Cradl~-LóÇke

ANTI-VIBRATION STAKES

Above: Cradle-LockAnti- Vibration Stakes are installed


mid-way between support plates in each tube row of the
tops and sides of tube bundles - the areas most susceptible
to tube vibration. The entire bundle may also be staked.

Left: Tubes are "cradled" by indentations at front and


back of each Cradle-Lock stake. As each row is staked,
previous rows are locked into place - without wires, bolts,
or other fasteners.

- -~.-
Cradle-L6Ck,· Anti- Vibration Stakes feature an advanced, patented design that overcomes
the installation and operational disadvantages of conventional stakes.

When installed, the springing action of the "V" shape, coupled with the indentations, locks the
stakes and tubes into a single vibration-free unit. Contact area between the stake and each
tube is increased by a factor of hundreds (conventional stakes offer only one point of contact,
while Cradle-Lock stakes cradle the tube over the surface are of each indentation.) The
stakes do not shift over long periods of full capacity operation, as conventional stakes tend to
do, thereby reducing maintenance costs.

Cradle-L6Ck,· Anti-Vibration Stakes are custom-manufactured to the condenser's tube size


and spacing with specific pre-load and indentation sizes.

For pricing information or to place an order, call, write, or fax:

• THE ATLANTIC GROUP


Condenser Services Division
5426 Robin Hood Road
Norfolk, Virginia 23513
(800) 446-8131 • (804) 857-6400 • FAX (804) 855-9857
Luiz fi'etippe
UPbS/SEMEC
_THE ATLANTIC GROUP
Luiz Felippe
UPI.B/SEMEC

Norfolk Cornrnerce Park, 5426 Robin Hood Road, Norfolk, Va. 23513
(800) 446-8131. (804) 857-6400. FAX: (804) 855-9857

Thank you for your inquiry, through Electric Power International magazine, about our Cradle-Lock" Anti-
\ Vibration Stakes.

The Atlantic Group is Arnerica's largest condenser retubing contractor. We bring to the jobsite specialized
tooling and equiprnent (in many cases, built or modified to our exacting specifications), experienced project
management, supervisors, and technicians, and the experience of more than 68,000,000 linear feet of retubing.
Additional condenser services include tube cleaning, tube plugs, mass spectrometry leak detection, full service
condenser expansion joint replacement, and Cradle-Lock" Anti-Vibration Stakes.

Cradle-Lock" Stakes are stamped from stainless steel in a "V" shape, with dimples at tube locations. When
installed, the spring action of the "V," coupled with the dimples, locks the stakes and the tubes into a single
vibration-free unit. Contact area between the stake and each tube is increased by hundreds of times
(conventional stakes offer only point of contact--ours "cradles" the tube throughout the surface area of each
indentation). The stakes do not shift over long periods of fuIl capacity operation, as conventional stakes do,
thereby reducing maintenance.

Cradle-Lock" Stakes are custom-engineered and manufactured to the individual unit's characteristics (such as
tube size, spacing, and pitch), Each configuration is tested in a 3-bay mockup, duplicating the proposed
installation's support plate spacing, tube materiaIs, and hole pattern, prior to manufacture. This ensures that
the stakes will eliminate existing or potential vibration problems.

Cradle-Lock" Stakes have now become the industry standard in the United States, with more than 238,000
installed in condensers and heat exchangers of all sizes. They have been issued two U.S. Patents, and foreign
patents are pending.

I have enclosed a catalog sheet for Cradle-Lock", along with a list of installations.

If you should have any questions or need additional information, please call, write, or fax me. If you are
experiencing tube vibration, I would we1come the opportunity to discuss your problems, We thank you for
your inquiry, and look forward to the opportunity to work with you.

Robert B. Rahn
Vice President, Condenser Services

The Atlantic Group is a member of the American Nuclear Society and the U. S. Council for Energy Awareness.
-,
"

~'

Anti- Vibration Tube Stakes

Installations

'------------------------GTHEATLANTICGROUP--
('

)'.,
, )

THE ATLANTIC GROUP


Cradle-Lock" Anti-Vibration Tube Stakes

11/24/93 Installations Page -1-

PRIMEOR
PROJECT SCOPE OWNER/LOCATION DATES SUB CONTACT

2,450 pieces fabricated of 304 stainless steel. Baltimore Gas & Feb. P Mr. Steve Welp
Straight design for 7/8" titanium tubes on 1-1/4" Electric Company 1989 Baltimore Gas & Electric Company
centers. Worthington condenser. Crane Station
Crane Station Post Office Box 1475
Baltimore, Maryland 21203
410-260-4867

7,400 pieces fabricated of 304 stainless steel. Baltimore Gas & Nov. P Mr. Steve Welp
Straight design for 7/8" titanium tubes. Worthington Electric Company 1988 Baltimore Gas & Electric Company
condenser. Brandon Shores Station
Brandon Shores Post Office Box 1475
Station Baltimore, Maryland 21203
410-260-4867

4,600 pieces fabricated of 304 stainless steel x .024" Georgia Power Oct. S Mr. Jerry McKenzie
thick x 1-13/16". Straight design for 1" titanium tubes Company 1989 Heat Exchanger Services
on 1-5/16" pitch. Foster Wheeler condenser. 11 Roselle Street
Plant Hatch, Unit 2 Linden, New Jersey 07036
908-925-9245

8,320 pieces fabricated of 304 stainless steel x .024" Alabama Power Jan. P Mr. Davíd Courtney
thick. Straight design for 1" titanium tubes on 1- Company 1990 Alabama Power Company
5/16" centers. BLH condenser. Barry Steam Station
Barry Steam Station, Highway 43 North
Unit #5 Bucks, Alabama 36512
205-829-9521

7,700 pieces fabricated of 304 stainless steel x .024" Georgia Power Mar. S Mr. Jerry McKenzie
thick x 1-13/16". Straight design for 1" titanium tubes Company 1990 Heat Exchanger Services
on 1-5/16" pitch. Foster Wheeler condenser. 11 Roselle Street
Plant Hatch, Unit 1 Linden, New Jersey 07036
908-925-9245

'------------------------------------------OTHEATLANTICGROUP---
"

THE ATLANTIC GROUP


Cradle-Lock" Anü-Vibration Tube Stakes

11/24/93 Installations Page -2-

PRIMEOR
PROJECf SCOPE OWNER/LOCATION DATES SUB CONTACf

8,000 pieces fabricated of 304 stainless steel x .029" Tennessee VaUey Mar. P Mr. Bruce Wilson
thick. Straight design for 7/8" 90110 CuNi tubes on Authority 1990 Tennessee Valley Authority
1-1/8" pitch. Ingersoll-Rand condenser. Sequoyah Nuclear Generating Station
• Sequoyah Post Office Box 200
Soddy Daisy, Tennessee 37379
615-843-7368

1,700 pieces fabricated of 304 stainless steel x .029" United Illuminating Mar. P Mr. Mike Ganci
thick x 1-7/8". Straight design for 7/8" titanium tubes Company 1990 United Illuminating Company
on 1-3/16" ccnters. Foster Wheeler condenser. 10 Henry Street
Bridgeport Harbor Bridgeport, Connecticut 06602
Generating Station 203-368-5577

4,500 pieces fabricated of 304 stainless steel x .029" Illinoís Power Nov. P Mr. Jim Butler
thick x 1-3/4". Straight design for 1" CuNi and 304 Company 1990 Illinois Power Company
stainless steel tubes on 1-1/4" centers. Ingersoll- 500 South 27th Street
Rand condenser. Baldwin Generating Decatur,Illinois 62525
Station 217-424-8367

3,800 pieces fabricated of 304 stainless steel x .029" Amerícan Electric May P Mr. Bob Cashner
thick x 1-3/4". nu" design secured with three pins for Power Company 1990 American Electric Power Company
1" CuNi tubes. Westinghousecondenser. 1 Riverside Plaza
Zimmer Station Columbus,Ohio 43215
614-223-3288

2,944 pieces fabricated of 304 stainless steel x .029" Boston Edison Nov. P Mr. Steve Doody
thick x 1-7/8". Straight design for 7/8" titanium tubes Company 1990 Boston Edison Company
on 1-1/4" centers. Worthington condenser. Mystic Station
Mystic Station, Unit 173 Alfred Street
No. 6 Charlestown, Massachusetts 02129
617-424-3557

"""'---------------------------....:....-------------.THEATLANTJCGROUP--."
THE ATLANTIC GROUP
Cradle-Lock" Anti-Vibrtuion Tube Stakes

11/24/93 Installations Page -3-

PRIMEOR
PROJECT SCOPE OWNER/LOCATION DATES SUB CONTACT

757 pieces fabricated of304 stainless steel x .029" New England Power Nov. P Mr. Mike Hager
thick x 1-7/8". Straight design for 1-1/8" AL-6XN Company 1990 New England Power Service
tubes on 1-3/16" centers. Ingersoll-Rand condenser. 25 Research Drive
Brayton Point Westborough, Massachusetts 01582
Generating Station #3 508-366-9011

7,200 pieces fabricated of 304 stainless steel x .029" Baltimore Gas & Jan. P Mr. Robert J. Pitts
thick x 1-3/4". Both straight and "U" designs for 1" . Electric Company 1991 Baltimore Gas & Electric Company
titanium tubes on 1-1/4" centers. Westinghouse 1000 Brandon Shores Road
condenser. Wagner Generating Baltimore, Maryland 21226
Station, Unit No. 3 410-787-5249

1,575 pieces fabricated of 304 stainless steel x .029" Tampa Electric Jan. P Mr. Chuck Hemrick
thick x 1-7/8". Straight design for 1" 304 stainless Company 1991 Tampa Electric Company
steeI tubes on 1-3/8" centers. Ingersoll-Rand Gannon Station
condenser. Gannon Station, Unit 6820 US 41 North
No. 5 Apollo Beach, Florida 33572
813-228-1885

10,500 pieces fabricated of 304 stainless steel x .029" Potomac Electric Feb. P Mr. Merwin Jones
thick x 1-13/16". Straight design for 1-1/8" titanium Power Company 1991 Potomac Electric Power Company
tubes on 1-3/8" centers. Westinghouse condenser. 1900 Pennsylvania Avenue, N.W.
Morgantown Washington, DC 20068
Generating Station, 202-872-2434
Unit No. 1

3,120 pieces fabricated of 304 stainless steel x .029" Mississippi Power Mar. P Mr. Richard Fairchild
thick x 1-3/4". Straight and "U" design for 1" Company 1991 Mississippi Power Company
titanium tubes on 1-1/4" centers. Ingersoll-Rand Post Office Box 4079
condenser. Watson Generating Gulfport, Mississippi 39501
Station, Unit No. 4 601-865-5316

'- ........:;;;,...- .THEATlANTICGROUP_--


"

THE ATLANTIC GROUP


Cradle-Lock" Anti-Vibration Tube Stakes

11/24/93 Installations Page -4-

PRIMEOR
PROJECf SCOPE OWNER/LOCATION DATES SUB CONTACf

2,450 pieces fabricated of 304 stainless steel x .029" Orange and Rockland Mar. S Mr. Carl Kuester
thick x 1-3/4". Straight design for 1" Seacures tubes Utilities 1991 TECCO
on 1-1/4" centers. Westinghouse condenser. 219 Great Hill Road
• Bowline Point Guildford, Connecticut 06437
Generating Station, 203-457 -0436
Unit No. 2

36,340 pieces fabricated of 304 stainless steel x .029" Detroit Edison Feb. P Mr. Leonard C. Fron
thick x 1-3/4". Straight design for 1" titanium tubes Company 1991 Detroit Edison
on 1-1/4" centers. Ingersoll-Rand condenser. Ferrni #2
Fermi #2 Nuclear 6400 North Dixie Highway
Generating Station Newport, Michigan 48166
313-586-1753

250 pieces fabricated of 304 stainless steel x .029" Iowa Electric Light & May P Mr. Don Smith
thick. "Two piece" design tack welded to provide Power Company 1991 Iowa Electric Light & Power Company
desired dimensions for 7/8" admiralty and stainless Sutherland Generating Station
steel tubes on 1-1/4" centers. AIlis Chalmers Sutherland Generating Post Office Box 537
condenser. Station, Unit No. 1 Marshalltown, Iowa 50158
515-754-5845 .

1,500 pieces fabricated of 304 stainless steel x .029" Northeast Utilities - Sept. P Mr. AI W. Tawrel
thick. "U" design for 1" admiralty and Seacure= Connecticut Light & 1991 Northeast Utilities
tubes on 1-1/4" spacing. Westinghouse condenser. Power Company 100 Corporate Place
Rocky Hill, Connecticut 06067
Middletown Station, 203-665-3486
UnitNo.3

1,750 pieces fabricated of 304 stainless steel x .029" Northeast Utilities - Oct. P Mr. Mark Kimball
thick x 1-3/4". "U" design for 7/8" titanium tubes on Connecticut Light & 1991 Northeast Utilities
fanned diagonal spacing. C.H. Wheeler condenser. Power Company 100 Corporate Place
Rocky Hill, Connecticut 06067
Norwalk Harbor, 203-665-5662
Unit No. 1

'-----------------------------------------GTHEATLANTICGROUP--"'"
THE ATLANTIC GROUP
Cradle-Lock" Anti-Vibration Tube Stakes

11/24/93 Installations Page -5-

PRIMEOR
PROJECf SCOPE OWNER/LOCATION DATES SUB CONTACf

5,600 pieces fabricated of 304 stainless steel x .029" Baltimore Gas & Feb. P Mr. Robert J. Pitts
thick x 1-3/4". Straight design for 1-1/4" titanium Electric Company 1991 Baltimore Gas & Electric Company
tubes on 1-9/16" centers. Foster Wheeler condenser. 1000 Brandon Shores Road
Wagner Generating Baltimore, Maryland 21226
Station, Unit No. 4 410-787-5249

10,500 pieces fabricated of 304 stainless steel x .024" Potomac Electric Mar. P Mr. Merwin Jones
thick x 1-13/16". Straight design for 1-1/8" titanium Power Company 1992 Potomac Electric Power Company
tubes on 1-3/8" centers. Westinghouse condenser. 1900 Pennsylvania Avenue, N.W.
Morgantown Washington,D.e. 20068-0001
Generating Station 202-872-2434

1,200 pieces fabricated of 304 stainless steel x .029" Mississippi Power Mar. P Mr. Richard Fairchild
thick x 1-7/8". "U" design for 1" titanium tubes on Company 1992 Mississippi Power Company
fanned diagonal centers. Lummus Company Post Office Box 4079
condenser. Watson Station, Gulfport, Mississippi 39501
UnitNo.1 601-865-5316

17,000 pieces fabricated of 304 stainless steel x .029" Florida Power Mar. P Mr. Jeff Peet
thick x 1-7/8". Straight design for 1" titanium tubes Corporation 1992 Florida Power Corporation
on 1-5/16" and 1-3/8" x 60· diagonal spacing. Foster Post Office Box 14042
Wheeler condenser. Crystal River St. Petersburg, Florida 33733
Generating Station, 813-866-4984
Unit No. 3 (Nuclear)

1,900 pieces fabricated of 304 stainless steel x .029" Orange & Rockland Mar. P Mr. Ernie Boch
thick x 1-3/4" Straight design for 7/8" seacure= tubes Utilities, Inc. 1992 Orange & Rockland Utilities, Inc.
on 1-18" x 60· diagonal spacing. Westinghouse Tomkins Cove, New York 10986
condenser. Lovett Generating 914-786-8152
Station, Unit No. 5

"""'- $THEATLANTICGROUp---
'.
THE ATLANTIC GROUP
Cradle-Lock" Anti-Vibraüon Tube Stakes

11/24/93 Installations Page -6-

PRIMEOR
PROJECf SCOPE OWNER/LOCATION DATES SUB CONTACf

23,572 pieces fabricated of 304 stainless steel x .029" Los Angeles Apr. P Mr. Paul Arnerich
thick x 1-7/8". Double and "U" type designs for 7/8" Department of Water 1992 Los Angeles Dept. of Water & Power
tubes on multiple pitches. Condenser Services & & Power 161 N. Island Ave.
Energy condenser. • Wilmington, California 90744
Harbor Generating 310-834-3444
Station,
Units No. 4 & 5

11,000 pieces fabricated of 304 stainless steel x .029" Wisconsin Electric Apr. P Mr. Pete Bacalzo
thick x 1-3/4". Straight design for 1" 304 stainless Power Company 1992 Wisconsin Electric Power Company
steel tubes on 1-1/4" x 60° diagonal spacing. 1400 Post Office Box 2146
flats fabricated of 13 gage x 1-1/8" x 24" flat strip Point Beach Nuclear Milwaukee, Wisconsin 53201
(304 stainless steel). Worthington condenser. Generating Station, 414-221-4349
UnitNo.1

15,412 pieces fabricated of 304 stainless steel x .029" Baltimore Gas & Aug. P Mr. H. Boyd Wylie, III
thick x 1-3/4". Straight design for 7/8" titanium tubes Electric Company 1992 Baltimore Gas & Electric Company
on 1-1/4" x 60° diagonal spacing. Worthington 1000 Brandon Shores Rd,
condenser. Crane Station, Baltimore, Maryland 2122~
Unit No. 2 410-787-5245

2,944 pieces fabricated of 304 stainless steel x .029" Boston Edison Sept. P Mr. Steve Doody
thick on 1-7/8". Straight design for 7/8" titanium Company 1992 Boston Edison Company
tubes on 1-1/4" centers. Worthingtoncondenser. 800 Boylston St.
Mystic Station, Boston, Massachusetts 02199
Unit No. 4 617-424-3557

11,000 pieces fabricated of 304 stainless steel x .029" Wisconsin Electric Sept. P Mr. Pete Bacalzo
thick x 1-3/4". Straight design for 1n 304 stainless Power Company 1992 Wisconsin Electric Power Company
steel tubes on 1-1/4" x 60° diagonal spacing. 1400 Post Office Box 2146
flats fabricated of 13 gage x 1-1/8" x 24" flat strip Point Beach Nuclear Milwaukee, Wisconsin 53201
(304 stainless steel). Worthington condenser. Generating Station, 414-221-4349
UnitNo.2

"""-----------------------------------------GTHEATlANTICGROUP---
THE ATLANTIC GROUP
Cradle-Lock" Anti- Vibration Tube Stakes

11/24/93 Installatíons Page -7-

PRIME OR
PROJECT SCOPE OWNERILOCATION DATES SUB CONTACT

16,012 pieces fabricated of 304 stainless steel x .029" Midwest Power Qct, P Mr. Bob Larsen
thick. Straight design for 1" tubes on 1-7/16" Company 1992 Midwest Power Company
díagonal spacing. Foster Wheeler condenser. Post Office Box 778
• Neal Station, Sioux City, lowa 51101
Unit No. 2 712-277-5235

2,400 pieces fabricated of 304 stainless steel x .029" Orange and Rockland Nov. P Mr. Leo Kaufman
thick x 1-3/4". Straight design for 1" titanium tubes Utilities, Inc. 1992 Orange & Rockland Utilitíes, Inc.
on 1-1/4" x 60° diagonal spacing. Westinghouse Samsondale Ave.
condenser. Bowline Station, West Haverstraw, New York 10993
Unit No. 1 914-577-2053

1,200 pieces fabricated of 304 stainless steel x .029" Mississippi Power Jan. P Mr. Richard Fairchild
thick x 1-3/4". "U" design for 1" titanium tubes on Company 1993 Mississippi Power Company
fanned diagonal centers. Lummus Company Post Office Box 4079
condenser. Watson Station, Gulfport, Mississippi 39501
Unit No. 2 601-865-5316

1,750 peices fabricated of 304 stainless steel x .029" Northeast Utilities Jan. P Mr. Mark Kimball
thick x 1-3/4". "U" design for 7/8" titanium tubes on 1993 Northeast Utilities
fanned diagonal spacing. C.H. Wheeler condenser. Norwalk Harbor 100 Corporate Place
Unit No. 2 Rocky HiII, Connecticut 06067
203-665-5662

3,540 pieces fabricated of 304 stainless steel x .029" Mississippi Power Jan. P Mr. Richard Fairchild
thick x 1-13/16". Straight and double designs for 1" Company 1993 Mississippi Power Company
titanium tubes on multiple pitches. C.H. Wheeler Post Office Box 4079
condenser. Watson Station, Gulfport, Mississippi 39501
Unit No. 3 601-865-5316

""'- EtTHEATLANTICGROUp---
THE ATLANTIC GROUP
Cradle-Lock" Anti-Vibration Tube Stakes

11/24/93 Installations Page -8-

PRIMEOR
PROJECf SCOPE OWNER/LOCATION DATES SUB CONTACT

3,000 pieces fabricated of 304 stainless steel x .029" Puerto Rico Electric Feb. P Mr. Hector Cordero
thick x 1-7/8". Straight design for 1" titanium tubes Power Authority 1993 Puerto Rico Electric Power Authority
on 1-3/8" triangular spacing. Delaval condenser. P.O. Box 70151
• Paio Seco San Juan, Puerto Rico 00936
809-722-0441

25,430 pieces fabricated of 304 stainless steel x .029" Commonwealth Edison Mar. P Mr. Mike Fogus
thick x 1-3/4". "U" and straight designs for I" tubes Company 1993 Commonwealth Edison Company
on 1-114"spacing. Ingersoll-Rand condenser. Quad Cities Nuclear Generating Station
Quad Cities 22710 206th Avenue North
Units No. 1 & 2 Cordova, Illinois 61242
309-654-2241

300 pieces fabricated of 304 stainless steel. Cincinnati Gas & Apr. P Cincinnati Gas & Electric Company
Electric Company 1993 Beckjord Station
Route52
Beckjord, New Richmond, Ohio 45157
Unit No. 5 513-553-3126

1,300 pieces fabricated of 304 stainless steel x .029" x Central Hudson Gas & Aug. P Mr. Kurt Doehla
1-13/16". nu" and straight design for 1" tubes on Electric Company 1993 Central Hudson Gas & Electric Company
1-5/16" spacing. Foster Wheeler condenser Danskammer Plant
Danskammer 594 River Road
Unit No. 3 Newburgh, New York 12550
914-561-2468

1,070 pieces fabricated of 304 stainles steel x .029"x Tampa Electric Jun. P Mr. Steve Wright
2". "U" modified and straight design for 1" tubes on Company 1993 Tampa Electric Company
fanned arrangement. 6944 US Highway 41 North
Gannon Station Apollo Beach, Florida 33572
813-228-1111

'-----------------------------------------GTHEATLANTICGROUP---
. ...,

THE ATLANTIC GROUP


Cradle-Lock" Anti-Vibration Tube Stakes

11/24/93 Installa tions Page -9-

PRIMEOR
PROJECf SCOPE OWNER/LOCATION DATES SUB CONTACf

820 pieces fabricated of 304 stainless steel x .029" x Wisconsin Public Aug. P Mr. Alan Grzybowski
1-13/16". Straight design on 7/8" tube on 1-3/16" Service Company 1993 Wisconsin Public Service Company
spacíng. 600 N. Adams Street
• Weston Station Green Bay, Wisconsin 54307
414-433-1304
735 pieces fabricated of T304 stainless steel x .029" Allegheny Oct. P Mr. Robert Sarber
thick x 1/13/16". Straight design for 1" tubes on 1- Power/Potomac Edison 1993 Potomac Edison
5/16" spacing. Allis-Chalmers condenser R. Paul Smith Station
R. Paul Smith Lockward Rd., Routes 63 & 68
Unit No. 4 Williamsport, Maryland 21795
412-830-5923

4,820 pieces fabricated of A-240 304 stainless steel x Northeast Utilities Feb. P Mr. Michael Haeflich
.029" thick x 1-3/4". nu" and straight design for 7/8" 1994 Northeast Utilities
tubes on 1-1/8" spacing. Ingersoll Rand condenser. Millstone Sched- P.O. Box270
Unit No. 1 uled Hartford, Connecticut 06141-0270
203-665-2510