MEKELLE
Proposal on:
Date: May-02-2020
1|Page
1. Executive Summary
As per our first visit to the Cold -room located at Mekelle university main campus near Momona,
we have observed that the whole system was not functional, the circuit breaker was tripping while
we try to turn it on, the cables are installed over the roof of the room in a very complicated way
and exposed to rain water, wind and sun light and trees are shading around the room.
1. Problem Identification
In this stage we will check the detailed electrical drawings of the system and the
connections in the room.
2. Electrical installation and testing.
During this test, we will start overall electrical connections and feeding appropriate power
for the chiller to test the functionality.
3. Troubleshooting and Maintenance
In this stage we will identify the defective components, such as burned devices, missed
components, open circuit and we will put a solution for them to be functional.
2. Background
Mekelle University Specifically Ethiopian institute of Technology-Mekell (EiT-M) as one of the
higher academic institutions in Ethiopia is striving with significant early success, to meet
international standards. The institute is engaged in highly ambitious effort to realign its system in
order to contribute more directly to its national strategy for economic growth, good governance
and poverty reduction. Among the main objectives of the institutes is providing community
service and scaling up the knowledge of engineers and/or technicians working in different
governmental and nongovernmental offices and industries every time.
Cold-room is one of the essential tools in the area of science and technology for qualitative and
quantitative research products, and to achieve quality education. The available cold-room in CNCS is
designed in two independent warehouses size with different temperature. The two cold-rooms have a
temperature of -5 °C to +15 °C for chiller rooms and Freezer room -6 °C to -60 °C. It is used as a
distributing center for research samples, for physical, chemical and biological sample preservation. In
order to obtain adequate and accurate experimental results appropriate sample processing and storage
2|Page
are critical once. The main purpose of the cod-room is for bio preservation of sample into a state of
suspended animation allowing for its retrieval in fully functional condition.
The ultimate goal or benefits of the cold-room is for preservation of a variety of sample types
including: cells, tissues, bacteria, viruses (like COVID-19), seeds, plant specimens and isolated sub-
cellular components (organelles, DNA, RNA, proteins).
The cold-room is located in a place where difficult for operation and utilization which is surrounded
by big trees. Due to the inappropriate location of the cold-room, the electromechanical parts of the
system are covered with dust which will lead to shorten the life time of the cold-room system and
failure to the electromechanical parts. The other big problem observed externally in the cold-room is
a very bad electrical installation which is exposed to short and/or open circuit.
3|Page
Figure 2: bad electrical wiring
4|Page
Figure 4: Top view of the cold-room and its bad electrical installation crossing over the roof
3. Objective
The main objective of this proposal is to bring the Cold-room to its regular operation with its
designed capacity and to reduce machine down time.
4. Methodology
Studying and evaluation data is a cornerstone for performing efficient maintenance and repair of
cold-room. The presence of these data is main input for developing scheduled preventive
maintenance and repair. The study consists of
5|Page
Study safety of electrical installation requirements for the failed cold-room.
a. To reduce the degree, purchase to maintain the normal activities of the department.
b. To provide a better maintenance and repair Cold-room with relevant information regarding
college’s interest.
c. To assist specially the operators in how to use cold-room effectively and maintain them.
d. To give better maintenance/repair after failure and preventive/service maintenance before
failure.
e. To provide a continues checkup of every machinery and maintaining if any comment is
raised by the user during the maintenance duration.
f. To scale up the knowledge and experience of the operators.
1 Providing necessary repair and maintenance materials like motor rewinding, filling of
refrigerant gas and equipment purchasing.
2 To collaborate with the maintenance person during data collection, repair and maintenance
time.
3 To provide materials to be replaced as per the maintenance person suggestion.
4 To process and facilitate payments as agreement reached.
6|Page
1. To collect necessary data that enable proper repair and maintenance.
2. To set up communication with clients for proper maintenance and repair.
3. Maintaining those machines to their working capacity
4. Providing recommendations to the client.
7. Service price
The minimum service price for conducting maintenance of cold-room is given in the table below.
Your office up on its convenience can prioritize the tasks of the assignment from the activity and
details of the cost break down summarized below.
7|Page
8. Material Cost
Total 52,950.00
8|Page
2. Amanuel Amare
MSc. in Nanoelectronic systems
PLC Logo Certified
PLC Step-7 certified
Experienced in
Relay-contactor installation
MAT Lab programming
Electrical motor rewinding and designing
Electrical machine maintenance
PLC programming
Microelectronic device maintenance
Kitchen equipment maintenance
3. Girmay Abreha
9|Page