Commissionig List

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 23

Commissioning of Compressed

Sr # Name Date Duration( Max Pressure Ampere( Voltage(


min) (bar) A) V)

1 Compressor GA55VSD+ 45054 70 6.5 85 400


2 Dryer FD260VSD 45054 40 5 400
3 Compressed Air Receiver Tank 45054 35 6.2
4 Compressor GA55VSD+ 45058 30 10 93 400
5 Dryer FD260VSD 45058 30 5 400
6 Compressed Air Receiver Tank 45058 30
ng of Compressed Air Equipments
Relative
Power Speed Humidity( Amb Temp Temp
(kW) (RPM) (°C) (°C)
%)
55 5400 31 85
3.6

55 1893 32 79
3.6 1000 12 34 54.6
Remarks
Commissioning of Tube Wells
Duration(
Sr # Name Date Start Time End Time AMP
min)

1 Tubewell-01 45052 17.9 20


2 Tubewell-02 45052 19.1 20
3 Tubewell-03 45052 18.6 20
4 Tubewell-01 45060 17.9 30
5 Tubewell-02 45060 19.1 30
6 Tubewell-03 45061 17.9 30
7 Tubewell-01 45064 15:10:00 17:51:00 17.9 2:41
8 Tubewell-02 45064 15:25:00 17:47:00 19.1 2:22
9 Tubewell-02 45065 09:00:00 11:26:00 18.9 2:26
10 Tubewell-02 45065 14:55:00 16:17:00 19.1 1:22
11 Tubewell-02 45066 09:10:00 11:40:00 18.9 2:30
12 Tubewell-02 45066 14:55:00 17:05:00 18.8 2:10
13 Tubewell-02 45067 10:10:00 10:52:00 18.8 0:42
14 Tubewell-02 45067 11:40:00 12:47:00 18.8 1:07
15 Tubewell-02 45068 14:50:00 19:10:00 18.8 4:20
16 Tubewell-02 45069 07:10:00 08:29:00 18.8 1:19
17 0:00
18 0:00
Wells

Remarks

Raw water tank filling


Log Sheet of Submersible Pumps

Sr # Name Date Start Time End Time AMP

1 SP-PD 01 ### 15:39:00 16:00:00 2.8


2 SP-PD 02 45065 16:00:00 18:41:00 2.9
3 SP-PD 03 45065 16:10:00 16:23:00 2.7
4 SP-PD 04 45065 16:23:00 18:45:00 2.8
5 SP-PD 01 45066 09:20:00 10:30:00 2.8
6 SP-PD 02 45066 10:30:00 12:50:00 2.8
7 SP-PD 03 45066 09:20:00 10:31:00 2.7
8 SP-PD 04 45066 14:05:00 14:25:00 2.9
9 SP-PD 02 45066 14:00:00 14:20:00 2.8
10 SP-PD 04 45066 15:00:00 17:20:00 2.9
11 SP-PD 02 45066 14:50:00 17:22:00 2.8
12 SP-PD 01 45067 10:12:00 10:55:00 2.7
13 SP-PD 03 45067 10:12:00 11:00:00 2.8
14 SP-PD 01 45067 11:05:00 12:47:00 2.3
15 SP-PD 02 45067 11:05:00 12:47:00 2.3
16 SP-PD 03 45067 11:05:00 12:47:00 2.4
17 SP-PD 04 45067 11:05:00 12:47:00 2.4
18 SP-PD 02 45068 09:38:00 13:10:00 2.9
19 SP-PD 04 45068 09:38:00 13:10:00 2.9
20 SP-PD 01 45068 14:05:00 19:10:00
21 SP-PD 02 45068 14:05:00 19:10:00
22 SP-PD 03 45068 14:05:00 19:10:00
23 SP-PD 04 45068 14:05:00 19:10:00
24
25
ersible Pumps

Duration Remarks

00:21:00 During Sand filters Backwashing


02:41:00
00:13:00
02:22:00
01:10:00
02:20:00
01:11:00
00:20:00
00:20:00
02:20:00
02:32:00
00:43:00
00:48:00
01:42:00
01:42:00
01:42:00
01:42:00
03:32:00
03:32:00
05:05:00
05:05:00
05:05:00
05:05:00
00:00:00
00:00:00
00:00:00
00:00:00
00:00:00
00:00:00
00:00:00
00:00:00
00:00:00
00:00:00
00:00:00
00:00:00
Raw Water Pumps Log Sheet
Ampere( Duration
Sr # Name Date ON Time OFF Time
A) (min)

1 Raw Water Pump-01 ### 11:50:00 11:55:00 16.4 0:05


2 Raw Water Pump-02 ### 11:56:00 11:59:00 17 0:03
3 Raw Water Pump-01 ### 14:56:00 15:04:00 16.5 0:08
4 Raw Water Pump-01 ### 15:36:00 15:54:00 16.5 0:18
5 Raw Water Pump-01 ### 16:10:00 16:18:00 16.5 0:08
6 Raw Water Pump-02 ### 14:48:00 14:55:00 16.9 0:07
7 Raw Water Pump-01 ### 16:20:00 16:50:00 16.5 0:30
8 Raw Water Pump-01 ### 18:19:00 18:50:00 16.5 0:31
9 Raw Water Pump-01 ### 09:25:00 09:51:00 15.5 0:26
10 Raw Water Pump-01 ### 10:02:00 10:32:00 15.5 0:30
11 Raw Water Pump-02 ### 10:45:00 11:15:00 16.5 0:30
12 Raw Water Pump-02 ### 11:25:00 11:42:00 16.5 0:17
13 Raw Water Pump-02 ### 12:00:00 12:13:00 16.5 0:13
14 Raw Water Pump-02 ### 12:14:00 12:21:00 16.5 0:07
15 Raw Water Pump-02 ### 12:32:00 12:46:00 16.5 0:14
16 Raw Water Pump-02 ### 14:30:00 14:47:00 16.5 0:17
17 Raw Water Pump-02 ### 15:00:00 15:03:00 16.5 0:03
18 Raw Water Pump-02 ### 15:51:00 16:03:00 16.5 0:12
19 Raw Water Pump-02 ### 16:10:00 16:25:00 16.5 0:15
20 Raw Water Pump-02 ### 16:45:00 17:00:00 16.5 0:15
21 Raw Water Pump-02 ### 10:20:00 10:37:00 16.5 0:17
22 Raw Water Pump-02 ### 10:50:00 11:50:00 16.5 1:00
23 Raw Water Pump-02 ### 11:56:00 12:29:00 16.5 0:33
24 Raw Water Pump-02 ### 12:41:00 12:47:00 16.5 0:06
25 Raw Water Pump-02 ### 14:10:00 15:05:00 16.5 0:55
26 Raw Water Pump-02 ### 15:10:00 15:33:00 16.5 0:23
27 Raw Water Pump-02 ### 15:34:00 15:43:00 12.8 0:09
28 Raw Water Pump-02 ### 15:49:00 15:53:00 12.8 0:04
29 Raw Water Pump-02 ### 16:12:00 16:18:00 12.8 0:06
30 Raw Water Pump-02 ### 16:31:00 16:46:00 12.8 0:15
31 Raw Water Pump-01 ### 15:34:00 15:43:00 14.1 0:09
32 Raw Water Pump-01 ### 15:33:00 15:53:00 14.1 0:20
33 Raw Water Pump-01 ### 16:12:00 16:46:00 14.1 0:34
34 Raw Water Pump-01 ### 16:53:00 17:26:00 14.1 0:33
35 Raw Water Pump-01 ### 10:35:00 10:45:00 14.1 0:10
36 Raw Water Pump-02 ### 10:31:00 10:50:00 13.1 0:19
37 Raw Water Pump-02 ### 10:55:00 11:30:00 13.1 0:35
38 Raw Water Pump-02 ### 11:45:00 13:07:00 13.1 1:22
39 Raw Water Pump-01 ### 14:27:00 14:38:00 13.1 0:11
40 Raw Water Pump-01 ### 15:00:00 15:35:00 13.1 0:35
41 Raw Water Pump-01 ### 16:18:00 17:00:00 13.1 0:42
42 Raw Water Pump-02 ### 16:31:00 17:00:00 13.1 0:29
43 Raw Water Pump-02 ### 17:05:00 17:33:00 13.1 0:28
44 Raw Water Pump-01 ### 17:10:00 17:40:00 13.1 0:30
45 Raw Water Pump-02 ### 18:12:00 18:25:00 13.1 0:13
46 Raw Water Pump-01 ### 18:29:00 18:45:00 13.1 0:16
47 0:00
48 0:00
49 0:00
50 0:00
51 0:00
52 0:00
53 0:00
54 0:00
55 0:00
56 0:00
57 0:00
58 0:00
59 0:00
60 0:00
61 0:00
62 0:00
63 0:00
64 0:00
65 0:00
66 0:00
67 0:00
68 0:00
g Sheet

Remarks
Commissioning of
Duration( Max Pressure Ampere( Voltage(
Sr # Name Date
min) (bar) A) V)

1 Tubewell-01 45052 20 6.5 85 400


2 Tubewell-02 45052 20 5 400
3 Tubewell-03 45052 20 6.2
4 Tubewell-01 45060 30 10 93 400
5 Tubewell-02 45060 30 5 400
6 Tubewell-03 45061 30
ommissioning of Boiler
Relative
Power Speed Amb Temp Temp
Humidity(
(kW) (RPM) %) (°C) (°C)

55 5400 31 85
3.6

55 1893 32 79
3.6 1000 12 34 54.6
Remarks
Commissioning of Cooli
Duration( Max Pressure Ampere( Voltage(
Sr # Name Date
min) (bar) A) V)

1 Tubewell-01 45052 20 6.5 85 400


2 Tubewell-02 45052 20 5 400
3 Tubewell-03 45052 20 6.2
4 Tubewell-01 45060 30 10 93 400
5 Tubewell-02 45060 30 5 400
6 Tubewell-03 45061 30
ssioning of Cooling Towers
Relative
Power Speed Amb Temp Temp
Humidity(
(kW) (RPM) %) (°C) (°C)

55 5400 31 85
3.6

55 1893 32 79
3.6 1000 12 34 54.6
Remarks
Commissioning of HVA
Duration( Max Pressure Ampere( Voltage(
Sr # Name Date
min) (bar) A) V)

1 Tubewell-01 45052 20 6.5 85 400


2 Tubewell-02 45052 20 5 400
3 Tubewell-03 45052 20 6.2
4 Tubewell-01 45060 30 10 93 400
5 Tubewell-02 45060 30 5 400
6 Tubewell-03 45061 30
missioning of HVAC Pumps
Relative
Power Speed Amb Temp Temp
Humidity(
(kW) (RPM) %) (°C) (°C)

55 5400 31 85
3.6

55 1893 32 79
3.6 1000 12 34 54.6
Remarks
Commissioning of WB
Duration( Max Pressure Ampere( Voltage(
Sr # Name Date
min) (bar) A) V)

1 Tubewell-01 45052 20 6.5 85 400


2 Tubewell-02 45052 20 5 400
3 Tubewell-03 45052 20 6.2
4 Tubewell-01 45060 30 10 93 400
5 Tubewell-02 45060 30 5 400
6 Tubewell-03 45061 30
missioning of WBS Pumps
Relative
Power Speed Amb Temp Temp
Humidity(
(kW) (RPM) %) (°C) (°C)

55 5400 31 85
3.6

55 1893 32 79
3.6 1000 12 34 54.6
Remarks