SHUMET SANITERY AND FINISHING work

labour cost description for degabur hospital sanitery work


only 1st floor slab sanirery work
previous works unit quantity unit prices total price
WC water closet point 12 800 9600
Hand wosh point 42 800 33600
shower point 16 800 12800
urynary point 2 800 1600
floor Drainth point 57 800 45600
clean out point 0 800 0
pivc raizer ml 0 150 0
ppr instalation ml 0 100 0

129 103200

New work
wc water clost point 30 800 24000
Hand wosh point 21 800 16800
shawer point 0 800 0
urinary point 9 800 7200
floor Drainth point 51 800 40800
clean out point 6 800 4800
pivc raizer ml 0 150 0
ppr raizer ml 0 100 0
117 93600

previous new
paiment condition 103200 93600 totall
1st phass,
pvic instaletion pointed
at each correct plac 50% 51600 46800 98400
2nd phass
ppr instaletion with
checked bay presser
test 25% 25800 23400 49200
3rd
fitting all pionts at each
room 25% 25800 23400 49200

advanc totall
from previously work 15000 20000 3000 38000
from new work 10000 10000 10000 30000
bracke 0
68000

balance from
1st phas rate advance balance
from previous 51600 38000 13600
from new work 46800 30000 16800
price scaletoin from new 20% 9360

39760