BLK31-NE-BP-IM-IMR-0031

PSVM

IDSNo='BLK31-NE-BP-IM-IMR-0031' AND Revision='C1'

Updated 01 Sep 2008 09:29 CET Updated By Spence, Rob


Preliminary Status
IR Title
Preliminary Response Accepted
ART Guide Funnel centres Final Status

IR No Rev No Date Originated


BLK31-NE-BP-IM-IMR-0031 C1 19 Mar 2008 09:59 CET

Originating Person Originating Company Responding Company


Spence, Rob BP Prog URF1 (HMC)

PART 1 - RAISE INTERFACE REQUEST (IR)


Requesting Party Interface Description:
Level 1 (Package) * SURF (Valves)
Level 2 (System) * Valves
Level 3 (Schedule Reference)
Interface ID

Interface Data Required: *


Spence, Rob 19 Mar 2008 NN

 To facilitate the design of the Actuator Retrieval Tool (ART) can Contractor please provide Company 
with preferred dimensions as indicated in the attached sketch: 
Preferred guide post centres relative to the centreline of the torque Bucket.
Preferred distance between the two landing pads (for the back legs on tool) relative to the centreline of the 
torque Bucket

20080320090540.pdf

Schedule Preliminary Info * Final Info


Required By Dates: 02-Apr-08

Requesting Party Initiator Date Date

Spence, Rob 19 Mar 2008

PART 2 - ACCEPTANCE OF INTERFACE REQUEST


Requesting Party Interface Eng: Accepted Date: Accepted Date:
Doyle, Tom 20 Mar 2008

BP Requesting Party Delivery Lead: Acknowledged Date: Acknowledged Date:


Spence, Rob 19 Mar 2008
BP Requesting Party Interface Eng: Acknowledged Date: Acknowledged Date:

Printed by: Tijn, van Dokkum. 15-Sep-2008 12:30, (ID=1874). Concept By Omega AS. Page 1 of 3
Responding Party Interface Eng: Accepted Date: Accepted Date:
VerDult, Cor 20 Mar 2008

Nominated Responder: Nominated Responder:


Klaassen, Folkert
BP Responding Party Interface Eng: Accepted Date: Accepted Date:
Spence, Rob 20 Mar 2008
BP Responding Party Delivery Lead: BP Responding Party Delivery Lead:
Crawford, Michael Crawford, Michael
Acknowledged Date: Acknowledged Date:
25 Mar 2008

BP Additional BP Additional

Acknowledged Date: Acknowledged Date:

PART 3 - INTERFACE RESPONSE - PRELIMINARY INFORMATION

van Dokkum, Tijn (HM) 28 Jul 2008 05

HMC:
Find attached our present proposal. Info on the actuators and valves is required to progress the checks for 
this design of the actuator removal frame. Best regards, Folkert

Spence, Rob (BP) 01 Jul 2008 04

Please re-submit adding dimensions between the four off guide posts

VerDult, Cor (HM) 30 Jun 2008 03

Please find attached preliminary information.

Spence, Rob (BP) 17 Apr 2008 02

To assist in the above request, please find attached PROVISIONAL 3D file of the Actuator retrieval Tool (ART).
Please be advised that this tool may change subject to detailed design. 

PROVISIONAL Actuator Recovery Tool Assembly.sat

T05 sketch model (view 2).pdf

32095302-110602-SK-0001_00.pdf

PART 4 - ACCEPTANCE OF PRELIMINARY INTERFACE RESPONSE


Responding Party Interface Eng: Accepted: Date:
VerDult, Cor 28 Jul 2008
BP Responding Party Delivery Lead: Acknowledged: Date:
Crawford, Michael 28 Jul 2008

BP Requesting Party Delivery Lead: Acknowledged: Date:


Spence, Rob 04 Aug 2008
Requesting Party Interface Eng: Accepted: Date:
Doyle, Tom 29 Jul 2008

Printed by: Tijn, van Dokkum. 15-Sep-2008 12:30, (ID=1874). Concept By Omega AS. Page 2 of 3
Requesting Party Initiator: Accepted: Date:
Spence, Rob 01 Sep 2008
BP Additional: Acknowledged: Date:

Preliminary Response Rejected/Comment:


Acceptor: Add comment to explain rejection or proposed change
Acknowledger: Add comment or see Interface team (Note: Acknowledger cannot reject)

PART 5 - INTERFACE RESPONSE - FINAL INFORMATION

PART 6 - ACCEPTANCE OF FINAL INTERFACE RESPONSE


Responding Party Interface Eng: Accepted: Date:
VerDult, Cor
BP Responding Party Delivery Lead: Acknowledged: Date:
Crawford, Michael
BP Requesting Party Delivery Lead: Acknowledged: Date:
Spence, Rob
Requesting Party Interface Eng: Accepted: Date:
Doyle, Tom
Requesting Party Initiator: Accepted: Date:
Spence, Rob
BP Additional: Acknowledged: Date:

Final Response Rejected/Comment:


Acceptor: Add comment to explain rejection or proposed change
Acknowledger: Add comment or see Interface team (Note: Acknowledger cannot reject)

Printed by: Tijn, van Dokkum. 15-Sep-2008 12:30, (ID=1874). Concept By Omega AS. Page 3 of 3