Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

SHAJAR ABBAS

Darya Khan / Punjab, 30100 Pakistan ◆ 03015378876 ◆ shajar.sup@gmail.com ◆ WWW: Bold Profile

PROFESSIONAL SUMMARY
Organized and dependable candidate successful at managing multiple priorities with a positive attitude.
Willingness to take on added responsibilities to meet team goals. Hardworking and passionate job seeker
with strong organizational skills eager to secure entry-level MECHANICAL SUPERVISOR position.
Ready to help team achieve company goals. To seek and maintain full-time position that offers
professional challenges utilizing interpersonal skills, excellent time management and problem-solving
skills.

SKILLS
Progress Reports Site Inspection
Piping Fabrication and Installation Project Requirements
Timely Project Completion Project Monitoring
Technical Integration Team Management
Safe Work Practices Materials Planning
Operational Standards

WORK HISTORY
Senior Project Supervisor, 03/2023 - Current
CITION M&P LLC – National Food Ltd Faisalabad
Evaluated existing procedures and made proactive adjustments to meet changing demands.
Prepared, checked, and coordinated documentation to support component design and application.
Skilled at working independently and collaboratively in a team environment.
Coordinated engineering team for projects in commercial and industrial development.
Self-motivated, with a strong sense of personal responsibility.
Managed time efficiently in order to complete all tasks within deadlines.
Used critical thinking to break down problems, evaluate solutions and make decisions.
Facilitated workshops to collect project requirements and user feedback.
Analyzed project performance data to identify areas of improvement.
Reported regularly to managers on project budget, progress and technical problems.
Tracked project and team member performance closely to quickly intervene in mistakes or delays.

Piping Supervisor, 05/2022 - 02/2023


Technology Development Fabrication Company Ltd – Maple Leaf Cement Factory (WHR PROJECT)
Mianwali
Liaised between field engineers and trade workers align construction projects with drawings and
specifications.
Supervised layout, assembly and installation of various sizes piping
Reviewed and approved employee time reporting.
Oversaw daily operations at site, keeping team production moving at optimal pace.
Inspected equipment and tools used for safe operation.
Monitored job progress and performance of employees or contractors to complete projects prior to
deadlines.
Assembled and secured pipes, tubes, fittings and related equipment according to project
specifications.

Mechanical Supervisor, 09/2021 - 04/2022


ETIMAD ENGINEERING PVT. LTD. – 16MW CFB Power Plant NIMIR Chemical LTD Bhikhi
Delegated team assignments, reviewed work and set schedules to maintain optimal coverage of all
mechanical needs.
Reported on work progress to manager and incorporated feedback to maintain tight schedules.
Protected workers and general public by enforcing strict safety practices.
Scheduled, assigned and monitored maintenance programs for mechanical and related systems.

Piping Supervisor, 03/2020 - 04/2021


:ZOHAN TAHA ENGINEERING CONTRACTORS – 660MW LUCKY ELECTRIC POWER LTD
Karachi
Supervised layout, assembly and installation of various sizes and types of drainage pipes.
Assembled and secured pipes, tubes, fittings and related equipment according to project
specifications.
Prepared and submitted reports on job progress and safety conditions to upper management.
Provided feedback to workers on job performance and safety procedures.
Created and implemented plans to maximize efficiency of workers.

Mechanical Superintendent, 02/2018 - 02/2020


ATMA ENGINEERING SERVICES. – HASCOL OIL BULK TERMINAL (KARACHI & KOTLA
JAM)

Implemented quality programs, evaluated results and improved service policies to meet changing
needs.
Protected workers and general public by enforcing strict safety practices.
Reported on work progress to manager and incorporated feedback to maintain tight schedules.
Delegated team assignments, reviewed work and set schedules to maintain optimal coverage of all
mechanical needs.
Monitored and motivated employees, tracking and documenting activities, correcting problems and
implementing improvement plans to boost quality of mechanical work.

Piping Supervisor, 06/2017 - 01/2018


ZEALCON ENGINEERING PVT. LTD – NAIMAT GAS FIELD UEP TANDO ADAM
Liaised between field engineers and trade workers align construction projects with drawings and
specifications.
Supervised layout, assembly and installation of various sizes and types of drainage pipes.
Assembled and secured pipes, tubes, fittings and related equipment according to project
specifications.
Communicated with stakeholders on job milestones.

Mechanical Supervisor, 10/2016 - 06/2017


AMS POWER ENGINEERING PVT. LTD – 2x660 CFB Project (Karachi)
Delegated team assignments, reviewed work and set schedules to maintain optimal coverage of all
mechanical needs.
Reported on work progress to manager and incorporated feedback to maintain tight schedules.

Mechanical Supervisor, 12/2015 - 10/2016


ETIMAD ENGINEERING PVT. LTD – 18MW CO-GEN PLANT CPBM PROJECT LAHORE & Fuji
Meat Ltd Project (Karachi)
Delegated team assignments, reviewed work and set schedules to maintain optimal coverage of all
mechanical needs.
Reported on work progress to manager and incorporated feedback to maintain tight schedules.
Protected workers and general public by enforcing strict safety practices.
Scheduled, assigned and monitored maintenance programs for mechanical and related systems.

Mechanical Supervisor, 08/2014 - 06/2015


MATRIX ENGINEERING PVT. LTD. – C-I-8 P&G PLANT PORT QASIM (KARACHI)

Supervised installation of different types of mechanical equipment, keeping work in line with
drawings and specifications.
Reported on work progress to manager and incorporated feedback.
Scheduled, assigned and monitored maintenance programs for mechanical and related systems.

Piping Foreman, 10/2012 - 10/2013


AL BARIO ENGINEERING PVT LTD – CCPP 747 PROJECT GUDDU THARMAL POWER
PLANT
Signed off on inspection test reports and pressure test updates.
Completed daily logs and progress reports.
Fabricated new piping and parts to fit specific requirements.

Piping Foreman, 08/2012 - 11/2012


BABCOCK BORSIG SERVICE (U.A.E) – GASCO HUBSHAN-1 RICHAMIN SHUTDOWN
Completed daily logs and progress reports.
Assembled and secured pipes, tubes, fittings and related equipment according to project
specifications.
Reviewed and approved employee time reporting.
Prepared and submitted reports on job progress and safety conditions to upper management.

Piping Foreman, 11/2011 - 06/2012


ABDULLAH AL-BARRAK & SONS CO (K.S.A) – RAS TANURA REFINERY (SAUDI ARAMCO)
Completed daily logs and progress reports.
Fabricated new piping and parts to fit specific requirements.
Supervised layout, assembly and installation of various sizes and types of drainage pipes.

Piping Fabricator, 03/2009 - 03/2011


BABCOCK BORSIG SERVICE (U.A.E) – DEWA (M) STATION DUBAI UAE
Skilled at working independently and collaboratively in a team environment.
Self-motivated, with a strong sense of personal responsibility.
Proven ability to learn quickly and adapt to new situations.
Worked well in a team setting, providing support and guidance.
Worked effectively in fast-paced environments.
Managed time efficiently in order to complete all tasks within deadlines.

EDUCATION
Associate of Science: Mechanical Engineering Technology, 08/2007
Bright Technical Center of Modren Sciences (BTCMS) - Peshawar

LANGUAGES
Urdu, Punjabi: Native language
English: B2

Upper intermediate

You might also like