I1912-AI-OPR-JC-0066-00 JC For Acrylic Emulsion Paint Works

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 3

DAIS Extention Project

I1912-AI-OPR-JC-0066-00
JOB CARD Rev. No. 00
Acrylic Emulsion paint work on Wall & Ceiling
Page 01 of 01

Location Date of Inspection:

Grid and level Time of Inspection:

Measurement
Sr. No Before Starting Construction Importance Tolerance/ Requirements Remarks/ Comments
SUB LIN RIL

1 GFC Drawing/Method
1 Preparation and Approval of method statement/shop drawing (Evaluate and write 0 for non confirming or 1 for confirming)
statement/Shop Drawing

2 Accessibility: Safe access to area visually (Evaluate and write 1 to 5) 4 Take 5 to be completed

3 Safety : Adequate safety precautions being taken place, green tag is in place and valid (Evaluate and write 1 to 5) 4 Take 5, Permits

Surface Preparation:Sand the surface with emery paper no.180 to remove loose particles,paint,dust,cracked & flaked paint and make Visual inspectio as per
4 2
surface dust free, cement slurry, gradual grind and wipe clean (Evaluate and write 1 to 5) manufacture requirement

Moisture content: Check of moisture content of substrate for application of primer using moisture meter (Write 0 for non conforming
5 3 Max 15%
& 1 for conforming)

AIPL LIN India Pvt. Ltd. RIL

Construction
Activity owner QA / QC Site Engineer QA/QC Representative QA/QC Representative
Measurement
Sr. No Application of Water based Cement primer Importance Tolerance/ Requirements Remarks/ Comments
SUB LIN RIL
ratio of 1:0.5 with graduated
1 Mixing of water based cement primer: Mix water based cement primer with water (Write 0 for non conforming & 1 for conforming) 2
measuring jar

2 Consistency: Stir with spindle mechanically (Evaluate and write 1 to 5) 2 Consistent homogeneity

Application of water based cement primer :Apply water based cement primer uniformly over surface coverage (Evaluate and write Shall applied uniformly and
3 3
1 to 5) coverage 120-150sqft/lit

4 Drying time : Check the drying time as per TDS (Write 0 for non conforming & 1 for conforming) 2 Overnight drying time

AIPL LIN India Pvt. Ltd. RIL

Construction
Activity owner QA / QC Site Engineer QA/QC Representative QA/QC Representative
Measurement
Sr. No Application of first & second coat of wall putty Importance Tolerance/ Requirements Remarks/ Comments
SUB LIN RIL
Surface preparation : Smoothen the surface by filling dents with wall putty upto maximum thickness of 3-4mm (Write 0 for non Sand with emery paper 180 if
1 2
confirming & 1 for conforming) irregularities are observed
Application of first & second coat of wall putty : Apply wall putty on RCC/Gypsum punning surface uniformly (Evaluate and write
2 2 With putty blade uniformly
1 to 5)
Coverage: Weigh the mix using weighing machine before and after application of putty for calculation the coverage (Write 0 for non Coverage 20sqft/kg sample it
3 3
confirming and 1 for confirming) for 1sqm area
4 Drying time : Check for drying time (Write 0 for non confirming and 1 for confirming ) 2 Min 4-6 hours - as per TDs

AIPL LIN India Pvt. Ltd. RIL

Construction
Activity owner QA / QC Site Engineer QA/QC Representative QA/QC Representative
Measurement
Sr. No. Application of Water based Cement primer Importance Tolerance/ Requirements Remarks/ Comments
SUB LIN RIL

uniform surface shall be


1 Surface preparation: Sand the surface with emery paper 180 and wipe clean (Write 0 for non conforming & 1 for conforming) 2
achieved

Mixing of water based cement primer: Mix ICI water based cement primer with water (Write 0 for non conforming & 1 for Ratio of 1:0.5 with graduated
2 2
conforming) measuring jar

3 Consistency: Stir with spindle mechanically (Evaluate and write 1 to 5) 2 Consistent homogeneity

Application of water based cement primer :Apply water based cement primer uniformly over surface coverage (Evaluate and write Shall applied uniformly and
4 3
1 to 5) coverage 120-150sqft/lit

5 Drying time : Check the drying time as per TDS(Write 0 for non conforming & 1 for conforming) 2 Overnight drying time

AIPL LIN India Pvt. Ltd. RIL

Construction
Activity owner QA / QC Site Engineer QA/QC Representative QA/QC Representative
Measurement
Sr. No Application of first coat of paint Importance Tolerance/ Requirements Remarks/ Comments
SUB LIN RIL

1 Surface preparation: Sand the surface with emery paper 180 and wipe clean(Write 0 for non conforming & 1 for conforming) 2 uniform surface shall be achieved

Mixing of paint: Mix paint with water and stir with spindle mechanically for homogeneity (Write 0 for non conforming & 1 for
2 2 Ratio of 1:0.3
conforming)

Shall applied uniformly and


3 Application of paint :Apply first coat paint uniformly over surface coverage (Evaluate and write 1 to 5) 3 coverage 120-150sqft/lit

4 Drying time : Check the drying time (Write 0 for non conforming & 1 for conforming) 2 Min 3-4 hours

AIPL LIN India Pvt. Ltd. RIL

Construction
Activity owner QA / QC Site Engineer QA/QC Representative & (OR) QA/QC Representative
DAIS Extention Project
DAIS Extention Project
JOB CARD I1912-AI-OPR-JC-0066-00
Acrylic Emulsion paint work on Wall & Ceiling Rev. No. 00
Page 01 of 01
Location Date of Inspection:
Grid and level Time of Inspection:

Measurement
Sr. No Application Of Second Coat Of Paint Importance Tolerance/ Requirements Remarks/ Comments
SUB LIN RIL

Surface preparation for 2nd coat: If recoating interval of exceed 4 hrs proceed with touch ups to rectify any visible defects which uniform and levelled surface
1 2
includes sanding with 180 emery paper (Evaluate and write 1 to 5) free from any visual defects

Mixing of paint: Mix paint with water and stir with spindle mechanically for homogeneity (Write 0 for non conforming & 1 for
2 2 Ratio of 1:0.25
conforming)

Shall applied uniformly and


3 Application of paint :Apply first coat paint uniformly over surface coverage (Evaluate and write 1 to 5) 3
coverage 65-75 sqft/lit

4 Drying time : Check the drying time (Write 0 for non conforming & 1 for conforming) 2 Min 3-4 hours

AIPL LIN India Pvt. Ltd. RIL

Construction
Activity owner QA / QC Site Engineer QA/QC Representative QA/QC Representative
Measurement
Sr. No POST CONSTRUCTION Importance Tolerance/ Requirements Remarks/ Comments
SUB LIN RIL

1 Final finish : Check for efflorescence, starring and any peeling off in provided lighting (Evaluate and write 1 to 5) 3 No peel off/staining/efflorescence

Uniformity of shade : Check for uniformity of colour shade comparing with approved sample in provided lighting (Evaluate and write
2 3 No change in shade
1 to 5)

3 Joint marks: Check for joint mark between adjacent coated area in provided lighting (Evaluate and write 1 to 5) 3 No joint mark

AIPL LIN India Pvt. Ltd. RIL

Construction
Activity owner QA / QC Site Engineer QA/QC Representative QA/QC Representative
Overall Workmanship (Quality/General)

Supporting document must be attached above importance level 3 and above.

Comments :
Good observation (if any)
LIN RIL

Construction Representative QA/QC Engineer Site In-Charge & (OR) QA/QC Engineer
DAIS-QAP-F14 Rev. 00 dt. 05.12.2022
DAIS Extention Project
I1912-AI-OPR-JC-0066-00
JOB CARD Rev. No. 00
Acrylic Emulsion paint work on Wall & Ceiling
Page 01 of 01
Location Date of Inspection:
Grid and level Time of Inspection:

Tolerance/ Measurement
Sr. No Application Of Second Coat Of Paint Importance Remarks/ Comments
Requirements SUB LIN RIL
uniform and levelled
Surface preparation for 2nd coat: If recoating interval of exceed 4 hrs proceed with touch ups to rectify any
1 2 surface free from any
visible defects which includes sanding with 180 emery paper (Evaluate and write 1 to 5)
visual defects
Mixing of paint: Mix paint with water and stir with spindle mechanically for homogeneity (Write 0 for non
2 2 Ratio of 1:0.25
conforming & 1 for conforming)
Shall applied
3 Application of paint :Apply first coat paint uniformly over surface coverage (Evaluate and write 1 to 5) 3 uniformly and
coverage 65-75 sqft/lit
4 Drying time : Check the drying time (Write 0 for non conforming & 1 for conforming) 2 Min 3-4 hours

AIPL LIN India Pvt. Ltd. RIL

Construction
Activity owner QA / QC Site Engineer QA/QC Representative QA/QC Representative
Tolerance/ Measurement
Sr. No POST CONSTRUCTION Importance Remarks/ Comments
Requirements SUB LIN RIL

Final finish : Check for efflorescence, starring and any peeling off in provided lighting (Evaluate and write 1 to No peel
1 3
5) off/staining/efflorescence

Uniformity of shade : Check for uniformity of colour shade comparing with approved sample in provided
2 3 No change in shade
lighting (Evaluate and write 1 to 5)

3 Joint marks: Check for joint mark between adjacent coated area in provided lighting (Evaluate and write 1 to 5) 3 No joint mark

AIPL LIN India Pvt. Ltd. RIL

Construction
Activity owner QA / QC Site Engineer QA/QC Representative QA/QC Representative
Overall Workmanship (Quality/General)

Supporting document must be attached above importance level 3 and above.

Comments :
Good observation (if any)
LIN RIL

Construction Representative QA/QC Engineer Site In-Charge & (OR) QA/QC Engineer
DAIS-QAP-F14 Rev. 00 dt. 05.12.2022