This document contains a schedule for employees working at the WWTP utility department from December 7-20, 2020. It lists 24 employees divided into different work groups such as boiler, HVAC, and power house. The schedule assigns each employee to a shift indicated by codes like SH17, NS08, and OFF for each day during the two-week period.
Original Description:
Original Title
Absensi Utility Week 50 (rev.1) & Absensi Utility Week 51
This document contains a schedule for employees working at the WWTP utility department from December 7-20, 2020. It lists 24 employees divided into different work groups such as boiler, HVAC, and power house. The schedule assigns each employee to a shift indicated by codes like SH17, NS08, and OFF for each day during the two-week period.
This document contains a schedule for employees working at the WWTP utility department from December 7-20, 2020. It lists 24 employees divided into different work groups such as boiler, HVAC, and power house. The schedule assigns each employee to a shift indicated by codes like SH17, NS08, and OFF for each day during the two-week period.