GENERAL INFORMATION (Updated as on -13.02.2021)
SN Parameters Description
1 Name of the Mine BHARAT OC PH-II
DUNGARIA po dungaria dist
2 Address of the mine
–Chhindwara (MP)
3 Year of opening 01.07.2004
4 Name & contact numbers :
i) Nominated Owner DT WCL
ii) Area General Manager Shri Md. Sabir
Shri Anil Ku Sharma
iii) Agent/Project Officer/ Sub-Area Manager
&7587595237
Shri Pramod G. Mohod &
iv) Mine Manager
9479829650
Shri Manbahal Ram
v) Safety Officer
&7587595724
Shri Amitabh Gope
vi) Surveyor
6296253438
Shri Amit Pathria
vii) Colliery Engineer (E&M)/ Project Engineer (E&M)
& 8770624412
viii) Colliery Engineer (Excv.)/ Project Engineer (Excv.) Not Applicable
Shri U.K. Mehata &
ix) Area Safety Officer
9589697600
x) Area Survey Officer Shri S Guin & 9826512136
Scientific study required by PR/ Statute or recommended by Scientific study report was
any other Body (Details and implementation of prepared by Team constituted
5
recommendations) at WCL HQ level & same was
submitted to DGMS.
6 Geological details
i) Total Lease Hold Area 1209 Hect.
MEC III Top seam & 40-50m
ii) Details of coal seams with parting bands and depth
depth
iii) Coal grade/s and quality (Chemical analysis of coal) G-13
iv) Average annual rainfall( in mm) 1100 mm
7 Details of Coal Production & OB Removal
i) Average daily coal output Mine Working is Closed
ii) Average daily OB removal Mine Working is Closed
2020- 40,000 Te
iii) Coal Production in M. Tonnes (Last 3 Years) 2019- 86000 Te
2018 – 0 te
2020- 131092 M3
iv) OB Removal in M.m3 (Last 3 Years) 2019- 267133 M3
2018 - 0 M3
v) Average Stripping Ratio 1 in 4
8 Manpower details
i) Manpower on Roll (Departmental) 89
ii) Manpower on Roll (Contractual) 0
iii) Average daily employment 75
iv) List of Workmen Inspectors including Substitutes 03
( Details provided in Separate
v) Statutory Manpower( Requirement vis-à-vis On roll) Sheet- Annexure-I)
9 Mining Equipment
a) List of HEMMs
i) a) Departmental No
Presently No Contractor is
ii) b) Contractual deployed as Mine Working is
Closed
b) List of Auxiliary Equipment
i) a) Departmental
Presently No Contractor is
ii) b) Contractual deployed as Mine Working is
Closed
10 Vocational Training Status
a) Initial / Basic training ( Target & achievement during the calendar
year)
i) a) Departmental ( Details provided in Separate
ii) b) Contractual Sheet- Annexure-III)
b) Refresher/ Special ( Target & achievement during the calendar
year)
i) a) Departmental ( Details provided in Separate
ii) b) Contractual Sheet- Annexure-III)
11 Medical Examination
a) Initial Medical Examination /IME ( Target & achievement during
the calendar year)
i) a) Departmental ( Details provided in Separate
ii) b) Contractual Sheet- Annexure-III)
b) Periodical Medical Examination /PME ( Target & achievement
during the calendar year)
i) a) Departmental ( Details provided in Separate
ii) b) Contractual Sheet- Annexure-III)
12 Back shift inspection by key Mine official (frequency with ( Details provided in Separate
month wise details) Sheet- Annexure-IV)
13 List of Communication arrangements during mine operation ( Details provided in Separate
and its efficacy Sheet- Annexure-IV)
SN Parameters Status
1 DGMS permission for work in the area of present mine Valid and Applicable
workings
Prohibitory orders under Section 22/22A imposed during No any Prohibitory orders
last 3 years and its mitigation under Section 22/22A
imposed till.
2 Compliance of various statutory & non-statutory
requirement
a) Violations as pointed out by DGMS. Complied
a) Departmental
i) Dragline N.A.
ii) Rope Shovel/ Hydraulic Excavator N.A.
iii) Dumper N.A.
iv) Dozer N.A.
v) Drill N.A.
vi) Grader N.A.
vii) Water Sprinkler N.A.
viii) Crane N.A.
ix) Any other equipment N.A.
b) Contractual
i) Hydraulic Excavator
ii) Dump truck / Tipper Presently No Contractor is
iii) Dozer deployed as Mine Working is
Closed
iv) Drill
v) Grader
vi) Water Sprinkler
vii) Crane
viii) Any other equipment
F Workshop (Temporary Workshop)
Piped water supply provided
Fire extinguishers provided
Sand bucket provided
water buckets provided
Any other system and awareness of personal to the use of provided
equipment.
G Electrical Sub-Station
Fire extinguishers provided
Sand bucket provided
water buckets provided
Any other system and awareness of personal to use of provided
equipment.
Shut down Procedure displayed displayed
Display of Resuscitation procedure in case of electric provided
shock
H Diesel Pump, POL room, Store and record room
Fire extinguishers N.A.
Sand bucket N.A.
water buckets N.A.
Any other system and awareness of personal to use of As per SOP
equipment.
H Coal stock and coal seam fire
Arrangement of piped water supply provided
16 Safety Management Plan (SMP) -Review and Updation
a) Date of implementation 09.10.2018
b) Date of last Updation 16.02.2021
c) Risk Assessment Process 1. Identify the hazard
2. Rankings/Ratings
3. Controlling measures
4. Action Plan
i) Principal Hazards properly identified Yes.
ii) General awareness of workmen on Principal Hazards Yes
including PSC.
d) Mitigation/ Corrective measures undertaken to remove Yes
Principal Hazards as per control plan.
i) Principal Hazard Management Plan (PHMP). Yes, Prepared.
ii) Emergency Response Plan (ERP). Yes, Prepared.
iii) Trigger Action Response Plan (TARP). Yes, Prepared.
iv) Mock rehearsal Yes, Quarterly done.
e) Code of Practices(COP)/ Safe Operating
Procedures(SOP)
i) Whether all activities covered yes
ii) Whether COP/ SOP is risk based yes
iii) Whether COP/ SOP is framed in language understood by yes
general workforce
iv) Whether properly displayed yes
v) Whether distributed to all concerned yes
vi) Whether responsibility to implement covered in every yes
COP/ SOP
vii) Whether review of COP/ SOP conducted at regular yes
intervals
17 MAINTENANCE OF RECORDS AND REGISTERS
2 Safety Officer 01 01 -
3 Blasting Officer 01 - -
5 Colliery Engineer 01 01 0
SL. MACHINE AUTO SWING FIRE REMARKS ABOUT CORRECTIVE ACTION TAKEN & LIKELY DATE OF IMPLEMENTATION
MACHINE MODEL AFDSS
NO. SL.NO. START/STOP BRAKE EXTINGUISHER
01 NIL NIL NIL NIL NIL NIL NIL
SL. MACHINE FIRE AUTO DUST SUPPRESSION REMARKS FOR CORRECTIVE ACTION TAKEN & LIKELY DATE OF
MACHINE SL.NO.
NO. MODEL EXTINGUISHERS START/STOP SYSTEM IMPLEMENTATION
1 NIL NIL NIL NIL NIL NIL
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
REMARKS FOR
FIRE BEAR VIEW SIDE RECTIFICATIONS
BRAKE
EXTINGUISHERS MIRROR INDICATOR AND ACTIOM
DUMPER ELECTICAL CABIN HEAD BACK BLIND AUTO OPERATOR REAR PROXIMITY
SERIAL TAKEN W’R T
SN AVA HORN SPOT VISION WARNING
NO DEFUNCT / NON
MODEL START/STOP LIGHT LIGHT LIGHT MIRROR DIPPER SEAT BELT CAMARA DEVICE
MANUAL AFDSS LEFT RIGHT LEFT RIGHT SERVICE PARKING RETARDER DUMP EXISTANT
SAFETY
FEATURES
NIL NIL NIL NIL NIL NIL NIL NIL NIL NIL NIL NIL NIL NIL NIL NIL NIL NIL NIL NIL NIL NIL NIL NIL
Achieved Nil 20 0
Achieved % -- 100% 0%
Achieved Nil 20
Achieved % -- 100 %
Back shift inspection by key Mine official (frequency with month wise details)- Annexure-IV
Record of statutory inspection in respect of Ghorawari Colliery No.2 for the Month of JAN 2021
S.N. Designation Name of Officer I Shift II Shift III Shift Total Days
1. C.G.M. (K) Shri Mohammad Shabbir. 01 00 00 00
2. G.M.(O) (K) Shri Shrinivaslu 01 00 00 01
3. A.S.O. (K) Shri Uk Mehata 02 01 00 03
4. S.A.M.(GSA) Shri Anil Ku Sharma 15 05 01 20
5. Manager of Mine Shri Pramod G. Mohod 26 15 10 22
6. Safety Officer Shri S.K. Patidar 26 26 10 26
7. Colliery Engineer Shri Amit Pathria 26 17 04 26
Accident Details – Annexure- V
Driver of coal transport truck Shri Mahesh Kumar Verma (Contractual Worker) had parked the truck near Weigh-
Bridge and going to coal dispatch clerk for taking gate pass. Parked truck get movement and rolled forward direction,
so Shri Mahesh Kumar Verma climbed on the truck during the rolling condition of truck and tried to braked it, but
meanwhile left side tyre of truck climbed on ramp of Weigh-Bridge road and overturned to 90 Deg. towards driver
side, caused injury in right leg (just above the ankle joint).