NO URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA HARGA SATUAN JUMLAH HARGA KETERANGAN
(Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (%)
II.5 PEKERJAAN STASIUN
VIII.5 PEKERJAAN MEKANIKAL ELEKTRIKAL PLUMBING
VIII.5.3 PEKERJAAN ELEKTRIKAL Lot 1.00 1,530,856,750.00 1,530,856,750.00 1,484,931,047.50 1,484,931,047.50 45,925,702.50 3.00
VIII.5.4 PEKERJAAN PEMADAM KEBAKARAN Lot 1.00 27,485,600.00 27,485,600.00 26,661,032.00 26,661,032.00 824,568.00 3.00
VIII.4.5 PEKERJAAN ELEKTRONIK Lot 1.00 1,071,157,455.00 1,071,157,455.00 1,039,022,731.35 1,039,022,731.35 32,134,723.65 3.00
VIII.5.6 PEKERJAAN PLUMBING Lot 1.00 511,505,970.00 511,505,970.00 496,160,790.90 496,160,790.90 15,345,179.10 3.00
VIII.5.7 PEKERJAAN TATA UDARA Lot 1.00 316,576,461.01 316,576,461.01 307,079,167.18 307,079,167.18 9,497,293.83 3.00
Catatan :
- Metode Pembayaran SCF 180 hari
- Include PPH dan Beban Disconto Bank
- Include PPN 11%
- Include Perizinan IPAL
- include perizinan SLO Tegangan Rendah.
Demikian berita acara pembuktian/klarifikasi negosiasi ini, untuk digunakan sebagai dasar usulan persetujuan penunjukan.
Jakarta, 22 Juli 2022
Tim Evaluasi Harga Tanda Tangan
3. Ahmad Ferdi
4. Syahrul Kawas
1 PANEL TR
a Panel PUTR 197 Kva Set 1.00 145,000,000.00 145,000,000.00 140,650,000.00 140,650,000.00
b Kabel Daya
3 MCB BOX
PUTR
- Dari Panel PUTR
ke GENSET
Kabel NA2XY 4(1cx240 mm2) m 25.00 435,000.00 10,875,000.00 421,950.00 10,548,750.00
- Kabel PP-Esc ke :
PC-Esc-01 m 45.00 201,500.00 9,067,500.00 195,455.00 8,795,475.00
NYY 4x10 mm2 + NYA 10 mm2
- Kabel PP-Esc ke :
PC-Esc-02 m 68.00 201,500.00 13,702,000.00 195,455.00 13,290,940.00
NYY 4x10 mm2 + NYA 10 mm2
PD-LT 1
- Kabel PD-LT1 ke :
IU-1/PPAK.01 m 150.00 32,800.00 4,920,000.00 31,816.00 4,772,400.00
NYM 3x2,5 mm2 In Conduit
- Kabel PD-LT1 ke :
IU-1/PPAK.02 m 148.00 32,800.00 4,854,400.00 31,816.00 4,708,768.00
NYM 3x2,5 mm2 In Conduit
- Kabel PD-LT1 ke :
IU-1/PAP.01 m 143.00 32,800.00 4,690,400.00 31,816.00 4,549,688.00
NYM 3x2,5 mm2 In Conduit
- Kabel PD-LT1 ke :
EAF-1/TO.01A m 3.00 32,800.00 98,400.00 31,816.00 95,448.00
NYM 3x2,5 mm2 In Conduit
PD- POMPA
- Kabel PD-POMPA ke :
HARGA SATUAN JUMLAH HARGA HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN SATUAN VOLUME KETERANGAN
(Rp.) (Rp.) (Rp.) (Rp.)
PC-STP BIOTEK 1 m 100.00 32,800.00 3,280,000.00 31,816.00 3,181,600.00
NYM 3x2,5 mm2 In Conduit
- Kabel PD-POMPA ke :
PC-STP BIOTEK 2 m 150.00 32,800.00 4,920,000.00 31,816.00 4,772,400.00
NYM 3x2,5 mm2 In Conduit
PP-LT 2
- Kabel PP-LT-02 ke :
IU-2/FA.01 m 80.00 32,800.00 2,624,000.00 31,816.00 2,545,280.00
NYM 3x2,5 mm2 In Conduit
- Kabel PP-LT-02 ke :
IU-2/RM.01 m 50.00 32,800.00 1,640,000.00 31,816.00 1,590,800.00
NYM 3x2,5 mm2 In Conduit
- Kabel PP-LT-02 ke :
IU-2/PK.01 m 55.00 32,800.00 1,804,000.00 31,816.00 1,749,880.00
NYM 3x2,5 mm2 In Conduit
- Kabel PP-LT-02 ke :
IU-2/KS m 21.00 32,800.00 688,800.00 31,816.00 668,136.00
NYM 3x2,5 mm2 In Conduit
- Kabel PP-LT-02 ke :
IU-2/RBDH.01 m 21.00 32,800.00 688,800.00 31,816.00 668,136.00
NYM 3x2,5 mm2 In Conduit
- Kabel PP-LT-02 ke :
IU-2/RP.01 m 23.00 32,800.00 754,400.00 31,816.00 731,768.00
NYM 3x2,5 mm2 In Conduit
- Kabel PP-LT-02 ke :
IU-2/RPK.01 m 20.00 32,800.00 656,000.00 31,816.00 636,320.00
NYM 3x2,5 mm2 In Conduit
- Kabel PP-LT-02 ke :
IU-2/PG.01 m 10.00 32,800.00 328,000.00 31,816.00 318,160.00
NYM 3x2,5 mm2 In Conduit
- Kabel PP-LT-02 ke :
IU-2/SG.01 m 10.00 32,800.00 328,000.00 31,816.00 318,160.00
NYM 3x2,5 mm2 In Conduit
- Kabel PP-LT-02 ke :
IU-2/L&F.01 m 20.00 32,800.00 656,000.00 31,816.00 636,320.00
NYM 3x2,5 mm2 In Conduit
- Kabel PP-LT-02 ke :
IU-3/LM.01 m 40.00 32,800.00 1,312,000.00 31,816.00 1,272,640.00
NYM 3x2,5 mm2 In Conduit
HARGA SATUAN JUMLAH HARGA HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN SATUAN VOLUME KETERANGAN
(Rp.) (Rp.) (Rp.) (Rp.)
- Kabel PP-LT-02 ke :
EAF-2.TO.01 m 20.00 32,800.00 656,000.00 31,816.00 636,320.00
NYM 3x2,5 mm2 In Conduit
- Kabel PP-AC-02 ke :
EAF-MZ.TO.01 m 2.00 32,800.00 65,600.00 31,816.00 63,632.00
NYM 3x2,5 mm2 In Conduit
PP KIOS
- Kabel PP-Kios ke :
MB-Kios.01 m 60.00 71,400.00 4,284,000.00 69,258.00 4,155,480.00
NYM 4x4 mm2
- Kabel PP-Kios ke :
MB-Kios.02 m 55.00 74,000.00 4,070,000.00 71,780.00 3,947,900.00
NYM 3x6 mm2 In Conduit
- Kabel PP-Kios ke :
MB-Kios.03 m 50.00 53,000.00 2,650,000.00 51,410.00 2,570,500.00
NYM 3x4 mm2 In Conduit
- Kabel PP-Kios ke :
MB-Kios.04 m 40.00 74,000.00 2,960,000.00 71,780.00 2,871,200.00
NYM 3x6 mm2 In Conduit
- Kabel PP-Kios ke :
MB-Kios.05 m 57.00 162,000.00 9,234,000.00 157,140.00 8,956,980.00
NYM 4x10 mm2 In Conduit
- Kabel PP-Kios ke :
MB-Kios.06 m 122.00 53,000.00 6,466,000.00 51,410.00 6,272,020.00
NYM 3x4 mm2 In Conduit
- Kabel PP-Kios ke :
STK G.7 m 116.00 53,000.00 6,148,000.00 51,410.00 5,963,560.00
NYM 3x4 mm2 In Conduit
- Kabel PP-Kios ke :
STK G.8 m 110.00 53,000.00 5,830,000.00 51,410.00 5,655,100.00
NYM 3x4 mm2 In Conduit
- Kabel PP-Kios ke :
STK G.9 m 108.00 53,000.00 5,724,000.00 51,410.00 5,552,280.00
NYM 3x4 mm2 In Conduit
- Kabel PP-Kios ke :
STK G.10 m 122.00 53,000.00 6,466,000.00 51,410.00 6,272,020.00
NYM 3x4 mm2 In Conduit
- Kabel PP-Kios ke :
HARGA SATUAN JUMLAH HARGA HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN SATUAN VOLUME KETERANGAN
(Rp.) (Rp.) (Rp.) (Rp.)
STK G.11 m 118.00 53,000.00 6,254,000.00 51,410.00 6,066,380.00
NYM 3x4 mm2 In Conduit
- Kabel PP-Kios ke :
STK G.12 m 112.00 53,000.00 5,936,000.00 51,410.00 5,757,920.00
NYM 3x4 mm2 In Conduit
- Kabel PP-Kios ke :
STK G.13 m 106.00 53,000.00 5,618,000.00 51,410.00 5,449,460.00
NYM 3x4 mm2 In Conduit
- Kabel PP-Kios ke :
STK G.14 m 100.00 53,000.00 5,300,000.00 51,410.00 5,141,000.00
NYM 3x4 mm2 In Conduit
- Kabel PP-Kios ke :
STK G.15 m 131.00 53,000.00 6,943,000.00 51,410.00 6,734,710.00
NYM 3x4 mm2 In Conduit
- Kabel PP-Kios ke :
STK G.16 m 125.00 53,000.00 6,625,000.00 51,410.00 6,426,250.00
NYM 3x4 mm2 In Conduit
- Kabel PP-Kios ke :
STK G.17 m 119.00 53,000.00 6,307,000.00 51,410.00 6,117,790.00
NYM 3x4 mm2 In Conduit
- Kabel PP-Kios ke :
STK G.18 m 113.00 53,000.00 5,989,000.00 51,410.00 5,809,330.00
NYM 3x4 mm2 In Conduit
PP-ATAP
- Kabel PP-Atap ke :
IU-OU/RML (Prov) m 45.00 48,750.00 2,193,750.00 47,287.50 2,127,937.50
NYY 4x2,5 mm2 + NYA 2,5 mm2
- Kabel PP-Atap ke :
IU-OU/RML (Prov) m 40.00 48,750.00 1,950,000.00 47,287.50 1,891,500.00
NYY 4x2,5 mm2 + NYA 2,5 mm2
- Kabel PP-Atap ke :
PC-LP (Prov) m 45.00 106,000.00 4,770,000.00 102,820.00 4,626,900.00
NYY 4x6 mm2 + NYA 2,5 mm2
- Kabel PP-Atap ke :
PC-LP (Prov) m 40.00 106,000.00 4,240,000.00 102,820.00 4,112,800.00
NYY 4x6 mm2 + NYA 2,5 mm2
- LANTAI 1
Lampu TL LED 28 W bh 70.00 275,000.00 19,250,000.00 266,750.00 18,672,500.00
Lampu TL LED 28 W + Battery Nicad bh 25.00 975,000.00 24,375,000.00 945,750.00 23,643,750.00
Lampu DL LED 12 W bh 5.00 205,000.00 1,025,000.00 198,850.00 994,250.00
Lampu DL LED 12 W + Battery Nicad bh 2.00 925,000.00 1,850,000.00 897,250.00 1,794,500.00
Lampu DL LED 9 W bh 1.00 178,000.00 178,000.00 172,660.00 172,660.00
Stop Kontak 200 W bh 5.00 150,000.00 750,000.00 145,500.00 727,500.00
Stop Kontak AC bh 3.00 145,000.00 435,000.00 140,650.00 421,950.00
Saklar Tunggal bh 4.00 63,000.00 252,000.00 61,110.00 244,440.00
- LANTAI 2
Lampu Lowbay LED 100 W bh 34.00 2,475,000.00 84,150,000.00 2,400,750.00 81,625,500.00
Lampu DL LED 12 W bh 30.00 275,000.00 8,250,000.00 266,750.00 8,002,500.00
Lampu DL LED 12 W + Battery Nicad bh 16.00 925,000.00 14,800,000.00 897,250.00 14,356,000.00
Stop Kontak 200 W bh 42.00 150,000.00 6,300,000.00 145,500.00 6,111,000.00
Stop Kontak Lantai 200 W c/w socket bh 4.00 750,000.00 3,000,000.00 727,500.00 2,910,000.00
Stop Kontak AC bh 15.00 145,000.00 2,175,000.00 140,650.00 2,109,750.00
saklar tunggal bh 17.00 63,000.00 1,071,000.00 61,110.00 1,038,870.00
saklar Seri bh 6.00 63,000.00 378,000.00 61,110.00 366,660.00
- LANTAI 1
NYM 3 x 2,5 mm dalam HI PVC conduit dia. 20 mm untuk penerangan titik 76.00 335,000.00 25,460,000.00 324,950.00 24,696,200.00
NYM 4 x 2,5 mm dalam HI PVC conduit dia. 20 mm untuk penerangan titik 27.00 365,000.00 9,855,000.00 354,050.00 9,559,350.00
NYM 3 x 2,5 mm dalam HI PVC conduit dia. 20 mm untuk stop kontak titik 5.00 365,000.00 1,825,000.00 354,050.00 1,770,250.00
- LANTAI 2
NYM 3 x 2,5 mm dalam HI PVC conduit dia. 20 mm untuk penerangan titik 64.00 335,000.00 21,440,000.00 324,950.00 20,796,800.00
NYM 4 x 2,5 mm dalam HI PVC conduit dia. 20 mm untuk penerangan titik 16.00 365,000.00 5,840,000.00 354,050.00 5,664,800.00
NYM 3 x 2,5 mm dalam HI PVC conduit dia. 20 mm untuk stop kontak titik 46.00 365,000.00 16,790,000.00 354,050.00 16,286,300.00
- Grounding Terminal Box (CU bar 400 x 40 x 5 mm) set 4.00 1,400,000.00 5,600,000.00 1,358,000.00 5,432,000.00
9 KAWAT PENTANAHAN
- Dari body PD
ke GTB
BC 35 mm2 m 4.00 78,000.00 312,000.00 75,660.00 302,640.00
10 RAK KABEL
Pekerjaan kabel tray sudah lengkap dengan joint, Tee, T-way dan accesories lainya
Lantai 1
Kabel Tray 200 x 100 mm m 287.00 460,000.00 132,020,000.00 446,200.00 128,059,400.00
Kabel Tray 100 x 50 mm m 59.00 355,000.00 20,945,000.00 344,350.00 20,316,650.00
Lantai 2
Kabel Tray 200 x 100 mm m 143.00 460,000.00 65,780,000.00 446,200.00 63,806,600.00
Power House
Kabel Ladder 500 x 100 mm m 40.00 645,000.00 25,800,000.00 625,650.00 25,026,000.00 include dengan aksesoris
a Lantai 1
Portable Fire Extinguisher 5 Kg (C02) bh 1.00 2,706,400.00 2,706,400.00 2,625,208.00 2,625,208.00
Portable Fire Extinguisher 3 Kg (Dry Powder) bh 16.00 919,700.00 14,715,200.00 892,109.00 14,273,744.00
b Lantai 2
HARGA SATUAN JUMLAH HARGA HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN SATUAN VOLUME KETERANGAN
(Rp.) (Rp.) (Rp.) (Rp.)
Portable Fire Extinguisher bh 1.00 2,706,400.00 2,706,400.00 2,625,208.00 2,625,208.00
Portable Fire Extinguisher 3 Kg (Dry Powder) bh 8.00 919,700.00 7,357,600.00 892,109.00 7,136,872.00
1 PERALATAN UTAMA
- Main MCP-FA Semi Addressable 1 Loops, Max. 127 Address Set 1.00 69,440,000.00 69,440,000.00 67,356,800.00 67,356,800.00
- MDFA Unit 1.00 7,770,000.00 7,770,000.00 7,536,900.00 7,536,900.00
- Color Graphic Monitor Unit 1.00 35,980,000.00 35,980,000.00 34,900,600.00 34,900,600.00
- Printer Report Slip Unit 1.00 3,815,000.00 3,815,000.00 3,700,550.00 3,700,550.00
- Surge Arrester 15 KA bh 1.00 1,057,050.00 1,057,050.00 1,025,338.50 1,025,338.50
- Master Intercom bh 1.00 22,765,000.00 22,765,000.00 22,082,050.00 22,082,050.00
- UPS 1 KVA terdiri dari Rectifier, Inverter dan Battery VRLA Rechargeable 4 Hours. Set 1.00 7,796,650.00 7,796,650.00 7,562,750.50 7,562,750.50
- Kabel FRC 2 x 2,5 mm2 dalam PVC HI Conduit dia. 20 mm m 113.00 117,750.00 13,305,750.00 114,217.50 12,906,577.50
- Kabel FRC STP 16 AWG, 1 Pair m 113.00 133,450.00 15,079,850.00 129,446.50 14,627,454.50
6 DETECTOR FIXTURE
1 Lantai 1
- Rate Of Rise Heat Detector bh 40.00 282,750.00 11,310,000.00 274,267.50 10,970,700.00
- Photoelectric Smoke Detector bh 3.00 311,750.00 935,250.00 302,397.50 907,192.50
- End Of Line lot 3.00 1,704,402.50 5,113,207.50 1,653,270.43 4,959,811.28 include
HARGA SATUAN JUMLAH HARGA HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN SATUAN VOLUME KETERANGAN
(Rp.) (Rp.) (Rp.) (Rp.)
Instalasi
- Rate Of Rise Heat Detector NYA 2x1cx1,5 mm2 in Conduit titik 40.00 675,000.00 27,000,000.00 654,750.00 26,190,000.00
- Photoelectric Smoke Detector NYA 2x1cx1,5 mm2 in Conduit titik 3.00 675,000.00 2,025,000.00 654,750.00 1,964,250.00
2 Lantai 2
- Rate Of Rise Heat Detector bh 32.00 282,750.00 9,048,000.00 274,267.50 8,776,560.00
- Photoelectric Smoke Detector bh 26.00 311,750.00 8,105,500.00 302,397.50 7,862,335.00
- End Of Line lot 3.00 1,704,402.50 5,113,207.50 1,653,270.43 4,959,811.28 include
Instalasi
- Rate Of Rise Heat Detector NYA 2x1cx1,5 mm2 in Conduit titik 32.00 675,000.00 21,600,000.00 654,750.00 20,952,000.00
- Photoelectric Smoke Detector NYA 2x1cx1,5 mm2 in Conduit titik 26.00 675,000.00 17,550,000.00 654,750.00 17,023,500.00
1 PERALATAN UTAMA
3 KABEL FEEDER
Lantai 2
- Ceiling Speaker bh 24.00 332,500.00 7,980,000.00 322,525.00 7,740,600.00
HARGA SATUAN JUMLAH HARGA HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN SATUAN VOLUME KETERANGAN
(Rp.) (Rp.) (Rp.) (Rp.)
- Wall Speaker bh 8.00 681,000.00 5,448,000.00 660,570.00 5,284,560.00
- Coulom Speaker bh 7.00 1,262,950.00 8,840,650.00 1,225,061.50 8,575,430.50
Lantai 1
- Horn Speaker titik 16.00 595,000.00 9,520,000.00 577,150.00 9,234,400.00
- Ceiling Speaker titik 3.00 332,500.00 997,500.00 322,525.00 967,575.00
Lantai 2
- Ceiling Speaker titik 24.00 332,500.00 7,980,000.00 322,525.00 7,740,600.00
- Wall Speaker titik 8.00 681,380.00 5,451,040.00 660,938.60 5,287,508.80
- Coulom Speaker titik 7.00 1,169,000.00 8,183,000.00 1,133,930.00 7,937,510.00
C SISTEM TELEPHONE
1 PERALATAN UTAMA
2 JUNCTION BOX
3 KABEL FEEDER
- Kabel ITC 2 x 2 x 0,6 mm2 dalam PVC HI Conduit dia. 20 mm ( Provosional ) m 109.00 34,300.00 3,738,700.00 33,271.00 3,626,539.00
4 PERALATAN TELEPHONE
- Kabel ITC 2 x 2 x 0,6 mm2 dalam PVC HI Conduit dia. 20 mm titik 11.00 490,000.00 5,390,000.00 475,300.00 5,228,300.00
D SISTEM CCTV
1 PERALATAN UTAMA
2 CCTV KAMERA
Lanatai 1
- CCTV Dome Camera Colour Fixed w/ Varifocal Lens bh 2.00 1,094,750.00 2,189,500.00 1,061,907.50 2,123,815.00
- CCTV Camera Colour Fixed w/ Varifocal Lens bh 6.00 1,094,750.00 6,568,500.00 1,061,907.50 6,371,445.00
Lantai 2
- CCTV Dome Camera Colour Fixed w/ Varifocal Lens bh 6.00 1,094,750.00 6,568,500.00 1,061,907.50 6,371,445.00
Lantai 2
- Coaxial Cable RG-6 dalam PVC Conduit dia. 20 mm m 900.00 49,700.00 44,730,000.00 48,209.00 43,388,100.00
- Kabel NYM 3 x 2,5 mm2 dalam PVC Conduit diameter 20 mm ttk 14.00 910,000.00 12,740,000.00 882,700.00 12,357,800.00
E TRAY
Lantai 1
- Kabel Tray 200 x 100 mm m 275.00 665,000.00 182,875,000.00 645,050.00 177,388,750.00
- Lantai 2
- Kabel Tray 200 x 100 mm m 150.00 665,000.00 99,750,000.00 645,050.00 96,757,500.00
F CATU DAYA
G PENTANAHAN / GROUNDING
- Grounding Pit Box Fire Alarm, Tata Suara, Telephone, CCTV set 1.00 28,000,000.00 28,000,000.00 27,160,000.00 27,160,000.00
- Test Box Terminal Bar Fire Alarm, Tata Suara, Telephone, CCTV bh 1.00 35,000,000.00 35,000,000.00 33,950,000.00 33,950,000.00
3 KAWAT PENTANAHAN
c SISTEM MATV
d SISTEM TELEPHONE
e SISTEM CCTV
a PERALATAN UTAMA
HARGA SATUAN JUMLAH HARGA HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN SATUAN VOLUME KETERANGAN
(Rp.) (Rp.) (Rp.) (Rp.)
KATUP-KATUP
Gate Valve diameter 50 mm 10 K (Provisional) bh 1.00 2,890,300.00 2,890,300.00 2,803,591.00 2,803,591.00
Quantity Meter c/w Lockable Valve diameter 20 mm 10 K bh 5.00 3,280,375.00 16,401,875.00 3,181,963.75 15,909,818.75
Quantity Meter c/w Lockable Valve diameter 50 mm 10 K bh 1.00 20,391,000.00 20,391,000.00 19,779,270.00 19,779,270.00
PRV set set 1.00 21,603,750.00 21,603,750.00 20,955,637.50 20,955,637.50
2 Lantai 1
KATUP-KATUP
- Gate Valve diameter 25 mm 10 K (Provisional) bh 2.00 790,000.00 1,580,000.00 766,300.00 1,532,600.00
2 Lantai 2
KATUP-KATUP
- Gate Valve diameter 32 mm 10 K (Provisional) bh 2.00 1,450,000.00 2,900,000.00 1,406,500.00 2,813,000.00
- Gate Valve diameter 25 mm 10 K (Provisional) bh 2.00 790,000.00 1,580,000.00 766,300.00 1,532,600.00
- Gate Valve diameter 20 mm 10 K (Provisional) bh 1.00 675,000.00 675,000.00 654,750.00 654,750.00
b LANTAI 1
HARGA SATUAN JUMLAH HARGA HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN SATUAN VOLUME KETERANGAN
(Rp.) (Rp.) (Rp.) (Rp.)
c LANTAI 2
d PIPA RISER
b LANTAI 1
c LANTAI 2
d PIPA RISER
a LANTAI 2
c PIPA RISER
b LANTAI 1
b LANTAI ATAP
c PIPA RISER
1 LANTAI 1
2 LANTAI 2
a EF-2.RP.01
Type : Wall Mounted unit 1.00 1,890,000.00 1,890,000.00 1,833,300.00 1,833,300.00
Fan Function : Exhaust
Cap. : 200 CFM
Static Pressure : 0,1 In WG
Data Elektrikal : 0,06 kW/ 220V
Lokasi : R.Panel
b EF-2.RG.01
Type : Wall Mounted unit 1.00 1,890,000.00 1,890,000.00 1,833,300.00 1,833,300.00
Fan Function : Exhaust
Cap. : 200 CFM
Static Pressure : 0,1 In WG
Data Elektrikal : 0,06 kW/ 220V
Lokasi : R.Genset
b EAF-2.TO.01
Type : Axial ADJ Pitch unit 1.00 12,775,000.00 12,775,000.00 12,391,750.00 12,391,750.00
Fan Function : Exhaust
Cap. : 2000 CFM
Static Pressure : 0,2 In WG
Data Elektrikal : 0,37 kW/ 220V
Lokasi : Toilet Pria & Wanita
LANTAI 2
EAF-2.TO.01
Exhaust Air Duct, BJLS Tanpa Isolasi
BJLS 600x300 m2 1.50 880,522.50 1,320,783.75 854,106.83 1,281,160.24
BJLS 550 x 250 m2 3.00 880,522.50 2,641,567.50 854,106.83 2,562,320.48
BJLS 350 x 200 m2 1.00 880,522.50 880,522.50 854,106.83 854,106.83
BJLS 200 x 200 m2 5.20 880,522.50 4,578,717.00 854,106.83 4,441,355.49
BJLS 150 x 150 m2 15.00 880,522.50 13,207,837.50 854,106.83 12,811,602.38
Aksesoris
EAG @100 CFM : 200 x 200 mm bh 14.00 153,900.00 2,154,600.00 149,283.00 2,089,962.00
EAL : 650 x 250 mm bh 1.00 1,338,193.40 1,338,193.40 1,298,047.60 1,298,047.60
Volume damper set 1.00 2,120,688.00 2,120,688.00 2,057,067.36 2,057,067.36
3 PEKERJAAN PERALATAN AC
HARGA SATUAN JUMLAH HARGA HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN SATUAN VOLUME KETERANGAN
(Rp.) (Rp.) (Rp.) (Rp.)
A LANTAI 1
1 OU/IU-1.PPAK.01 & 02
Type : Split Wall Unit 2.00 12,800,000.00 25,600,000.00 12,416,000.00 24,832,000.00
Total Capacity : 9.000 btuh
Air Flow : none
Static Pressure : -
Level Suara : 47 dB
Data Elektrikal : none
Lokasi : R.PPAK
B LANTAI 2
4. PEKERJAAN INSTALASI AC
A LANTAI 1
1 OU/IU-1.PPAK.01 & 02
Instalasi pipa refrigerant 1/4" + 3/8" m 20.00 306,000.00 6,120,000.00 296,820.00 5,936,400.00
Pipa drain AC 20 mm m 12.00 27,000.00 324,000.00 26,190.00 314,280.00
2 OU/IU-1.PAP.01
Instalasi pipa refrigerant 1/4" + 3/8" m 8.00 306,000.00 2,448,000.00 296,820.00 2,374,560.00
Pipa drain AC 20 mm m 6.00 27,000.00 162,000.00 26,190.00 157,140.00
B LANTAI 2
HARGA SATUAN JUMLAH HARGA HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN SATUAN VOLUME KETERANGAN
(Rp.) (Rp.) (Rp.) (Rp.)
1 OU/IU-2.FA.01
Instalasi pipa refrigerant 1/4 + 3/8 c/w Isolasi m 13.00 306,000.00 3,978,000.00 296,820.00 3,858,660.00
Pipa drain AC 20 mm m 15.00 27,000.00 405,000.00 26,190.00 392,850.00
2 OU/IU-2.RM.01
Instalasi pipa refrigerant 1/4 + 3/8 c/w Isolasi m 16.00 306,000.00 4,896,000.00 296,820.00 4,749,120.00
Pipa drain AC 20 mm m 12.00 27,000.00 324,000.00 26,190.00 314,280.00
3 OU/IU-2.PK.01
Instalasi pipa refrigerant 1/4 + 3/8 c/w Isolasi m 14.00 306,000.00 4,284,000.00 296,820.00 4,155,480.00
Pipa drain AC 20 mm m 10.00 27,000.00 270,000.00 26,190.00 261,900.00
4 OU/IU-2.KS.01
Instalasi pipa refrigerant 1/4 + 3/8 c/w Isolasi m 12.00 306,000.00 3,672,000.00 296,820.00 3,561,840.00
Pipa drain AC 20 mm m 12.00 27,000.00 324,000.00 26,190.00 314,280.00
5 OU/IU-2.WKS.01
Instalasi pipa refrigerant 1/4 + 3/8 c/w Isolasi m 12.00 306,000.00 3,672,000.00 296,820.00 3,561,840.00
Pipa drain AC 20 mm c/w isolasi m 12.00 27,000.00 324,000.00 26,190.00 314,280.00
6 OU/IU-2.RS.01
Instalasi pipa refrigerant 1/4 + 3/8 c/w Isolasi m 12.00 306,000.00 3,672,000.00 296,820.00 3,561,840.00
Pipa drain AC 20 mm c/w isolasi m 12.00 27,000.00 324,000.00 26,190.00 314,280.00
7 OU/IU-2.RBDH.01
Instalasi pipa refrigerant 1/4 + 3/8 c/w Isolasi m 14.00 306,000.00 4,284,000.00 296,820.00 4,155,480.00
Pipa drain AC 20 mm c/w isolasi m 13.00 27,000.00 351,000.00 26,190.00 340,470.00
8 OU/IU-2.RP.01
Instalasi pipa refrigerant 1/4 + 3/8 c/w Isolasi m 12.00 306,000.00 3,672,000.00 296,820.00 3,561,840.00
Pipa drain AC 20 mm c/w isolasi m 10.00 27,000.00 270,000.00 26,190.00 261,900.00
9 OU/IU-2.RPK.01
Instalasi pipa refrigerant 1/4 + 3/8 c/w Isolasi m 12.00 306,000.00 3,672,000.00 296,820.00 3,561,840.00
Pipa drain AC 20 mm c/w isolasi m 12.00 27,000.00 324,000.00 26,190.00 314,280.00
10 OU/IU-2.PG.01
Instalasi pipa refrigerant 1/4 + 3/8 c/w Isolasi m 12.00 306,000.00 3,672,000.00 296,820.00 3,561,840.00
Pipa drain AC 20 mm c/w isolasi m 13.00 27,000.00 351,000.00 26,190.00 340,470.00
11 OU/IU-2.SG.01
Instalasi pipa refrigerant 1/4 + 3/8 c/w Isolasi m 12.00 306,000.00 3,672,000.00 296,820.00 3,561,840.00
Pipa drain AC 20 mm c/w isolasi m 13.00 27,000.00 351,000.00 26,190.00 340,470.00
12 OU/IU-2.L&F.01
Instalasi pipa refrigerant 1/4 + 3/8 c/w Isolasi m 12.00 306,000.00 3,672,000.00 296,820.00 3,561,840.00
Pipa drain AC 20 mm c/w isolasi m 13.00 27,000.00 351,000.00 26,190.00 340,470.00
13 OU/IU-2.LM.01
Instalasi pipa refrigerant 1/4 + 3/8 c/w Isolasi m 12.00 306,000.00 3,672,000.00 296,820.00 3,561,840.00
Pipa drain AC 20 mm c/w isolasi m 13.00 27,000.00 351,000.00 26,190.00 340,470.00