METHOD OF STATEMENT
Table of contents
PURPOSE
SCOPE
RESPONSIBILITY
MANPOWER
METHODS / PROCEDURES
SAFETY PRECAUTION
Attachment
ELKHOMRA PROJECT
- PURPOSE
This Method Statement of Wooden Door defines the installation
process, quality control, and safety requirements, as well as the
equipment to be used to perform the tasks according to the project
specifications.
- SCOPE
- RESPONSIBILITY
A full and detailed description of roles and responsibilities of all staff is included within
the project quality plan . for the works as covered this method statement , the following
personnel have specific duti es
- Shall refer to the QA/QC Department and the HSE Department for advice and
guidance when required.
- Shall ensure that operatives comply with the relevant method statements, Toolbox
Talks and general site briefings.
- MANPOWER
The Civil Supervisor shall control the overall activities at site and he will be directly
reporting to the Site Superintendent. The basic manpower under him shall consist
but not limited to the following:
Lead Pre-Commissioning Engineer
Testing Engineer
Civil Lead Man
Senior Technicians
Technician
Vendor Represented (if need)
QC Engineer / Inspector
Safety Engineer
Company Representative
1- Leveling tools
2- measuring tape
3 – Drilling machine
4 – Screwdriver machine
5 – Plumb
6 – Hammer
Materials :-
- METHODS / PROCEDURES
ELKHOMRA PROJECT
A. Store Doors in clean dry ventilated area. Stack doors flat
and off floors, supported to prevent wharfing. No other materials to be place on top of
stacked doors.
B. All doors will be packed with plastic, cardboard protection to edges.
C. Store flat over level surface above floor on wood blocks.
D. Each doors and frames tagged with sticker with door number and location.
E. All doors and frames delivered with finish factory painting final touch will be at site
before handing over.
F. Check the tagged each door and locate as per the approved shop drawing and door
schedule.
G. Verify opening dimension and angles and levels from finish floor line reference to
ensure that frames fit the openings. Align and fit the door in frame to each desired
location and elevation.
H. Fix door frames by Foam injection as per shop drawings and to be fill for 3 frame
direction ( left side +right side + up )
I. Install, align and fit the doors in frames with uniform clearance and bevel to provide
3mm at heads, jambs and between pairs of doors, bottom of door to top of decorative
floor finish or covering as per approved shop drawings.
J. Architraves’ will be fixed by nail and to be covered by stain and color . All surrounding
gaps will be filled with silicone.
K. Completed wood doors shall operate freely and smoothly without rattle or bound
condition.
L. Clean stains and traces of cleaning fluid.
- SAFETY PRECAUTION