This document provides a Gantt chart showing the timeline for two projects: the Gonzalez Ortega and La Rosita Projects. Both projects currently have approximately the same timeline and are being managed together in the same project plan until the next update. The chart shows the tasks, start and finish dates, and timeline for each stage of the two projects.
This document provides a Gantt chart showing the timeline for two projects: the Gonzalez Ortega and La Rosita Projects. Both projects currently have approximately the same timeline and are being managed together in the same project plan until the next update. The chart shows the tasks, start and finish dates, and timeline for each stage of the two projects.
This document provides a Gantt chart showing the timeline for two projects: the Gonzalez Ortega and La Rosita Projects. Both projects currently have approximately the same timeline and are being managed together in the same project plan until the next update. The chart shows the tasks, start and finish dates, and timeline for each stage of the two projects.
same timeline and are kept in the same project plan until next update. Service Pipeline ID Task Name Finish 06 Apr '20 13 Apr '20 20 Apr '20 27 Apr '20 04 May '20 11 May '20 W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W 0 Service Pipeline Sat 09/05/20 1 Drawings Mon 20/04/20 2 Pipeline Facility Drawings Tue 07/04/20 3 Review Thu 09/04/20 4 Supervision Mon 13/04/20 5 Signing and Sealing Mon 20/04/20 6 7 Procurement Mon 06/04/20 8 Protective Coating Materials Thu 02/04/20 9 Cathodic Protection System Sun 05/04/20 10 Pipeline Material Mon 06/04/20 11 12 Pipeline Construction Thu 30/04/20 13 Stockpiling and Stringing Tue 14/04/20 14 Surveying Wed 22/04/20 15 Field Bending Tue 21/04/20 16 Ditching and Excavation Wed 22/04/20 17 Welding Wed 22/04/20 18 Welding Inspection Thu 23/04/20 19 Coating Sat 25/04/20 20 Lowering-in Sat 25/04/20 21 Holiday Detection Test Sat 25/04/20 22 Cathodic Protection Work Sun 26/04/20 23 Backfilling Sat 25/04/20 24 Install Markers Sun 26/04/20 25 Trench Compaction Mon 27/04/20 26 Hydrostatic Testing Thu 30/04/20 27 Install Signs Wed 29/04/20 28 29 Check Unit Wed 06/05/20 30 Assessment & Certification Wed 06/05/20 31 32 Commissioning Sat 09/05/20 33 Testing & Commissioning ProtocolSat 09/05/20 34 Commissioning date Sat 09/05/20 09/05 Internal Piping ID Task Name Finish 06 Apr '20 13 Apr '20 20 Apr '20 27 Apr '20 04 May '20 11 May '20 18 May W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W 0 Internal Piping Fri 15/05/20 1 Drawings Sun 19/04/20 2 Pipeline Facility Drawings Sat 11/04/20 3 Review Mon 13/04/20 4 Supervision Wed 15/04/20 5 Signing and Sealing Sun 19/04/20 6
7 Procurement Fri 17/04/20
8 Piping, tubes, accessories and construction materials Fri 17/04/20 9 Gas Quality Control Laboratory Fri 17/04/20 10
24 Testing & Commissioning Protocol Fri 15/05/20 25 Commissioning Date Fri 15/05/20 15/05 MRS ID Task Name Finish May 2020 June 2020 07 10 13 16 19 22 25 28 01 04 07 10 13 16 19 22 25 28 31 03 1 Drawings Sun 12/04/20 2 3 Facility Drawings Sat 04/04/20 IMPORTANT!! Review Tue 07/04/20 4 Supervision Thu 09/04/20 The MRS projects are highly dependent on the final delivery 5 Signing and Sealing Fri 10/04/20 dates for Filters and Gas Preheater. Any delays will subse- 6 7 Detailed Design Gas Preheater Review Design Gas Preheater Tue 07/04/20 Thu 09/04/20 quently delay the estimated commissioning date. 8 Signing and Sealing Gas Preheater Sun 12/04/20 9 Procurement Sun 17/05/20 10 Electric Material for MRS and Control Room Thu 09/04/20 11 Control Room Construction Devices Thu 09/04/20 12 Piping, Tubes and Accessories for MRS Sat 11/04/20 13 Instrumentation Materials for MRS Sun 03/05/20 14 Consumables Supply Sat 11/04/20 15 Manuel Ansi 900# upstream gas pressure control valve Tue 21/04/20 16 SCADA Fiber optic from Turbines to Control Room Sun 19/04/20 17 Gas Quality Control Laboratory Sun 19/04/20 18 Analog Manometer Sun 26/04/20 19 Analog Thermometer Sun 26/04/20 20 SCADA Communication System w/Battery Thu 16/04/20 21 Pressure Transmitters Sun 17/05/20 22 Differential Pressure Transmitter Sun 17/05/20 23 Temperature Transmitters Sun 17/05/20 24 Gas flow-control valves Thu 23/04/20 25 Regulator Monitor Sun 17/05/20 26 Active Regulator Sun 17/05/20 27 Motorized Valve Sat 18/04/20 28 Slam Shut Sun 17/05/20 29 Gas Preheater with boiler Tue 12/05/20 30 Filters Fri 15/05/20 31 Ultrasonic meters Mon 20/04/20 32 Chromatograph C9 Mon 20/04/20 33 Flow Computer Thu 23/04/20 34 Ansi 900# upstream gas pressure regulating system Thu 23/04/20 35 Construction Wed 27/05/20 36 Construction of Concrete Platform for Control Room Tue 21/04/20 37 Construction of Control Room Mon 27/04/20 38 Pipe Spool Fabrication Sat 25/04/20 39 Welding Sat 25/04/20 40 Welding Inspection Sun 26/04/20 41 Pipe Support Fabrication Tue 21/04/20 42 Pipe Fitting Sat 25/04/20 43 Install Gas flow-control valves Thu 21/05/20 44 Install Regulator Monitor Mon 18/05/20 45 Install Active Regulator Mon 18/05/20 46 Mobilize Crane Ready Sun 19/04/20 47 Install Motorized Valve Fri 24/04/20 48 Install Flow Computer Thu 30/04/20 49 Install Slam Shut Mon 18/05/20 50 Install Filters Sun 17/05/20 51 Field Test Mon 18/05/20 52 Install Analog Manometer and Thermometer Sat 16/05/20 53 Install Ultrasonic Meter Mon 18/05/20 54 Pressure Test Tue 19/05/20 55 Prepare Installation Engineers for Chromatograph Tue 21/04/20 56 Install Chromatograph C9 Mon 27/04/20 57 Install Gas Preheater Sun 24/05/20 58 Install Electrical and Instrumentation Wed 27/05/20 59 Installation of SCADA system Tue 26/05/20 60 Check Unit Sat 30/05/20 61 Assessment incl. Letter Fri 22/05/20 62 Certification Sat 30/05/20 63 APR Can Start Testing Sun 24/05/20 24/05 64 Commissioning Sat 30/05/20 65 Testing & Commissioning Protocol (MR) Mon 25/05/20 66 Commissioning Date Sat 30/05/20 30/05 MRS Critical Path ID Task Name Finish 06 Apr '20 13 Apr '20 20 Apr '20 27 Apr '20 04 May '20 11 May '20 18 May '20 25 May '20 01 Jun '20 WT F S SMTWT F S SMTWT F S SMTWT F S SMTWT F S SMTWT F S SMTWT F S S MTWT F S SMTWT F 1 Procurement Fri 15/05/20