TOTAL KEBUTUHAN WIREMESH PMKS PT.

BAS

p l LUASAN TOTAL LUASAN


LOKASI
(m) (m) (m2) (m2)

lantai lr, 2 layer 31.60 37.60 2376.32 2376.32


37.55 5.26 197.51
retaining wall f3 37.55 5.26 197.51 592.80
37.60 5.26 197.78
21.40 8.00 171.20
8.20 8.00 65.60
retaining wall 686.80
60.00 7.50 225.00
60.00 7.50 225.00
gerbang ketanjaakan Lr 110.32 20.00 4412.80
15.00 35.00 525.00
12.80 8.00 204.80
kearah loading shed 76.00 15.00 2280.00
internal road t=0,2; 2 layer 10071.45
9.58 18.93 362.59
6.67 18.93 126.26
tanjakan LR 60.00 8.00 960.00
depan gerbang +30mx20m 30.00 20.00 1200.00
samping CM 137.58 5.00 687.89
samping workshp 70.49 5.00 352.44
workshop ke kcp 179.09 5.00 895.47
samping waduk 93.40 5.00 466.98
samping cangkang 56.73 4.00 226.92
kcp ke bunker silo 31.15 4.00 124.58
43.07 3.00 129.21
kalsium ke heavy phase
11.43 3.00 34.30
59.14 5.00 295.72
22.58 5.00 112.88
internal road t=0,15 wtp ketanki solar 4460.16
4.50 3.50 15.75
3.50 3.00 5.25
blkang LR 107.84 4.00 431.35
bak sampah ke condensate 37.93 3.00 113.79
office ke cm 115.23 3.00 345.68
depan office 22.20 3.00 66.60
bicycle shed 18.96 3.00 56.87
Rounding 2m 4 unit 2.00 2.00 8.00
Rounding 3m 9 unit 3.00 3.00 40.50
Rounding 5m 4 unit 5.00 5.00 50.00
sterilizer 12.00 44.00 528.00
selazar 85.00 2.50 212.50
EFB 14.00 12.00 168.00
selazar 28.50 2.50 71.25
presing thresing,kernel, deperiarper 60.00 18.00 1080.00
selazar 78.00 2.50 195.00
lantai mill clari, kernel 14.00 30.00 420.00 4203.50
selazar 60.50 2.50 151.25
power house 14.00 18.00 252.00
selazar 28.00 2.50 70.00
boiler 36.00 18.00 648.00
selazar 95.00 2.50 237.50
CSH 20.00 8.50 170.00
cangkang & cucian loader 17.30 33.00 570.90 570.90
fiber area 10.00 10.00 200.00 200.00
jalan akses loader 6.00 4.50 27.00
bak abu 34.92
selazar 13.20 0.60 7.92
total tanpa pondasi tanki 60.00 24.00 1440.00
tanki 1500 2 unit 18.34 2.00 -528.08
lantai tanki 752.45
tanki 500 11.50 1.00 -103.82
tanki 150 8.42 1.00 -55.65
lantai 26.00 14.00 364.00
workshop 589.00
selazar 90.00 2.50 225.00
lantai 37.50 16.00 600.00
kcp & Cake store 892.50
selazar 117.00 2.50 292.50
6.90 3.70 51.06
lantai 5.80 4.20 48.72
3.10 3.60 22.32
heavy phase 2 layer dinding t=0,3 2layer 35.30 3.50 247.10 433.87
dinding t=0,2 2layer 17.70 1.33 46.91
2.10 3.20 13.44
rubbish pit
0.60 7.20 4.32
lantai t=0,375 2 layer 6.05 4.93 59.59
lantai pompa t=0,2; 2 layer 2.00 3.50 14.00
dinding 2 layer T=2,9 2 layer 2.90 19.70 114.26
dinding rumah pompa 2 layer 7.10 1.13 15.98
condensate pit 2 layer 250.29
blowdown lantai 2 layer 3.00 3.00 18.00
blowdown dinding 9.00 0.70 6.30
3.45 2.60 17.94
rubbish pit
8.45 0.50 4.23
isi 1 pipa 46.42 1.66 77.06
isi 2 pipa 5.00 2.06 10.30
piping sterilizer 109.24
isi 3 pipa 2.50 2.46 6.15
isi 4 pipa 5.50 2.86 15.73
lantai 2.00 2.00 16.00
bak sampah 4 unit 80.00
dinding 8.00 2.00 64.00
type D2 144.39 1.85 267.13
type D2A 76.65 1.85 141.80
internal drainage type E 103.12 2.65 273.27 925.49
type F 30.00 3.35 100.50
type G 49.58 2.88 142.79
lantai 6.48 3.24 41.99
bak ipal 3 lobang 2 unit 159.30
dinding 24.96 2.35 117.31
lantai 6.48 4.26 27.60
bak ipal 5 lobang 1 unit dinding 34.76 2.20 76.47 131.68
tutup bak ipal 6.48 4.26 27.60
lantai bicycle shed 3.00 10.00 30.00 30.00
lantai 2.00 2.00 4.00
washing pit 20.00
dinding 8.00 2.00 16.00
plat beton parit perumahan 8.00 0.70 5.60 5.60
tanki solar 2 layers lantai 5.20 6.50 67.60 67.60
tangga lr 2 unit luasan dari boq progress 633.6 kg 199.63 199.63
lantai 2.68 5.58 14.94
bak recycling boiler 38.42
dinding 16.51 1.42 23.48
tanjakan timbangan 2layer x 4 unit 5.67 3.00 136.18 136.18
5.20 2.70 28.08
atap boiler control room + tumpuan 24.55
2.40 1.47 -3.53
5.60 4.60 51.52
atap assisstant room + tumpuan + janggutan 45.52
3.00 2.00 -6.00
saluran terbuka Boq 586.50 586.50
sludge pit cooling pond 1 ke2 Boq 60.20 60.20
discharge out Boq 58.57 58.57
kolam 1 ke kolam 2 44.00 2.00 88.00
kolam 2 ke kolam 3 61.00 2.00 122.00
kolam 3 ke kolam 4 32.00 2.00 64.00
overflow limbah kolam 4 ke kolam 5 74.00 2.00 148.00 2262.54
kolam 5 ke kolam 6 266.65 2.00 533.29
kolam 6 ke kolam 7 113.63 2.00 227.25
kolam 7 ke kolam 8 Boq 1080.00
TOTAL LUASAN 31055.99 31055.99

Pinang Raya, 06 April 2022


Dibuat Oleh: Diketahui Oleh:

Azmi Arief Harianto


Supervisor Kepala Proyek

You might also like