Reported By:-
Girma Dechasa /227214/ -----------------
Yohalashet wondumu /316596/ -----------------
Belay hailu /697381/ -----------------
Yasin Ahmed /273983/ …………………….
Emergency Maintenance Work Report
Solution taken
The breaker spring charging mechanism was aligned by using crick and pulling up the stored
spring force upward to make aligned to the normal position
The tripping circuit was totally missed during the project handover and is fixed by tracing the
whole circuit and building new modified wiring diagram.
The electrical guard’s connection was wrong and is fixed by designing new schematic circuit and
diagram.
The testing of the new extension wiring circuit and the breaker tripping is done successfully
Future work to be done urgently
Awash substation has complicated problems and require detail investigation, inspection.
Moreover there are lot of problems resumed from the project hand over. As much as possible the
substation require urgent full inspection and investigation to avoid the redundancy of power
outage.
Some of the problems required urgent solution.
Transformer electrical and non-electrical full investigation
Circuit breaker mal operation
15kv Switchgear operation problem
Transformer protection relay are not functional
230kv bus bar not functional
Wiring circuit of transformer and 15kv bays