NAME OF DIVISION - BUILDING
H.PD.C Solar Motor
Estimate For Construction of Aaganbari Kcndra With l 2022-2023
NAME OF WORK:
Pump Set Jalminar at Daltonganj. Palamu. For The Year
ESTIMATED COST :- 16,56,200.00
Executive Engincer
Building Division Daltonganj
ete For Construotion of Aaganbart Kendra With 1 H.P D.C Solar Motor Pump Sot Jalminar at Daltonganj, Palamu.
For The Year 2022-2023
J.E A.E
Building Divsion, Building Divsion, Building Divsion,
Daltonganj. Daltonganj. Daltonganj.
omaline tor R
Technial
áitun
Ceestrcion o AsganbariKendrs WRh 1HPDC Solar Woto Pump Set Jalninar a Datongan, Palg mu, For The Year 2022-2023
Rate Amount in
em No. tem Of
Work NO L B. H Qty. Unit
l(in Rs.) Rs.
11
Eattworkin excareton in foundation trenches in
tard soil do-do comde'e
|16.00 |2.50 250 3.00 300.00 cf
1.00 204.26 1.00 1.50 30639 ct
|.00 10.00 |15.00 |1.00 150.00
756.39 c
Providing coarse dean sand in iEing in loundaion
21.42 M3 151.82 3252.20
51.10
venches do-do-omplee job.
|16.00 2.50 |250 |0.25 l25.00
1.00 204.26 1.00 J025 51.07 ct
|100 20.00 15.00 J0.25 75.00 |ct
1.00 5.00 5.00 0.25 6.25 ct
|1.00 5.00 5.75 |0.25 7.19 cit
1.00 4.50 6.00 0.25 9.00 cít
1.007.75 31.16 0.25 60.37 cft
|1.00 9.75 |4.50 025 10.97 c
l1.00 10.00 |15.00 0.25 |37.50
282.34
7.99 589.51 471247
J.E
A.E E.E
Building Divsion, Building Divston,
Daltonganj. Building Divsion,
Daltanganj. Daltonganj.
material statement
tem of Wark Sand
aty M Brick Nos. Chips Metal Local cement Boulder
Sand filling 7.99 M$ Sand
e/F/S 104.96 7.99
|PCCt1S(1:2:4) 15.63 |7.03
3411.22 1.57
R.C.C M20/1:1.5:3) 18.31 7.88
|14.06 35161
Brick work (1:6) 33.78 15.75
11.59 5.2379
l6rnm cement plaster |13713.26 1.9253
79.25 5.79
l(1:4) 0.1427
12 mm cement
plaster(1:6) 351.55 |5.55
1.2656
250mm, wide brick 36.00
drain 0.69 2385.90 2.05 0.594
TOTAL
38.52 19510 |29.81 |2.05 9.57
12.682 o
365.46 Bags
18.273 M.T
J.E A.E
Building Divsion, Building Divsion, Building Divsion,
Daltonganj. Daltonganj.
Daltonganj.
SI.No
laster(1:3)
6|TOTAL
pDUnning sBrick
work
1.SmmandM20(1:1.5:3)
|12mm M15(1:2:4)
(1:6)4R.C.C 3/PCC2|B/F/S1/Sand
filling Iem
cement Cement
Divsion,
Building
Daltonganj. of
J.E
Work
aty
26.11
4.03 1.53 0.21 2.79 0.21
Sand
M
Metal
0.00 MLocal
Sand
0.04 0.21
1.88905580.25
cement
Building
Divsion, 0.4365187
0.2295861,
1.1751599 0.047791
Daltonganj. 2,7219824
54.439649|Bags
E.E
Boulder
KNSOR
NSTALLATION OF INDIA MARK
Particulars
LLEDTUBE WELL OF
(1S:15500 125/115 MM DIA, 60 MTRS
I|
Part-2/2004) HAND PUMP.
Qty.
WITH
Unit 2020-21
Transtruction for A. Drilling Portion
or driling in all 115/125 mm dia drilled Rate
Amount
handpump withkinds of soil rock Tube-Well
D.T.H Rig machineforallinstalation of
lincluding supplying all materials, complete
drilling, rigs, air
IItem no. well as CompresSor and labours, tools,
fuel lubricant for equipments as
121 boring etcand cost of making 125/115 mm dia
other vehicle up to sitetransporting rig machine and
and direction of work as per
Engineer-in-charge. specification
ta)Up to 30mtr. Depth
(b) Beyond 30mtr. In bellow G.L. in Rural Areas 30.0
Rural
Providing all equipments andAreas
P/M 467.50
j30.0 14025.00
labour for P/M
125mm dia blue UPVC Casing pipe as lpwering 503.80 15114.00
item no.
protecting the side from falling casing for
125 during the
of drlling all
complete job including carriageprocess
of
15.0 P/M 15.45 |231.75
material towork site.
Supplying labour cement and calcium chloride or
Item no. bentonite solution and equipments for Grouting to
Casing Pipe all complete job including
127
material to work site as per specificationcarrlage of 10 Each 172.70 172.70
&
direction of E/|
|Supplying all tools, equipments and labour and
Item no. doing washing, flushing and development of drilled
126 tube well to give clean and clear water all cormplete 0.5 Per Hr. 3925.18 1962,59
Jas per direction EN,
Supplying all materials labours and equipment
Item no.
|including 125 mm dia GI/CI cap 125 mm dia T/W
128 properly all complete and taking it out as per 1.0 Each 154.00 154.00
speciflcation &direction of E/. (the capwill be
|property of department)
Total A: |31660.04
Civil Portion
Supplying alltools, equipment, labours and
Item no. lowering 32 mm dia G.I. (Medium) pipe in DT in 3 (24
|135 Per Mtrs I8.42 442.08
mtr. Length allcomplete job as per direction of E/.
JIncluding carriage of materials.
|Supplying all tools, Labour for fitting and fixing
Item no. |deep well cylinder with necessaryconnecting rod 1.0 Each 228.69 228.69
136 jallcomplete job as per specification &direction of
E/.
|Supplying allmaterials, labours for fitting and
tem no. fixing of india Mark I Hand Pump with all Each 73.91 173.91
37
accessories all Job complete as per direction of E/I.
|Including carriage of materials.
Supplying all materials, labours and
constructing PCC (1:2:4) circular equipment for
Iitem no. each drilled tube well including platform around
4
|129 cement plaster (1:4) with neat 12mm thick
over exposed surface as per cement punning 1.0 Each
compBete. Including UNICEF design etc. all 8250.00 8250.00
carriage of materials.
Supplying all materials labour and
drain as perequipment
Item no. for
5
130 constructing
Design etc. allPCC{1:2:4) UNICEF
materials. complete .Including carriage of 3.0 Per Mtr. 491.70 |1475.10
|Add Extra Item for
Supplying tools, labours and
materials for painting,
|construction of T/Well numbering and year for
and taking of colour
Iphotograph with two or three nearest persons
6 L.S including platform, drain, soak pit and also
|longitude &latitude, details of T/W such as total 1.0 Each 500.00 |S00.00
depth, casing depth, static water level,
drawdown,
discharge,strata chart, beneficiarypopulation
in separate sheet/format all etc
direction of E/. complete as per
Total B:
C. COST OF MATERIALS 11069.78
lcost of standard 1.S.J. mark Deep Well Hand
|for india mark-ll, I.S.I. 15500 (Part 2)/ Pump
2004 with
Item no. latest revision including 12mm x3 meter long 8 no.
|107 Connecting Rods made of bright bar electro- 1 Each
galvanized fitted with coupler &normal stand 10560.00 10560.00
assembly recommended for use with cylinder
assembly suitable for bore wel casing pipe.
Cost of 32 mm dia Gl pipe (Medium) 3 Mtrs long
2 Item no.
I09 5crewed at both ends with seamless socket as per 24.0 Per mtr. 330.00 7920.00
IS:1239(Part 1990).
3 ltem no. Cost of 125 mm dia blue UPVC Casing Pipe as per
I08 1.S.12818/2016 CML no.- 5543459 15.0 Per Mtrs 571.83 8577.45
Total C: 27057.45
Total A+B+C 69787.27
Estimate of the Work :- Solar
S. Particulars Photovoltatc (SPV) Solar Submersible D.C. Water
1 2 Motor Pump
Quantit Unit |Rate
1 Designing, Supplying, Amount
with allInstallation, Testing &
4
Quotation Commissioning
5
Asper
Photovoltaic (SPV) Solartools &Parts offollowing Solar
Pump Suitable for minimumSubmersiblex D.C. Water Motor
as per MNRE 125mm 115mm bore well
accessories. Guideline with following specifications &
A SPV arrays contains
&
specification specified No of same capacity type
obtained the modules connected to series or parallel to
required vollage ¤t the power
of individual PV
peak.
modules should be minimum 200 output
watt
i) The SPV modules
61730 part 1.0)
should be as per IEC-61215 and IEC
i) Allexternal parts of
motor
pump which are in contact of pump used in submersible
water is stainless steel
Igrade 303 or highet as required.
ii) The PVmodules
should be mounted on metallic
structure of adequate strength and
which can withstand load of modulesappropriate
&High wind
design
Ipressure up to 200Km/h.
iv) The module mounting
structure should be hot dip
galvanized according to IS 4759.
v) To enhance the performance of $PV water pumping
syslem &arrangement for seasonal tilt angle
should be provided Adjustment
vi) Necessary arrangement should be provided in
controller automatic slart-run-stop through out the day
with water level detection system. (As per MNRE
|Specificalion)
vi) Necessary prolection such as lightening arrestor etc.
should be provided to protect the controller &SPV
vii) The Suction/delivery pipe shall be UPVC H.D.P.E.
pipes of appropriate size 60m or more as required
|minimum pressure rating of 8kg/Sq cm- PE 100 grade for
pump up to 3HP &10 Kg/Sq cm- PE 100 grade for 5 HP.
|ix) Allcable used shall be as per iS 694. Suitable size of
cable shall be used in sufficient length for inter
connection between the SPV array to SPV controller and
SPV controller to solar power pump. Provision of cable
shall be as per IS14536.
|x)The motor pump set should have a 5 years warranty.
xi) Control panel suitable for motor pump with
arrangement of dy run&over flow prolection sSensor,
|float switch &rain prevention box. (As per MNRE
|Specification)
xi) The SPV controller must have IP-65 proBection or
must be housed in cabinet having at least IP-65
protection.
xii) Thesystem should be as per MNRE guide line &Eco
friendly with suitable arrangement to operate new pLmp
|manually.
xiv) With third party inspection before dispatch.
xv) Fitting. fixing &
struclure,
Ixvi) Provision for
web
mounting on water tank steel
pumps to be based
instalied remole
bemust be made moritoring
controllers . It
should of
land down time of power possible
water output, the
to through the the
|days the pump wasthe pump generated byascert n theinbult
PV aArray
i daity
during the
unused under year, number Upof
or he
IThe following details
motor pump set
a) Name of the
should be breakdown
marked indellbly repai rs.
on the
|b) Model Number.
Tc Serial Number.
Manufacturer or
Distinctive LOgo.
Solar submersible
1 HP(DC Pump) motor pump (SPV DC
with 900
Panel as MNRE pump head WP
minim umType)watt
mtrs. For higher or lower Max Shut-off PV.
modules output could be head or in head up
oer latest guide line of decided on belween variousto 120
| Carying out
MNRE) prorales basis. (As
recuperationYield
discharge of constructed wellf Test for 1
Each
directed by the EC. The
ater from the test excavated
out by the
ascert a
profileinin
as g the 119000.00 119000.00
welll
level up to full depthprofile below drawing down
rise iS recorded thenormal/subsoil
normal
water
levelfsubsoil water level in the well/profile as well as
water
strainerlevel at as per design of W.S, scheme
shall be recordedpump
prior to the test including cost of all
materials, over LOad,Labours etcC, complete as directed,
Supplying all labours, tools and equipments for Each 1865.00 1865.00
dismantling of head &water
lout 32 mm diaold G.I. Pipe, tank assembly and taking
connecling rod, cylinder
assembly the disantled cornponents after necessary
changing for making the TW ingood condition with al
transportation including unused taken out materials back
|in store all complete job as per direction of EA.
(Asper Model Estimate of Solar Energy based Mini
W$$. TS done by SE,Ranchi Circle &Circle Gumla dt.
|21.05.2019) LS. 677.23 |677.23
Provision of solar night famp. 1 |L.S. 1000.00 1000.00
otal Rs. 122542.23
Say Rs. 122542.00
Sub O1
=67.=51.01kg65kg
Bnosx2.4me19. .20mx3.49kgp/m
lFor Triangular support Tube.
lBnosxo..50m=4.00mx3..49kgp/m
lcjSquare Tube
25mmx25mmx3.20mm thick.
=13.96kg
for trianqular(Wt.@1.98ka/m)
IAnosx0.65m=5.20mx1.98kapim
JFar Railing Square Tube =10.30kg
Wi@1.98kgBn)
la)Horizontal Bean
25mmx25mmx3.20mm thick.
2=8nosx2.10m=16.80mx1.98kg
OVertical Beam
/m -33.26ka
Ax4=16n0sx0.55m=8.&rnx1.98kg Im =17.424kg
MFor Ladder Square Tube
WLO1.74kgim) 25mmx25mmx2.50mm thick.
(a)Vertical Column
2nosx7m=14.00mx1.74kg m =24.36kg
(c)Sleps
|squareTube25mmx25mmx3.20thick
Wt.@1.98kg/m
22nosx0.45m=9.9mx1.98kgBm =19.60kg
M)M.S. Plate 1Omm thick
Mta)Base(@78.Plale50kgBsqm)
for column -4x1=4n0s
Top &Botom
Total=12nos
2hosx0.25Omx0.250 =0.75m
075m'UStfexner78.5plate0kg/m
at Bottom Column
=58.875kg
PPon(Size-0.225x0.075)x1Omm thick
1XAx4=1 1Ónosx0.225x0.075=0.27m
027m²x78.50kglm
)M.S, Plate Gmm thick
=21.20kg
Beam Q47.Connect
Hori10kg/
zontsaql m!Diagonal
ror &
ion 4x2=8nos
160,25x0. .06x0.006x7850=11.30kg
15x004x0.0006x7850=2.26ka
aStitener plate for Top angular
suoDort
ônosxOp0x0.060x0.006x7850-99.04kg
06x0.006x7850=3.
Plate 3mm Thick
.39kg 1008.54\p/kg 85.22 85947.78
Q15.7
70kg/sqm)
21x21x0.003x7850
Bolt16mm dia length
=103.86kg
Nut 450mm
X
16noSx1.112ka
Nut Botsof Various Sizes for fixing (W=17.t.@81.0kg112kg each)
sum)
structure(Lump
M
Total=893.01 Kg =22.00kg
Steel|
Structure for. Solor Panel
T100mmx100mmx4.8mm
3x14.60kg/m=43.80ka
80mmx4Ommx3.2mm
NOSX3.0x5.2kg /m= 31.2 ka
25mmx6 mm
l25 mmx
TONoSx1.5 x4.08kgBm=12.24 ka
T91.5mmx91.5mmx4,5mm
15mx11.88kg/m=17.82kg
Base Plate
2NOSx0.25x0.25x0.001x7850= 0.98kg
Sifner Plate
4NoSx0.15x0.15xD.001x7850=0.71kg
Nul Bolt
LS. 2kg
Total:- 115.53kg
Grand Total:- 893.01+ 115.53.75= 1008.54kg 85947.7s
a
c. lConcoaled lof land This ticularsGe
25 20 15 ioints thermal
brass Providing 2/m961(
cnecification
.ongBodxy 15mProviding ofal
mm mmmm tho
includes
jointing ComplTaetnek{bwSD hoisting arcbui
complete cOS1 threadedstability lt
nomionalnominalnominal work, and dia-{dsr peras tanks
and
cutting of
i 40) Bib and
ieacndemoldreodicing.HDPE
pcorrugation fixingand
incuding itings, ffixina
or Cock(Br fixingcapacity
item fixing
bore(188.1)
bore(18.8.2) as 18.52.1) water Analysis
bore(13.8.3) hol approved
direction
per pipesChlorinated
of
chasesand ic & brassNo-01
direcion of tank
cuting fxing old 2000.
incduding
accessories
| of stop .00 Installation
of
frtings & ewaler
thPolyvinyl pag9 design,
EA M) made
contairner
chases of cock
making supply,
Engineer pipe litres
drawing, ofout
h
and g0od wilh vitChioride of
such
delivery
oneincluding approvedCapacity of
Syntex
making in clamps low of
Charoe. the step building as
(CPVC) inlet, 2000
good
same CPVC al all density
up or
1.00CPVC quality Water to
inckuding outlet alike liters
9olvent mpipes, destination
PHED with&storage polythyler
spacing. plain one
tesingcement having overflow Capacity
& taxes,
al
quantityWater
|Total
2.00|Each Litrs
2000 Storage
8.00 14eter
5.00|Meter Meter 5.00 2\nos Unit
Tank
Rate
560.21 526.82
7.75
283.75415.35 355.85
Amount
4nox1.10mx1.1Omx1.45m=1.75m²
Total=8.76m
Providing coarse clean
including ramming and sand in filling in
with all|leads and lifs foundation trenches or in plinth 8.76
inclwaludienrigng
in layers not |I67.33 |465.81
matexceedi
as per cost of all ng 150mm thick
and| taxes all complete
EMMode of building erials and
labour
measurement compacled volume)
specificatio n dir royalontyof
ecfi
TBCD-SOR-5.1.10)
Faundation for Steel structure staging
Anosx1.1Omx1.for Solar
FOundaticn 10mx0.panel08m=0.38m3
Hnox1.2Omx1.Total=0.524m3
20mx0.1Om=0.144m3
tProviding
eand designation 75 A
one brick flat soling joints 0.524 pn
including cost of watering taxes
building specification and direction of royalty
filled with
all complete as perlocal
589,51 308.90
EA
(BCD-$OR-5.6.1)
4nosx1.10mx1.10m=4.84 m3
Foundation for Solar panel
1nox1.10mx1.1Om=1.21m
Total-6.05m 6.05
IProviding PCC M-150 in nominal mix of (1:2:4) in foundation with p |356.52 2156.95
approved quality of stone chips 20mm to Bmm s0ze graded and
coarse sand of F.M.2.5to 3 including screening shutlering nixingclean
cement concrete in mixer and placing in position vibrating sriking
curing and royalty all complete as per tbuiiding specification and
direction of El
|5.3.1.2
Foundation for Steel structure staging
|4nosx1.10mx1.10mx0.1Om=0.484 m3
Foundalion for Solar panel
1nox1.10rmx1.1Omx0.10m=0.121m'
Total=0.605m 0.605 p'm' 4598.23 2781.93
columns wilh
Providing RCC M-200 in nominal mix of (1:1.5:3) in graded
to 6mm size and clean
|approved qualily of stone chips 20mm shultering mixing
screening
|Coarse sand of F.M.2.5to 3 including position vibrating striking
vemenlconcrete in mixer and placing inbuilding specification and
|curing and royalty all.complete as per
direction of E1,
La)Foundation for Steel structure staging
J0.81 4961.73 4019.00
Footing (BCD-SOR-5.3.1.1)
Anosx0.90mx0.90:mx0.25m=0.81 J0.342 5989.72 2048.48
VerticalPedestal (BCD-SOR-5.3.2.1) p'm
4nosx0.30nx0.30mx0.995m=0.342 m'
0.284 p/m 5989.72 1701.08
ie Beam (BCD-SOR-S.3.2.1)
4nosx0..25mx0.25mx1.13Sim=0.284 m
(b)Founciatiou for Solar panel
|Footing(BCD-SOR-5.3.1.1)
Inox0. 90mx0.90mx0.25m=0.202 m
Vertical|Pedestal SOR-5.3.2.1)
|0.202 |4961.73 1002.27
|Inox0.3Omx0.30mx 1..35m=0.122m
JProviding for sleel
Of reinforcement
excluding carriage TS. bar to
as per
work site approved design and drawing
0.122 P'm |5989.72 |730.75
removal cutting,
annealed wire with cost of wire,
all
pOsition complete as per of bending
rusl placing the
with
building specification and rods in
eCD-SOR-5.5.5 direcion of EA.
Foundation for Steel structure slaging
|Footing
Anosx0.9Onx0.90mx0.25m=0.81n?
Vertical CoBumn
ldnosx0.30mx0.30mx0.95m=0.342m3
Beam
Anosx0.25mx0.25mx I.135m=0.284m?
b)Foundation for Solar panel
Fooling
Inox0.90mx0.90mx0.25m=0.202m
Vertical Column
Inox0.30mx0.30mx l.3Sim=0.I22m
Total=1.76m
130.00 kg/m3 =228.80 kg (say 200 kg)
0.11 pMT 82096.54 19391.84
8mm 80879.07 9252.57
0.11 p/MT
10 mm
4.
hen
ofWork Qty Sand
M
material statement
Sand
tMing 0.52
6.05
Brlck NoS. Chips
M
BE/S
PCC
M15(1.2:4) .61
Metal M Local Sand cerment Boulder
aCCM20{1:1.5:3) 1.74
0.27 196.63 o.52
0.75 0.54 O.09
roTAL 1.02 197 1.50 |0.136125
2.04 O.00 |0.498212
0.61
0.634337
18.280605 Bags
0.9140303 M.T
Junior
aCD, Daltonganj. Asstt. Engineer
BCD, Daltongan/. Executike' Engineer
BCD, Daltonganj.
P.H.D
Item Of Work Rate |Amount in
Qty. Unit
(in Rs.)
Ne.
Rs.
1241/Providing and fixing on wall face un
Inlasticized rigid PvC rain water pipe with
completejob () single socketed pipes
75 mm diameter 5.00|Mtr 174.69 873.45|
110mm iameter 5.00|Mtr 264.98| 1324.90
ISupplying, fitting and fixing vitreous white
1 vlazed carthen ware I.W.C. of parry
industan or any other wíth complete job
G9O mm long with 12.50 liter low level PVC
1.00 Each 3934.38| 3934.38
Cistern
Supplying, fitting and fixing vitreous white
glazed earthen ware wash band basin of
Parry or Hindustanor any other with
complete job 1.00 Each|1854.46 1854.46|
Providing &fixing Chlorinated polyvinyt
chloride (CPVC) For hot &Cold wator suppBy
188
with clamps 1.00 meter specing with complete
job 355.85 1779.25
15 mm dia Consealed 5.00 Mtr
5.00Mir 415.35 2076.75
20 mm dia Consealed
5.00 |M 283.75 1418.75
25rmn dia Exposed
-M961(XXi) Towel Rirng 1.00Each 389.93 339.93
176.60 529.80
G 100 mn dia door kee 3.00each
17,572.00
A.E
E.E
J.E
Building Divsion, Building Divsion,
Building Divsion, Daltonganj. Daltonganj
Daltonganj.
SIF of
sizes of PVCElectrical
alongwilhfollowing
the
accessories in conduit
including
same in casecuttingof the wallandsurfaceBrecess
making
1
recessed conduit as good the
required
1.21.1
20 mm PVCcoduit.
1.21.2
25 mm PVC coduit. 55,00 RM 52.00
50.00 RM
2860.00
|58.00 2900.00
|Twin control point wiring in PVC
moduiar bype
with 1.5 sq.mmswitch", Twin conduit, with
FR PVC Controt light point
conductor singlw core cable\nsulated copper
in surfacel
recessed PVC
1.4
switch, modularconduit,
plate,
2 way
modular type
suitable size G.l. box
2 etc. as required.
Power plug wiring in conduit (2x4 2.000 Point 698.00 |1396
sq.mm):- Wiring for lighPVCpower
sq.mm FR PVC insulated copperplug with 2x4
single core cable in cinducior
surfaceltecessed PVC
Conduclor single core cable for loop earhing
1.5 as required.
0.500 M
Circuit / submain Niring in PVCconduit :: 151.00 75.5
Wiring for Circuit /submain wiring along with
the followingsize PVC insulated
conductor single core cable in copper
1.7
surface/recessed PVC conductor single core
cable for loop earthing as requred.
2x1.5 sq mm+1x1.5 sq mm earth wire
|60.000 100.00 6000
2x2.5 sq mm+1x2.5 sq mm earth wire 40,000 M 119.00 4760
|JSR Elect.
M856 Page
Supplying fitting &Fixing LED Bulb 15/16 Wat|5.000 Each 172.43 862.15
48
JSR ElecL
M773 Page Each 1,536.02 1536.02
46 |Supplying fitting &Fixing Ceilling fan 1.000