Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Fjord Shipping AS Ship Specific Manuals > Refrigerated Cargo Instructions APPROVED

0240 10 Pre-Loading/Discharging Checklist


Revision 04 – 26.03.2021

Vessel: ________________________ Port: _________________________


Date: _________________________ Time: _________________________

Before loading/discharging the Officer in charge is to check the following items.

Item OK Comments
1 Cargo holds ready for loading/discharging

2 Lashing for cargo ready for use

3 Gangway ready to use

4 Trucks ready to use

5 Check that crane or hoist is not tagged with an out-


of-order sign.

6 Crane ready to use, wire/hook/block etc. checked


visually

7 Before heavy lift (25-50 tons) All tanks shall be


checked for no free surfaces. Check that the
stability is sufficient for this operation.

8 When use of deck crane during loading the cargo


must only be hooked in acc to the producer’s guide.
If this guide is not obtained, the master considers if
the loading shall take place

9 Check for any unusual sounds from the crane or


hoist mechanism while operating the crane or hoist.
Check for hydraulic oil leak.

10 Check that all persons involved in operation are


informed about the operation and know their duties.

11 Instruct shore Stevedores regarding safety aspects (Elevators, cranes, forklifts)


and limitations of cargo equipment.

12 All entrance's to cargo holds on all deck's to be


secured against falling. Physical obstacles as
bars, chains, fencing etc to be in place directly
after opening.

Signed by;________________________________ (Name and Rank)

• Completion of the checklist to be noted in the deck logbook.


• The last checklist to be kept available onboard.
• The checklist can be disposed of upon a new checklist is taken into use.

You might also like