be inspected periodic.