Professional Documents
Culture Documents
TE - Lighting E
TE - Lighting E
TE - Lighting E
PR No.: PR 22-498136
Date: January 26, 2023
Please see attached proposals received from bidders for your review and evaluation based on your technical requirements.
You are hereby given two (2) working days to submit the result of your evaluation.
Instructions:
Kindly indicate C (for Complying) if the technical specifications, scope of work, methodology and expected results of the specific proposal
satisfactorily meets the key requirements for the goods and/or services requested in the PR, NC (for Non-Complying) if the technical
specifications, scope of work, methodology and expected results of the specific proposal do not meet the key requirements for the goods and/or
services requested in the PR, or NQ (for No Quote) if supplier has no offer.
(Note: If rated as NC, please give a short explanation why the proposal is Non-COmplying on the Remarks section below.)
PR No. S/No. DESCRIPTION / SPECIFICATION QUANTITY UOM SUPPLIER A SUPPLIER B SUPPLIER C SUPPLIER D SUPPLIER E
c c c
FLOODLIGHT, FIXTURE, METAL HALIDE, E27, MEASUREMENT: L65.5 x W3 x H3 CM, DIE‐CAST
PR 22-498136 3
ALUMINUM HOUSING
30 PC NQ NQ
Page 1 of 1